1. Economiser
2. Bottom Ring Header
3. Water Walls
4. Upriser
5. Drum and internals
6. Super heaters
7. Reheaters
3R
10
Platen RH FINAL
SH SH
LTSH
D 9
o
w 6
n W W
A A Economiser EH
C O/L
T T EH 4L
o
E E I/L
m 5
e R R 4R
Furnace 8
r
W W To SH / RH
s
A A Attemperation
L L
L L E2 E1 LLCV
Eco
RC FLCV A
Bottom Ring Header
from BFP
FEED LIMB
Contains two Full Load Control Valves (FLCV) and one Low Load
Control Valve (LLCV).
LLCV
E2 E1
FLCV A
Boiler Feed
Pump
FLCV B
Before
After
Swelling
Upto
Here
In
About
case
after,
30%
the
50-60MW
light
ofeffect
Boiler
any
of
FLCV
up,
Boiler
problem
isis
Drum,
will
of
over.
lighted
Load
Unit
feed
water
Now,
inLoad,
(200TPH),
up,
the
FLCV
Regular
wall
swelling
Drum.
LLCV
which
and
LLCV
to
feeding
effect
Economiser
isFLCV
inwill
service,
occurs
change
through
feed are
the
another
inover
the
LLCV
filled
Drum.
drum.
is is
FLCV
up
done.
by
back after
Only
initiated.
should feeding
be cut
theusing
in.
completion
Low Pointof Swelling
Drains. effect, regular feeding
through Feed Limb is done.
July 23, 2020 8
FEED LIMB CHANGE OVER
Boiler Feed Pump Scoop and Feed Limb jointly controls the
Drum Level.
The method used in Drum Level Control in a Thermal power
Station is Three Element Control.
BFP
DRUM
P2 = Pressure at Drum.
X = Pressure Loss in pipe line.
(2) Can be rewritten as P1 = P2 + ∆P, where ∆P= Extra pressure+ pressure loss.
BFP
Normalises Drum
ECONOMISER
Primary separator.
Secondary separator.
Wire-mesh separator.
EBD
CBD
Phosphate Dozing.
DRUM SEPARATORS
PRIMARY WIRE-MESH
SEPARATOR SEPARATOR.
SECONDARY
SEPARATOR
WIRE-MESH SEPARATOR 1
Emergency blow-down.
Starts draining Drum if level raises to +150mm.
Stops draining the Drum if Drum level lowers down to -50mm.
Take-off point inside Drum.
No valve at Drum side.
Two electric valves are at 18m level.
Very first valve is of isolation type.
The next valve is of regulation type.
Delivers water to IBD Flash Tank.
EBD delivery is connected to Boiler Drain Header and then goes
to IBD FT.
Normally used only during Drum Swelling periods.
July 23, 2020 41
EBD
VENT
DRUM
EBD LINE
IBD FT
Done at Drum.
Done continuously to remove Silica.
Silica by itself will be removed where temperature is more than
300C and pressure is within 60 to 160ksc.
These conditions are fairly available in the Drum.
Silica is removed maximum by Temperature and upto some
extent by Tri Sodium Phosphate (TSP) Dozing.
TSP converts silica in water into Silicates (precipitates).
These precipitates are easily disposed off through CBD.
If silica is less (<0.2ppm), then Steam at CBD FT can be
reutilised in FWST.
At Lower Pressure and Temperature, Silica will be more affinitive
to Water and hence water from CBD opening is drained off.
To FWST
TSP Dozing
CBD FT LCV
WHY?
THICKNESS 36.4mm.
TWO NUMBERS.
Thickness 49.2mm.
TWO NUMBERS
Thickness 32.2mm
TWO NUMBERS
Thickness 12.7mm.
WEIGHT 130 T
Bypass for warming up. MSSVs for regular use & box-up
July 23, 2020 66
RE HEATERS
Hot Reheat steam goes to IPT for expansion there at IPT and
LPT.