WCDMA Site Survey: Security Level
WCDMA Site Survey: Security Level
WCDMA Site Survey: Security Level
Level:
www.huawei.com
Role definition
− Radio network planning manager: is responsible for the overall pla
nning result as a general organizer for network planning.
− Network planning survey personnel: completes field survey includi
ng spectrum test and site survey under the guidance of the radio net
work planning manager, and outputs the Site Survey Report and Spe
ctrum Test Report.
− Engineering survey personnel: cooperates with the network planni
ng survey personnel to complete site survey.
Output search
rings
Perform site
survey
Yes
Output a
survey
report
WCDMA NodeB
Survey Form
GPS can be used only when more than three satellites are
Used to determine the longitude and searched. In addition, the GPS should be located in the
GPS
latitude of the NodeB. place that is open enough. The projection format is set to
WGS84 and the longitude and latitude format to XX.XXXX˚.
Used to determine the antenna Do not near the iron materials (including the antenna bracket
Compass
azimuth. and antenna pole) to ensure the measurement precision.
Portable
Used to record and save the data.
computer
The survey personnel select and survey the preplanned sites one by one. When none o
f the sites meet the requirement, the network planning personnel need to determine alte
rnative sites.
For complicated coverage areas, the actual propagation test is sometimes needed to ch
eck whether the candidate site can meet the coverage requirement.
After confirming an ideal site, you need to communicate with the landlord or the land ow
ner to buy or rent it.
If no alternative site meets the requirement, you need to re-select a NodeB or change t
he coverage requirement till a site selection plan meeting the actual coverage requirem
ent is available.
Roof information
Not constructed sites: On the
roof diagram, mark the installation
position of the antenna and the
basic direction of the cabling rack.
Constructed sites: The
installation position of an antenna
is restricted by many factors. The
spatial position information of the
antenna installation platform and
the antenna and feeder
parameters of the co-site
heterogeneous systems affect the
installation position of the antenna
to a great extent.
Indoor jumper
Filter for
transmitted signals
Feed current of
the tower Antenna
mounted Bypass
amplifier
Clearance
requirements
surrounding the
antenna
You can analyze mutual interference between the GSM BTS and the NodeB
from the following aspects:
Blocking of the GSM BTS on the NodeB
Spurious impact of the GSM BTS on the reception band of the NodeB
Blocking of the NodeB on the GSM BTS
Spurious impact of the NodeB on the GSM reception band
Usually, to meet the isolation requirement for blocking and spurious emission
, antenna isolation is required to exceed 30 dB when the WCDMA, GSM and
DCS share a site.