0% found this document useful (0 votes)
91 views2 pages

Persona Example Template 0

Sally is a 40-year-old facility specialist with 7 years of experience who is responsible for office and data center buildings. As the person who makes energy consumption decisions, she must balance energy efficiency and workplace comfort. She spends over half her time outside the office visiting buildings but needs to quickly record time spent on various projects. Her current timesheet system is too complex and time-consuming.

Uploaded by

Amit Kumar Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views2 pages

Persona Example Template 0

Sally is a 40-year-old facility specialist with 7 years of experience who is responsible for office and data center buildings. As the person who makes energy consumption decisions, she must balance energy efficiency and workplace comfort. She spends over half her time outside the office visiting buildings but needs to quickly record time spent on various projects. Her current timesheet system is too complex and time-consuming.

Uploaded by

Amit Kumar Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SA L LY

The Specialist

“ I like get things done quickly since I am on


the move all the time, dealing with million
things. ”

40, married, 7 years of facility specialist experience

Being the person who makes the energy consumption decisions, I


have to keep the balance between improving the energy efficiency
and our working comfort.

Very mobile, moving from building to building during the day

Chief Facility Engineer, Technicians, Admins

• I am responsible for office and data center buildings. • Being the person who makes the energy consumption decision, I have to
keep the balance between improving the energy efficiency and our working
• I am responsible for multiple projects per week and each project is comfort.
tied to a specific building.
• Better management of actual time spent in each building.
• I spend more than half of my time outside my office, but I also do
work on the computer, in my office.

• I enter time once a week on a project by project basis.

• I always need the project building number to record time. It can • Can’t record time quickly on the go.
become hard to locate.
• The timesheet entry is very complex, and very time consuming.
• I need to know the amount of time spent on a project. Currently I
• Need to see the weekly view of complete and incomplete entries.
take notes on paper.
• Need the ability to bulk enter.
• I need the ability to record time instantly since I am away from my
desk most of the time.
NAME
Role

“ Quote ”

Paste a photo
Fill with background information describing the demographic (if
exists), work context, overall goals and tasks

Fill with stakeholder information

• Fill the bulleted list • Fill the bulleted list

• Fill the bulleted list • Fill the bulleted list

You might also like