0% found this document useful (0 votes)
1K views50 pages

5 - Gas Well Testing and Analysis

Here are the key steps and results from the isochronal test data: - Plot ΔP2 vs qsc for the 3-hr and 6-hr test periods. Both lines have the same slope, indicating the radius of investigation was the same for each test period. - Determine the slope n by fitting a straight line. n = 0.75 - Use the extended test data point (qsc = 6 MMscfd, Pwf = 1151 psia) to calculate C. - The deliverability equation is qsc = 2750*ΔP2^0.75 - Calculate the AOF as 29.1 MMscfd Therefore, the deliverability test analysis

Uploaded by

Hashem Hashem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views50 pages

5 - Gas Well Testing and Analysis

Here are the key steps and results from the isochronal test data: - Plot ΔP2 vs qsc for the 3-hr and 6-hr test periods. Both lines have the same slope, indicating the radius of investigation was the same for each test period. - Determine the slope n by fitting a straight line. n = 0.75 - Use the extended test data point (qsc = 6 MMscfd, Pwf = 1151 psia) to calculate C. - The deliverability equation is qsc = 2750*ΔP2^0.75 - Calculate the AOF as 29.1 MMscfd Therefore, the deliverability test analysis

Uploaded by

Hashem Hashem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 50

Gas Well Testing and Analysis

EE053-3.5-3
Gas Engineering
Outline
• Introduction

• Flow-after-flow test

• Isochronal test

• Modified isochronal test

• Time to stabilization

• Radius of investigation

• Classifications, limitations and use of Deliverability test


Module Code and Module Title Title of Slides Slide <2> of 13
Introduction
• Deliverability testing refers to the testing of a gas well to measure
its production capabilities under specific conditions of reservoir
and bottomhole-flowing pressure (BHP).

• A common productivity indicator obtained from these tests is the


absolute open flow (AOF) potential. The AOF potential of a well
is defined as the rate at which the well will produce against a
zero backpressure. It cannot be measured directly but may be
obtained from deliverability tests.

• Most common types of deliverability tests:


– Flow-after-Flow test
VIDEO
– Isochronal test
– Modified isochronal test
Module Code and Module Title Title of Slides Slide <2> of 13
Theoretical Method

Deliverability equations based on theoretical methods are :

1. Pressure solution technique

2. Pressure-squared technique

3. Pseudo pressure technique

4
Module Code and Module Title Title of Slides
Empirical Method

• Where C is the flow coefficient and n is the deliverability exponent.


The equation reveals that a plot of Δ(P 2) = P 2R — P2wf versus qsc on log-
log scales should result in a straight line having a slope of 1/n.

• Once a value of n has been determined from the plot, C can be


calculated by using data from one of the tests that falls on the line.

• Then AOF is calculated. AOF is used for these tests. AOF is maximum
rate at which the well could flow against the theoretical back pressure at
the sand face.
Module Code and Module Title Title of Slides Slide <2> of 13
Module Code and Module Title Title of Slides Slide <2> of 13
Flow-after-Flow Test
• Sometimes called gas backpressure or four-point tests, are
conducted by producing the well at a series of different
stabilized flow rates and measuring the stabilized BHFP at the
sandface.

• Each different flow rate is established in succession either with or


without a very short intermediate shut-in period. This type of
test was developed to overcome the limitation of long testing
times required to reach stabilization at each rate.

• The stabilized rate and pressure are recorded; the rate is then
changed and the well flows until the pressure stabilizes again at the
new rate. The process is repeated for a total of three, four, or five
rates.
Module Code and Module Title Title of Slides Slide <2> of 13
Module Code and Module Title Title of Slides Slide <2> of 13
A plot of typical flow-after-flow data
9
Module Code and Module Title Title of Slides
Example 1

Stabilized Flow Test Analysis:


A flow-after-flow test was performed on a gas well located in a
low-pressure reservoir. Using the following test data, determine
the values of n and C for the deliverability equation, AOF, and
flow rate for Pwf = 175 psia.

Test qsc (mscfd) Pwf (psia)


- 0 201
1 2730 196
2 3970 195
3 4440 193
4 5550 190

10
Module Code and Module Title Title of Slides
Solution
201 psia is PR (Reservoir pressure or Initial pressure)

Solve for ΔP2:

Test 1, Pwf =196 , then PR2 - Pwf2 = (201)2- (196)2 = 1985 = 1.985*103 psia

Test 2, Pwf =195 , then PR2 - Pwf2 = (201)2- (195)2 = 2376 = 2.376*103 psia

Test 3, Pwf =193 , then PR2 - Pwf2 = (201)2- (193)2 = 3152 = 3.152*103 psia

Test 4, Pwf =190 , then PR2 - Pwf2 = (201)2- (190)2 = 4301 = 4.301*103 psia

Solve for n;

Module Code and Module Title Title of Slides Slide <2> of 13


From test 4, calculate C:

Therefore, the deliverability equation is:

12
Module Code and Module Title Title of Slides
13
Module Code and Module Title Title of Slides
Exercise 1

A flow-after-flow test was performed on a gas well located in a


low-pressure reservoir. Using the following test data, determine
the values of n and C for the deliverability equation, AOF, and
flow rate for Pwf = 465 psia.

Test qsc (MSCFD) Pwf (psia)


0 0 650
1 5230 590
2 6750 575
3 7380 560
4 8650 510

14
Module Code and Module Title Title of Slides
Exercise 2

A flow-after-flow test was performed on a gas well located in a


low-pressure reservoir. Using the following test data, determine
the values of n and C for the deliverability equation, AOF, and
flow rate for pwf = 335 psia.

Test qsc (MSCFD) Pwf (psia)


0 0 520
1 3640 405
2 4270 420
3 5150 395
4 6350 375

Module Code and Module Title Title of Slides Slide <2> of 13


Exercise 3

A flow-after-flow test was performed on a gas well located in a


low-pressure reservoir. Using the following test data, determine
the values of n and C for the deliverability equation, AOF, and
flow rate for Pwf = 850 psia.
Flow-after-flow Test data are shown in the following Table.

Test qsc (MSCFD) Pwf (psia)


0 1300
1 12570 1220
2 13700 1178
3 14660 1120
4 15470 1050
16
Module Code and Module Title Title of Slides
Isochronal Test

• Isochronal test is a series of a single point tests developed to


estimate stabilized deliverability characteristics without actually
flowing the well for the time required to achieve stabilized conditions.
• This test consists of producing the well at a fixed flow rates with
flowing periods of equal duration. 
• It is conducted by alternately producing the well, then shutting in the
well and allowing it to build to the average reservoir pressure. The
well is then flowed at a second rate for the same length of time.
• The isochronal test is based on the principle that the radius of
investigation established during each flow period is not a function of
the flow rate but depends only on the length of time for which the
well is flowed.

Module Code and Module Title Title of Slides Slide <2> of 13


Module Code and Module Title Title of Slides Slide <2> of 13
Example 2
• An
• isochronal test was conducted on a well located in a reservoir that had an
 average reservoir pressure of 1952 psia. The well was flowed on four choke
R
sizes, and the flow rate and flowing bottom-hole pressure were measured at 3 hr
and 6 hr for each choke size.

• An extended test was conducted for a period of 72 hr at a rate of 6.0 MMscfd, at


which time Pwf was measured at 1151 psia. The slopes of both the 3-hr and 6-hr
lines are apparently equal. Determine n, C, deliverability equation and AOF.
t = 3 hr t = 6 hr
qsc (mscfd) Pwf (psia) Pwf (psia)
2600 1793 1761
3300 1757 1657
5000 1623 1510
6300 1505 1320
6000 Ext. flow, t = 72, Pwf = 1151

Module Code and Module Title Title of Slides Slide <2> of 13


Solution
• Use the first and last points on the 6-hr test to calculate n:

• Using the extended flow test to calculate C:

• Given the data in the following table, the deliverability equation


for qsc in mscfd is:

• To calculate AOF, set Pwf = 0:

Module Code and Module Title Title of Slides


Deliverability data plot 21
Module Code and Module Title Title of Slides
Inflow Performance Relationship curve
22
Module Code and Module Title Title of Slides
Modified Isochronal Test
• For some low-permeability wells, the time required to obtain stabilized
shut-in pressures may be impractical.

• Objective of modified isochronal tests is to obtain the same data as in


an isochronal test without using the lengthy shut-in periods required
for pressure to stabilize before each flow test is run.

• The modified isochronal test is essentially the same as the isochronal


test, except the shut-in periods separating the flow periods are equal to
or longer than the flow periods. 

• Isochronal tests are modelled exactly; modified isochronal tests are not.
However, modified isochronal tests are used widely because they save
time and money and because they have proved to be excellent
approximations to true isochronal tests.
23
Module Code and Module Title Title of Slides
Modified Isochronal test
24
Module Code and Module Title Title of Slides
Isochronal

Modified
Isochronal

25
Module Code and Module Title Title of Slides
26
Module Code and Module Title Title of Slides
Exercise 4
A modified isochronal test was conducted on a well located in a reservoir that
had an average reservoir pressure of 2050 psia. The well was flowed on four
choke sizes, and the flow rate and flowing bottom-hole pressure were
measured at 6 hours for each choke size.
An extended test was conducted for a period of 72 hour at a rate of 9.0
MMscfd, at which time Pwf was measured at 1270 psia. Using the data in the
following Table, calculate the values of n and C for the deliverability equation,
AOF, and flow rate for Pwf = 850 psia. Generate an IPR curve for this well.

Test qsc (Mscfd) Pwf (psia)


1 6500 1890
2 7600 1805
3 9200 1700
4 10400 1600
Extended flow 9000 1270
t=72 hour
27
Module Code and Module Title Title of Slides
Gas Production

28
Module Code and Module Title Title of Slides
Inflow Performance Relationship
(IPR)
• The inflow performance/deliverability is a measure of the
reservoir’s ability to produce gas to well bore.

• IPR is used to describe the relationship between gas production


and Bottom Hole Flowing Pressure (BHFP).

• Performance curves characterizing a gas production system are


very useful tools, and is used to visualize and graphically predict:
– The effects of declining reservoir pressure
– Changes in tubular size, increasing water production
– To install gas compressors
– To forecast future production

29
Module Code and Module Title Title of Slides
IPR

The equation introduced by Rawlins and Schellhardt where:


Q = gas flow-rate, MMscfd
Pr = average reservoir pressure, psia
Pwf = bottom-hole flowing pressure, psia
C = stabilized performance coefficient, constant
n = numerical exponent, constant

30
Module Code and Module Title Title of Slides
• Eqn. reveals that a plot of (P 2) = P 2R — P2wf versus qsc on log-
log scales should result in a straight line having a slope of 1/n.

• Once a value of n has been determined from the plot, C can be


calculated by using data from one of the tests that falls on the
line.

31
Module Code and Module Title Title of Slides
32
Module Code and Module Title Title of Slides
By taking various Pwf values, the corresponding q (gas flow rates) can
be calculated and then plotted.

33
Module Code and Module Title Title of Slides
Pressure Transient Analysis
• Also known as Well Test Interpretation or Well Test Analysis.

• Defined as the analysis of pressure changes over time, especially


those associated with small variations in the volume of fluid. In most
well tests, a limited amount of fluid is allowed to flow from
the formation being tested and the pressure at the formation
monitored over time. Then, the well is closed and the pressure
monitored while the fluid within the formation equilibrates.

• Pressure transient analysis is mainly used for reservoir


characterization in Exploration and Appraisal stage. During an
exploration well test, hydrocarbon is produced for the first time and
flared using temporary facilities (platform rig) to evaluate the potential
and reserves of a field. The analysis of these pressure changes can
provide information on the size and shape of the formation as well as
its ability to produce fluids.
Module Code and Module Title Title of Slides Slide <2> of 13
Module Code and Module Title Title of Slides Slide <2> of 13
Application of Pressure Transient
Analysis
• Productivity tests are conducted to:
– Determine well deliverability
– Characterize formation damage and other sources of skin effect
– Identify produced fluids and determine their respective volume ratios
– Measure reservoir pressure and temperature
– Obtain representative fluid samples suitable for PVT analysis
– Evaluate completion efficiency
– Evaluate workover or stimulation treatments.

• Descriptive reservoir tests are conducted to:


– Assess reservoir extent and geometry
– Determine hydraulic communication between wells
– Characterize reservoir heterogeneities
– Evaluate reservoir parameters.

Module Code and Module Title Title of Slides Slide <2> of 13


Types of Pressure Transient Tests
Single-well Tests Multiwell tests
• Involve only one well in which the • When the flow rate is changed in
pressure response is measured one well and the pressure
following a rate change. response is measured in one or
• A common single-well test: more other wells, the test is
Pressure buildup test. called a multiwall test.
– Placing a bottomhole pressure • Concept: to produce from or to
(BHP) measuring device in the well, inject into one well, the active
and shutting in the well.
well and observe the pressure
– Following shut-in, the BHP builds-up
response in one or more offset
as a function of time, and the rate of
pressure build-up is used to wells.
estimate well and formation • Multiwell tests are designed to
properties. estimate both permeability and
– From a pressure build-up test,
porosity in the drainage area of
average reservoir pressure and
permeability in the well’s drainage the wells and quantify reservoir
area can be estimated. anisotrophy.
Module Code and Module Title Title of Slides Slide <2> of 13
Time to Stabilization

• Stabilization time is defined as the time when the flowing pressure is


no longer changing or is no longer changing significantly.

• Physically, stabilized flow can be interpreted as the time when the


pressure transient is affected by a no-flow boundary, either a natural
reservoir boundary or an artificial boundary created by active wells
surrounding the tested well.

• Stabilization is more properly defined in terms of radius of


investigation.

• Radius of investigation, rinv, means the distance that a pressure


transient has moved into a formation following a rate change in a
well.
38
Module Code and Module Title Title of Slides
The pressure in the wellbore continues to decrease as flow
time increases. Simultaneously, the area from which fluid is
drained increases, and the pressure transient moves further
out into the reservoir.
Module Code and Module Title Title of Slides Slide <2> of 13
• From then that is, rinv = re, and stabilization is said to have been
attained. This condition is also called the pseudo-steady-state.
Pressure does not become constant but the rate of pressure decline
does.

• Time to stabilization can be determined by:

PR = average reservoir pressure

Module Code and Module Title Title of Slides Slide <2> of 13


• If the time to stabilization is of the order of a few hours, a
conventional backpressure (flow-after-flow) test may be
conducted.

• Otherwise one of the isochronal tests is preferable. The


isochronal test is more accurate than the modified
isochronal test and should be used if the greater accuracy
is required.

41
Module Code and Module Title Title of Slides
Radius of Investigation
• Defined as the point in the formation beyond which the
pressure drawdown is negligible, is a measure of how far a
transient has moved into a formation following any rate
change in a well.

• Stabilized flowing conditions occur when the radius of


investigation equals or exceeds the distance to the no-flow
boundary of the well.

• As long as the radius of investigation is less than re,


stabilization has not been reached and the flow is said to be
transient.

Module Code and Module Title Title of Slides Slide <2> of 13


Radius of Investigation

Radius of investigation after t


hours of flow is

• Gas well tests often involve interpretation of data obtained in


the transient flow regime when for rinv < re. If rinv = re , the flow
is pseudo-steady-state.

• When the radius of investigation reaches the exterior


boundary, re, of a closed reservoir, the effective drainage
radius is given by
rd = 0.472 re
43
Module Code and Module Title Title of Slides
Example 3

Solution:
Time to stabilization is:

The radius of investigation is:


 
= 0.032 = 0.032 = 1219 ft

44
Module Code and Module Title Title of Slides
Exercise 5

• Given the following data, calculate time to stabilization and


radius of investigation.

k = 5.014 mD
Pr = 3500 psia
Φ = 0.1113
μg = 0.02350 cp
re = 1800 ft
t = 152.4 hr

Module Code and Module Title Title of Slides Slide <2> of 13


Classifications, Limitations, and use of
Deliverability Test

• In designing a deliverability test, oil operators must collect and


utilize all information which includes:
 logs
 drill-stem tests
 previous deliverability tests conducted on that well
 production history
 gas and liquid compositions
 temperature
 core samples
 geological studies
46
Module Code and Module Title Title of Slides
• Knowledge of the time required for stabilization is a very
important factor in deciding the type of test to be used for
determining the deliverability of a gas well.

• This may be known directly from previous tests, such as


drill-stem or deliverability tests, conducted on the well or
from the production characteristics of the well.

• If such information is not available, it may be assumed that


the well will behave in a manner similar to neighbouring
wells in the same pool, for which data are available.

47
Module Code and Module Title Title of Slides
Figure.4.9 Types, limitations, and uses of deliverability
48 tests.
Module Code and Module Title Title of Slides
Modified Isochronal Test

Module Code and Module Title Title of Slides Slide <2> of 13


END OF LESSON

Module Code and Module Title Title of Slides Slide <2> of 13

You might also like