The document discusses the corrective maintenance performed on a valve in an industrial pipeline. It describes disassembling the valve carefully and examining parts for damage. The actuator was refurbished by cleaning and sandblasting parts. During reassembly, the cylinder was greased and the diaphragm, stem seal, and actuator spring were replaced carefully. The positioner and I/P transducer were also maintained by checking for leaks, vibration issues, and replacing relays as needed. Proper examination and maintenance was emphasized during the corrective maintenance of the valve.
The document discusses the corrective maintenance performed on a valve in an industrial pipeline. It describes disassembling the valve carefully and examining parts for damage. The actuator was refurbished by cleaning and sandblasting parts. During reassembly, the cylinder was greased and the diaphragm, stem seal, and actuator spring were replaced carefully. The positioner and I/P transducer were also maintained by checking for leaks, vibration issues, and replacing relays as needed. Proper examination and maintenance was emphasized during the corrective maintenance of the valve.
The document discusses the corrective maintenance performed on a valve in an industrial pipeline. It describes disassembling the valve carefully and examining parts for damage. The actuator was refurbished by cleaning and sandblasting parts. During reassembly, the cylinder was greased and the diaphragm, stem seal, and actuator spring were replaced carefully. The positioner and I/P transducer were also maintained by checking for leaks, vibration issues, and replacing relays as needed. Proper examination and maintenance was emphasized during the corrective maintenance of the valve.
The document discusses the corrective maintenance performed on a valve in an industrial pipeline. It describes disassembling the valve carefully and examining parts for damage. The actuator was refurbished by cleaning and sandblasting parts. During reassembly, the cylinder was greased and the diaphragm, stem seal, and actuator spring were replaced carefully. The positioner and I/P transducer were also maintained by checking for leaks, vibration issues, and replacing relays as needed. Proper examination and maintenance was emphasized during the corrective maintenance of the valve.
Download as PPTX, PDF, TXT or read online from Scribd
Download as pptx, pdf, or txt
You are on page 1of 4
Name :
M Kamran Aziz Roll No : 16 Subject : Maintenance Engineering Submitted to : Mam Sadiya Mushtaq Corrective maintenance of Valve
Corrective Maintenance known as a breakdown or
run to failure maintenance. Maintenance is only done after the equipment or machine is damaged. Corrective Maintenance is a maintenance activity carried out to overcome failures or damage found during the preventive maintenance period Following tasks has been done for the Corrective maintenance of Valve installed in industrial pipe line. • Disassembling the valve: Loosen and remove each stud slowly, being cautious of any trapped fluids or leaking isolation valves. As the studs are removed and bagged, they should be checked for nicks and burrs on the threads, which could cause a faulty torque reading.Remove the actuator installation bolts. Pull the actuator away from the stem either with a removal tool or by hand. Careful examination must be taken during disassembling of valve. • Actuator maintenance: The actuator should be refurbished. The actuator should be disassembled as per the manufacturer’s user manual and clean the parts. Sandblasting the internal diaphragm housing can eliminate rust and corrosion, but the inside must be completely free of particulates or grit prior to reassembly.The cylinder should be well greased to permit the piston-seal to travel throughout it range. During the replacement of Diaphragm,Stem Seal And Actuator spring there must be a careful examination should be taken for assembly of each part • Positioner Maintenance: The electronic positioner should not be mounted on the valve that exihibits high vibration. Mounting the positioner to the valve is critical to its proper operation. Most positioners are aligned to the valve while the valve is at its mid- stroke. Positioner leakage is the basic concern. Air leakage and Relay replacement should be examined and performed if required
• I/P Transducer Maintenance: I/P transducer cannot be mounted to
the valve with high vibration. The high vibration produced by some valves affects the balance bar. Air Leaks and Relay Replacement- Many air leaks, either internal or downstream from the transducer, are the major concern with transducers. When replacing the relay, some type of seal goes between the main unit and the relay. Seal the relays using proper lubricants.