Presentation Outline
2
NDP PILLARS AND THE SEVEN
(7) APEX PRIORITIES
3
NDP Pillars aligned to the Seven (7) Apex
Priorities of the 6th Administration
5
DoT STRATEGIC OVERVIEW
6
DoT Vision and Mission
Vision
Mission
7
DoT Values
• Maintain fairness and equity in all our operations
8
DoT Priority Focus Areas
1. SAFETY as an enabler of service delivery
2. PUBLIC TRANSPORT that enables social emancipation and an economy that works
9
DoT Delivery Programmes
• Programme 1: Administration
10
DoT STRATEGIC PLAN
11
DoT Impact Statement
12
DoT PRIORITY FOCUS AREA 1:
SAFETY AS AN ENABLER OF
SERVICE DELIVERY
13
SAFETY
NDP Pillar 2: Capabilities of South Africans
Improved • % reduction in road • 12 921 road crash • 25% (Road crash fatalities
transport crash fatalities fatalities per annum reduced from 12 921 to 9 690)
safety and
• Number of rail safety • 1 400 rail safety • 1 140 rail safety occurrences
security
occurrences reported occurrences
• Number of rail security • 4 676 rail security • 4 100 rail security occurences
occurences reported occurences
14
SAFETY(continued)
NDP Pillar 2: Capabilities of South Africans
Improved • % reduction in fatal accidents • Zero (0) fatal • Maintain the zero (0) fatal
transport in scheduled commercial accidents accident rate
safety and aviation
security • % reduction in fatal accidents • 20 fatal accidents • 50% (Fatal accidents reduced
in general aviation from 20 to 10)
• Reduction in reportable • Ten (10) reportable • Below five (5) reportable
maritime safety incidents rate maritime safety maritime safety incident rate
incident rate
• Reduction in maritime fatality • Two (2) maritime • Below one (1) maritime fatality
rate fatality rate rate
15
DoT PRIORITY FOCUS AREA 2:
16
PUBLIC TRANSPORT
NDP Pillar 2: Capabilities of South Africans
Priority 5: Spatial Integration, Human Settlements and Local Government
MTSF Programme: Basic Service Delivery
Sub-Programme: Public Transport
Improved • Expanded funding • No direct operational subsidy for • Revised Public Transport
accessibility, scope for public minibus taxis Funding Model approved
quality and transport • Capital Subsidy through the Taxi and implemented
reliability of Recapitalisation Programme
public • Fragmented funding sources for
transport land-based public transport
• Number of cities • 6 cities currently operating • 13 cities operating IPTNs
operating integrated IPTNs
public transport
networks
17
PUBLIC TRANSPORT(continued)
NDP Pillar 2: Capabilities of South Africans
Priority 5: Spatial Integration, Human Settlements and Local Government
MTSF Programme: Basic Service Delivery
Sub-Programme: Public Transport
OUTCOME OUTCOME INDICATOR BASELINE FIVE-YEAR TARGET
Improved • Number of average • 165 000 average weekday • 350 000 average weekday
accessibility, weekday passenger trips trips passenger trips
quality and across IPTNs in 13
reliability of selected cities
public • Number of passenger rail • 213 million passenger trips • 520 million passenger trips
transport trips
• Improved rural access • 6 district municipalities • 16 district municipalities
and mobility assisted with IPTN plans assisted with IPTN plans
• 90 000 bicycles distributed • 135 000 bicycles distributed
in selected district
municipalities
18
DoT PRIORITY FOCUS AREA 3:
19
INFRASTRUCTURE AND JOB
CREATION
NDP Pillar 1: A Strong and Inclusive Economy
Priority 2: Economic Transformation and Job Creation
MTSF Programme: Economy and Jobs
Sub-Programme: Competitive and Accessible Markets
OUTCOME
OUTCOME BASELINE FIVE-YEAR TARGET
INDICATOR
Increased access • Increased investment • Zero base • Private Sector Participation (PSP) Framework
to affordable and in transport developed and implemented
reliable transport infrastructure • High Speed Rail (HSR) Framework developed
systems
and implemented
PRASA Rolling Stock Fleet
Renewal Programme
•23 train sets deployed •290 new train sets deployed in priority
corridors
PRASA Modernisation
Programme
20
•28 stations modernised •56 stations modernised
INFRASTRUCTURE AND JOB
CREATION(continued)
NDP Pillar 1: A Strong and Inclusive Economy
21
INFRASTRUCTURE AND JOB
CREATION(continued)
NDP Pillar 1: A Strong and Inclusive Economy
Priority 2: Economic Transformation and Job Creation
MTSF Programme: Economy and Jobs
Sub-Programme: Competitive and Accessible Markets
OUTCOME OUTCOME INDICATOR BASELINE FIVE-YEAR TARGET
Reduced impact on • % freight moved from • 6.1 million tons • 10% of road freight transferred to
road infrastructure road to rail rail
Decent jobs • Number of jobs created PRASA Infrastructure
sustained and created Development Programme
•1 688 •8 412
23
DoT PRIORITY FOCUS AREA 4:
24
MARITIME
NDP Pillar 1: A Strong and Inclusive Economy
Increased access • Increased efficiency • National Ports Authority • Transnet National Ports
to affordable and of the port system (TNPA) is a division of Authority (TNPA) corporatized
reliable transport Transnet
systems • Operation Phakisa • Refurbishment, maintenance
Oceans Economy and construction of new port
infrastructure monitored in
identified ports as per the
Three-Foot Plan
• Improved maritime • Draft Merchant Shipping • Merchant Shipping Act
regulatory Bill promulgated and implemented
environment
25
DoT PRIORITY FOCUS AREA 5:
ACCELERATING
TRANSFORMATION TOWARDS
GREATER ECONOMIC
PARTICIPATION
26
TRANSFORMATION
NDP Pillar 1: A Strong and Inclusive Economy
Priority 2: Economic Transformation and Job Creation
MTSF Programme: Economy and Jobs
Sub-Programme: Competitive and Accessible Markets
OUTCOME OUTCOME INDICATOR BASELINE FIVE-YEAR TARGET
Increased • Improved regulation • ERT Bill approved for • Single Transport Economic
access to and competitiveness submission to Cabinet Regulator (STER) established
affordable and and operationalized
reliable transport • Lack of an overarching • National Rail Act developed
systems rail legislative framework and implemented
• % increase in • 1.9% Young Technical • 1.5%
previously Talent, ATC, AME and
disadvantaged aeronautical engineering
individuals with critical disciplines introduced at
and scarce skills in undergraduate levels
technical aviation
27
occupations
TRANSFORMATION(continued)
NDP Pillar 1: A Strong and Inclusive Economy
Priority 2: Economic Transformation and Job Creation
MTSF Programme: Economy and Jobs
Sub-Programme: Competitive and Accessible Markets
OUTCOME OUTCOME INDICATOR BASELINE FIVE-YEAR TARGET
Increased • Competitive ship • Five merchant vessels • Ten (10) merchant vessels
access to registration system registered on the South registered on the South African
affordable and African Ship Register Ship Register
reliable transport
systems
28
DoT PRIORITY FOCUS AREA 6:
ENVIRONMENTAL PROTECTION –
RECOVERING AND MAINTAINING A
HEALTHY NATURAL ENVIRONMENT
31
ENVIRONMENTAL PROTECTION
33
HUMAN RESOURCE MANAGEMENT
AND DEVELOPMENT
NDP Pillar 2: Capabilities of South Africans
Improved sector • % reduction in vacancy rate • 14.7% (DoT) • Vacancy rate decreased
skills and to 10% and below
capacity • % of staff establishment • 326 employees trained • 60%
trained as per the
Department’s Skills Plan
34
GOVERNANCE AND INTERNAL
CONTROL ENVIRONMENT
NDP Pillar 3: A Capable State
Improved • AGSA audit opinion as per the • Unqualified Audit • Unqualified Audit Report
governance and Public Audit Act (No. 25 of Report with findings with no significant
strengthened 2004) findings (Clean Audit
control Report)
environment
35
DoT ANNUAL PERFORMANCE PLAN
2020/21
36
PROGRAMME 1:
ADMINISTRATION
37
OFFICE OF THE DIRECTOR-GENERAL
SUB-PROGRAMME: STRATEGIC PLANNING, MONITORING AND
EVALUATION
Annual Targets
Estimated
Performance Output MTEF Period
Output Performance
Outcome Indicator
2019/20 2020/21 2021/22 2022/23
38
OFFICE OF THE CHIEF OPERATIONS
OFFICER (COO)
SUB-PROGRAMME: HUMAN RESOURCE MANAGEMENT AND
DEVELOPMENT
Annual Targets
Estimated
Performance Output MTEF Period
Output Performance
Outcome Indicator
Skills Development
Number of interns - 50 - 50
employed
39
OFFICE OF THE CHIEF FINANCIAL
OFFICER (CFO)
SUB-PROGRAMME: BUDGETING AND COMPLIANCE
Annual Targets
Improved Implementation of Annual Progress Annual Progress Annual Annual Progress Annual Progress
governance and action plan to Report on the Report on the Progress Report on the Report on the
strengthened address audit implementation of implementation of Report on the implementation of implementation of
control findings action plan to action plan to action plan to action plan to
implementatio
environment address audit address audit address audit address audit
n of action
findings findings findings findings
plan to
developed
address audit
findings
40
PROGRAMME 2:
INTEGRATED TRANSPORT
PLANNING
41
SUB-PROGRAMME:
RESEARCH AND INNOVATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Innovation
Improved Regulations for Regulations for Literature review Guidelines for Recommendations Draft Regulations
competitiveness Autonomous Autonomous on Autonomous testing, licencing for amendment of for Autonomous
through adoption Vehicle Technology Vehicle Technology Vehicle legislation finalised Vehicle Technology
and legislation of
of new technology approved Technology and approved developed
Autonomous
vehicle
technology
developed
Reduction in Greenhouse Emission and Pollution
Natural resources Implementation of Carbon Emission - Draft Framework Draft Procurement Approved
managed and the Green Transition Plan for the alignment Guidelines for Procurement
impact of climate Transport Strategy implemented Electric Vehicles Guidelines for
of Electric
change minimised developed Electric Vehicles
Vehicles
Regulations
developed
42
SUB-PROGRAMME:
MODELLING AND ECONOMIC ANALYSIS
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Public Transport
Improved National Household National Household NHTS Pilot Statistical NHTS provincial Thematic reports
accessibility, Travel Survey Travel Survey Survey conducted reports produced:
release of the
quality and (NHTS) Report (NHTS) conducted and
NHTS Analytical
reliability of public data collected •Household
transport Report Expenditure on
Public Transport,
•Non-Motorized
Transport 43
SUB-PROGRAMME:
REGIONAL INTEGRATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
44
PROGRAMME 3:
RAIL TRANSPORT
45
SUB-PROGRAMME:
RAIL REGULATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
public
consultations)
Safer Transport Systems
Improved Railway Safety Act Railway Safety Bill Railway Safety Railway Safety Railway Safety Bill Regulations for the
transport safety approved by Bill approved by approved by Railway Safety Act
Bill submitted to
and security Parliament Cabinet for Parliament developed
Parliament
introduction to
Parliament
46
SUB-PROGRAMME:
RAIL INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Increased access Private Sector Private Sector - Draft Private Private Sector Private Sector
to affordable and Participation (PSP) Participation (PSP) Participation (PSP) Participation (PSP)
Sector
reliable transport Framework Framework approved Framework Framework
Participation
systems by Cabinet approved for approved by
(PSP) submission to Cabinet
Framework Cabinet
developed
High-Speed Rail High-Speed Rail - High-Speed Rail High-Speed Rail High-Speed Rail
(HSR) Corridor (HSR) Corridor (HSR) Corridor (HSR) Corridor
(HSR) Corridor
Framework Framework approved Framework Framework
Framework
by Cabinet approved for approved by
developed submission to Cabinet
Cabinet
47
SUB-PROGRAMME:
RAIL INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Annual Targets
Estimated
Performance Performanc MTEF Period
Output Output Indicator
Outcome e
Passenger Rail Agency of South • Number of new train sets rolled-out • 42 new train sets Annual Progress Report
Africa (PRASA) in priority corridors signed off by PRASA
• Number of stations modernised • 5 stations Accounting Authority
49
SUB-PROGRAMME:
RAIL OPERATIONS
Annual Targets
Estimated
Performance Performanc MTEF Period
Output Output Indicator
Outcome e
Public Transport
Improved Rail passenger Number of rail - Analysis Report on Analysis Report on Analysis Report
accessibility, trips passenger trips PRASA Rail PRASA Rail on PRASA Rail
quality and Operations Operations Operations
reliability of public
transport
Safer Transport Systems
Improved Reduction in rail Number of rail 1 400 1 333 1 266 1 202
transport safety safety safety
and security occurences occurrences
reported
Reduction in rail Number of rail 4 676 4 521 4 431 4 299
security security
occurences occurrences
50
reported
SUB-PROGRAMME:
RAIL OPERATIONS (cont…)
Public Transport
Passenger Rail Agency of South Number of passenger rail trips • 240 million passenger Annual Progress Report
Africa (PRASA) rail trips signed off by PRASA
Accounting Authority
Passenger Rail Agency of South Number of rail safety occurences • 1 333 rail safety Annual Progress Report
Africa (PRASA) reported occurences signed off by PRASA
reported occurences
51
PROGRAMME 4:
ROAD TRANSPORT
52
SUB-PROGRAMME:
ROAD TRANSPORT REGULATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
55
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Increased Expansion and Surfaced roads - Analysis Report Analysis Report Analysis Report
access to maintenance of maintained on the SANRAL on the SANRAL on the SANRAL
affordable and national roads Road Road Road
reliable Maintenance Maintenance
Maintenance
transport Programme Programme
Programme
systems
Maintenance of Surfaced roads Provincial Road Analysis Report Analysis Report Analysis Report
provincial roads maintained Maintenance on the on the Provincial on the Provincial
Programme Provincial Road Road Road
Gravel roads monitored Maintenance Maintenance
Maintenance
maintained Programme Programme
Programme
56
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
57
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Institution Output Indicator Annual Target Data Source
South African National • Kilometres of surfaced roads • 22 214 km Annual Monitoring Report
Roads Agency Limited maintained (National) signed off by SANRAL
(SANRAL) Accounting Authority
Construction
•Number of kilometres of gravel •200 km
roads upgraded to surfaced roads
58
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Institution Output Indicator Annual Target Data Source
59
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Institution Output Indicator Annual Target Data Source
60
SUB-PROGRAMME:
ROAD INFRASTRUCTURE AND INDUSTRY
DEVELOPMENT (cont…)
Institution Output Indicator Annual Target Data Source
61
PROGRAMME 5:
CIVIL AVIATION
62
SUB-PROGRAMME:
AVIATION POLICY AND REGULATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Increased Air Service Act Air Service Bill Socio-Economic Draft Air Service Air Service Bill Air Service Bill
access to promulgated approved by Impact Bill submitted to approved by approved by
affordable and Parliament Assessment Cabinet Cabinet for Parliament
reliable conducted on introduction in
transport the Draft Air Parliament
systems Services Bill
Decent jobs Implementation of Number of jobs - Annual Analysis Annual Analysis Annual Analysis
sustained and Aviation created Report on jobs Report on jobs Report on jobs
created Infrastructure created through created through created through
Programmes Aviation Aviation
Aviation
(ACSA and Infrastructure Infrastructure
Infrastructure
ATNS) Programmes Programmes
Programmes
63
SUB-PROGRAMME:
AVIATION POLICY AND REGULATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Innovation
64
SUB-PROGRAMME:
AVIATION POLICY AND REGULATION
(cont…)
Institution Output Indicator Annual Target Data Source
Airports Company South • Number of jobs created • 1 269 Annual Monitoring Report
Africa (ACSA) signed off by ACSA
• Number of full-time equivalents (FTEs) • 3 407 Accounting Authority
created
65
SUB-PROGRAMME:
AVIATION POLICY AND REGULATION
(cont…)
Institution Output Indicator Annual Target Data Source
66
SUB-PROGRAMME:
AVIATION POLICY AND REGULATION
(cont…)
Innovation
South African Civil Aviation • Review Regulations for Remotely- • Reviewed Regulations Draft Reviewed Regulations
Authority (SACAA) Piloted Aircraft System (RPAS) for Remotely-Piloted for Remotely-Piloted Aircraft
67
SUB-PROGRAMME:
AVIATION ECONOMICS AND INDUSTRY
DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
68
SUB-PROGRAMME:
AVIATION SAFETY, SECURITY,
ENVIRONMENT AND SEARCH & RESCUE
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
70
SUB-PROGRAMME:
AVIATION SAFETY, SECURITY,
ENVIRONMENT AND SEARCH & RESCUE
(cont…)
Institution Output Indicator Annual Target Data Source
South African Civil Aviation • Number of fatal accidents recorded in • 0 Annual Progress Report
Authority scheduled commercial aviation (State of Safety Report)
signed off by the Director of
Civil Aviation
• % reduction in fatal accidents recorded • 10% reduction
in general aviation
71
PROGRAMME 6:
MARITIME TRANSPORT
72
SUB-PROGRAMME:
MARITIME POLICY AND LEGISLATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
74
SUB-PROGRAMME:
MARITIME INFRASTRUCTURE AND
INDUSTRY DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
75
SUB-PROGRAMME:
MARITIME IMPLEMENTATION,
MONITORING AND EVALUATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
76
SUB-PROGRAMME:
MARITIME IMPLEMENTATION,
MONITORING AND EVALUATION (cont…)
Institution Output Indicator Annual Target Data Source
South African Maritime • Reportable maritime safety incident • Below ten (10) Annual Progress Report (State
Safety Authority (SAMSA) rate recorded for all types of vessels reportable maritime of Safety Report) signed off by
South African Maritime • Maritime pollution incident rate for all • Below two (2) maritime Annual Progress Report (State
Safety Authority (SAMSA) types of vessels pollution rate of Safety Report) signed off by
the SAMSA Accounting
Authority
77
PROGRAMME 7:
PUBLIC TRANSPORT
78
SUB-PROGRAMME:
PUBLIC TRANSPORT NETWORK
DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
2019/20 2020/21 2021/22 2022/23
Innovation
Improved Single Ticketing Integrated Single - Reviewed Pilot phase of the Full implementation
competitiveness System for all Ticketing System Regulations for Integrated Single of the Integrated
through adoption government- implemented Ticketing System Single Ticketing
Integrated Single
of new technology subsidized public rolled out on System rolled out
Ticketing System
transport operators subsidised public for all subsidized
approved
transport operations public transport
operators
Public Transport
Improved Implementation of Number of cities Integrated Public Integrated Public Integrated Public Integrated Public
accessibility, the Integrated operating integrated Transport Transport Network Transport Network Transport Network
quality and Public Transport public transport Network (IPTN) (IPTN) Programme (IPTN) Programme
(IPTN) Programme
reliability of public Network (IPTN) networks Programme monitored monitored
monitored
transport Programme monitored
•6 cities •7 cities operating •9 cities operating •10 cities operating
operating IPTNs IPTNs IPTNs IPTNs
79
SUB-PROGRAMME:
PUBLIC TRANSPORT REGULATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Public Transport
Improved Transport Appeal Transport Appeal Draft Transport Transport Appeal Transport Appeal Draft Regulations
accessibility, Tribunal (TAT) Tribunal (TAT) Appeal Tribunal (TAT) Tribunal (TAT) for the Transport
quality and Amendment Act Amendment Bill Tribunal (TAT) Amendment Bill Amendment Bill Appeal Tribunal
reliability of approved by Amendment approved by (TAT)
submitted to and
public transport Parliament Bill tabled in Parliament Amendment Act
processed
Cabinet
through
Parliament
80
SUB-PROGRAMME:
PUBLIC TRANSPORT INDUSTRY
DEVELOPMENT
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Public Transport
Improved Public Transport Approved Public - Public Transport Revised Public Revised Public
accessibility, Funding Model Transport Funding Model Transport Transport
quality and Funding Model reviewed Funding Model Funding Model
reliability of implemented developed approved for
public transport implementation
Public Transport Public Transport Public Annual Annual Annual
Operations Grant Operations Transport Monitoring Monitoring Report Monitoring Report
Monitoring monitored in operations Report on public on public on public
provinces monitored in transport transport
transport
provinces operations in operations in
operations in
provinces provinces
provinces
81
SUB-PROGRAMME:
PUBLIC TRANSPORT INDUSTRY
DEVELOPMENT (cont…)
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
82
SUB-PROGRAMME:
PUBLIC TRANSPORT INDUSTRY
DEVELOPMENT (cont…)
Institution Output Indicator Annual Target Data Source
83
SUB-PROGRAMME:
RURAL AND SCHOLAR TRANSPORT
IMPLEMENTATION
Annual Targets
Estimated
Performance MTEF Period
Output Output Indicator Performance
Outcome
Public Transport
Improved Integrated Public Number of District Two (2) Two (2) Two (2) Two (2)
accessibility, Transport Municipalities
quality and Network (IPTN) assisted with •Amathole District •Mopani District
reliability of plans in District IPTN plans Municipality Municipality
public transport municipalities
•Capricorn District •Chris Hani District
Municipality
Municipality
85
CONTENTS
– PRASA
– PTOG
– PTNG
– PRMG
Ten year review
R'000 2020/21 2021/22 2021/23 2020/21 2021/22 2021/23 2020/21 2021/22 2022/23
1 Administration
493 345 523 196 542 725 (1 538) (1 638) 0 491 807 521 557 542 725
2 Integrated Transport
Planning 104 879 108 231 112 264 (370) (393) 0 104 509 107 838 112 264
3 Rail Transport
17 664 291 21 928 599 23 053 118 (4 469 092) (2 779 721) (1 350 951) 13 195 199 19 148 878 21 702 167
4 Road Transport
34 329 238 35 132 662 36 971 020 (12 535) (1 096 824) (2 661 429) 33 816 702 34 035 838 34 309 591
5 Civil Aviation
258 960 273 248 283 431 (18 260) (17 828) (19 567) 240 700 255 420 263 864
6 Maritime Transport
144 515 152 790 158 990 4 842 (169) 0 149 357 152 620 158 990
7 Public Transport
15 092 694 16 383 189 17 160 308 (1 054 717) (1 570 782) (2 021 941) 14 037 977 14 812 409 15 138 367
Total
68 087 922 74 501 915 78 281 854 (5 551 670) (5 467 355) (6 053 888) 62 036 252 69 034 560 72 227 966
Direct Charge: Foreign
International fees
10 997 11 602 12034 0 0 0 10 997 11 602 12 034
Total 68 098 919 74 513 517 78 293 888 (5 551 670) (5 467 355) (6 053 888) 62 047 249 69 046 162 72 240 000
MTEF BASELINE ALLOCATION PER ECONOMIC
CLASSIFICATION
R'000
2020/21 2021/22 2021/23 2020/21 2021/22 2021/23 2020/21 2021/22 2022/23
Compensation of employees
574 848 612 212 635 003 (3 449) (3 673) 0 571 399 608 539 635 003
Goods and services
896 926 943 209 978 400 (17 939) (17 485) (19 567) 878 988 925 724 958 834
Transfers and Subsidies
66 610 873 72 940 925 76 662 661 (5 530 282) (5 446 197) (6 034 321) 60 580 590 67 494 728 70 628 339
Payment for financial assets
0 0 0
Machinery and Equipment
5 275 5 569 5 790 0 0 0 5 275 5 569 5 790
TOTAL
68 087 922 74 501 915 78 281 854 (5 551 670) (5 467 355) (6 053 888) 62 036 252 69 034 560 72 227 966
Direct Charge: Foreign
International fees
Total 68 098 919 74 513 517 78 293 888 (5 551 670) (5 467 355) (6 053 888) 62 047 249 69 046 162 72 240 000
MTEF BASELINE ALLOCATION PER ECONOMIC
CLASSIFICATION continue…
R'000 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Taxi scrapping 230 897 300 063 248 402 359 352 233 542 411 605 414 655 458 559 483 780 501 763
Non Profit Institutions 1 515 2 308 2 415 2 541 2 668 2 823 2 982 3 145 3 318 3437
South African National Taxi Council 17 365 17 500 19 254 20 275 21 289 22 524 23 785 25 093 26 473 27 458
Bursaries to non employees 10 179 7 514 9 808 9 914 9 676 11 040 11 659 12 300 12 977 13 457
International Organisations 7 900 8 783 46 824 12 024 18 634 18 396 19 089 20 140 21 248 22 040
Leave pay and donations 883 691 1 200 1784 4087 198 210 222 234 245
Sub Total 268 739 336 859 327 903 405 890 289 896 466 586 472 380 519 459 548 029 568 400
Total transfers 41 020 379 47 706 799 52 219 379 55 164 927 53 676 534 58 595 954 62 821 105 60 580 590 67 494 728 70 628 339
ROAD TRANSPORT ALLOCATIONS
• The allocation for SANRAL increased due to additional allocations towards moloto road corridor, N2 Wild
coast and repriotisation within departmental baseline.
DETAILS OF SANRAL
SOUTH AFRICAN
AUDITED BUDGET MEDIUM TERM ESTIMATES
NATIONAL ROADS
AGENCY
R'000 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
CURRENT 3,453,733 3,736,149 4,252,623 4,586,160 4,832,471 5,941,876 6,146,338 7,503,949 7,895,884 7,908,240
Gauteng freeway
improvement project 0 0 301,000 425,100 463,359 505,061 550,516 600,063 633,066 664,436
Operational 3,453,733 3,736,149 3,951,623 4,161,060 4,369,112 5,436,815 5,595,822 6,903,886 7,262,818 7,243,804
CAPITAL 7,043,451 8,180,798 8,590,865 9,329,426 11,112,352 9,682,282 15,030,886 14,247,085 13,703,117 13,370,764
Gauteng freeway
improvement project 0 0 0 0 0 0 0 0 0
Non-toll network 6,448,616 7,515,300 7,721,054 7,935,587 9,063,668 7,875,469 12,338,896 12,407,036 11,725,064 11,294,506
96
PUBLIC TRANSPORT ALLOCATIONS PER MODES
Rail Maintenance
operations and inventories 0 0 0 0 0 369,375 811,034 912,900 963,299 1,011,993
CAPITAL 6,831,110 11,058,959 14,155,887 14,608,601 9,368,189 12,653,090 10,209,621 6,382,835 11,927,835 14,116,525
Other Capital programmes 4,851,197 3,906,624 8,234,603 7,206,878 3,446,545 4,382,799 600,022 395,173 1,439,864 1,707,516
Metrorail Refurbishment of
coaches 746,699 547,745 1,267,474 1,283,523 956,556 1,409,445 1,480,054 913,838 1,354,536 1,601,351
Mainline passenger
service: Refurbishment of
coaches 128,034 93,920 217,329 103,750 70,336 160,197 169,168 104,975 155,599 183,949
Rolling stock fleet renewal
programme 0 5,699,959 2,560,508 4,170,266 3,457,222 4,676,870 5,823,266 3,642,696 7,012,147 8,299,844
Signalling 1,105,180 810,711 1,875,973 1,844,184 1,437,530 2,023,779 2,137,111 1,326,153 1,965,689 2,323,865
Total 11,159,113 14,946,301 18,222,047 18,890,267 14,405,960 18,778,968 16,462,213 13,077,119 19,023,983 21,571,550
98
PUBLIC TRANSPORT OPERATIONS
GRANT
99
PUBLIC TRANSPORT NETWORK GRANT
• The allocation for Public Transport Network Grant decreased slightly in 2016/17 ,
2019/20 and 2020/21 financial year due to cabinet baseline reduction.
100
Thank You!
101