0% found this document useful (0 votes)
478 views5 pages

Ejemplo 8.15 Seader: Edward Alejandro Torres

This document describes a countercurrent extraction system involving 500 kg/h of a 40% docosane-diphenylhexane mixture extracting with 500 kg/h of a 98% furfural solvent. The goal is to produce a raffinate with 5% DPH. The document asks to calculate the number of stages required and the kg/h of DPH in the extract at 45C and 80C, using a right-triangle diagram. A diagram is provided showing the concentration of DPH in docosane at different stages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
478 views5 pages

Ejemplo 8.15 Seader: Edward Alejandro Torres

This document describes a countercurrent extraction system involving 500 kg/h of a 40% docosane-diphenylhexane mixture extracting with 500 kg/h of a 98% furfural solvent. The goal is to produce a raffinate with 5% DPH. The document asks to calculate the number of stages required and the kg/h of DPH in the extract at 45C and 80C, using a right-triangle diagram. A diagram is provided showing the concentration of DPH in docosane at different stages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Ejemplo 8.

15 Seader
Edward Alejandro Torres
Example 8.15

• The system docosane–diphenylhexane (DPH)–furfural is


representative of complex systems encountered in the solvent
refining of lubricating oils. Five hundred kg/h of a 40 wt% mixture
of DPH in docosane are to be extracted in a countercurrent system
with 500 kg/h of a solvent containing 98 wt% furfural and 2 wt%
DPH to produce a raffinate of 5 wt% DPH. Calculate, with a right-
triangle diagram, the stages required and the kg/h of DPH in the
extract at 45C and 80C
Datos a graficar
Diagrama

0.9

0.8

0.7

0.6

0.5
DPH

0.4

0.3

0.2

0.1

0
0 0.2 0.4 0.6 0.8 1

Docosano
1
0 1
0 1.00E+00

0.9
0.1 0.9
0.1 8.89E-01
0.8
0.8
0.2
0.2
7.78E-01
0.7 0.7
0.3 0.3
6.67E-01
0.6 0.6
0.4 0.4
5.56E-01
0.5 0.5
0.5 0.5

0.4 4.44E-01
0.4
0.6 0.6

0.3 0.3 3.33E-01


0.7 0.7

0.2 0.2 2.22E-01


0.8 0.8

0.1 0.1
0.9 1.11E-01
0.9

0 0
1 1 0.00E+00
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

You might also like