Work Breakdown Structure

Uploaded by

Nouman Sabir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 11

Project Management – PMBOK®

Work Breakdown Structure


Ti
tle

(WBS)

Dr Marc Conrad
Office: D104 – Park Square
[email protected]

Marc Conrad
17.04.20 University of Bedfordshire 1
Project Management Processes
(Initiation)
Project Management Plan
Initiation Scope WBS
Project Charter (definition)

ject Scope
Pro
ent
Statem

Cost Time Human Resources


(estimates, …) (activity diagrams, …) (RACI matrix, …)

• Also to consider: Quality, Risk,


Communication, Procurement, Integration
(PMBOK® knowledge areas)
The Work Breakdown Structure in the
PMBOK®

From the file


ITO2008.ppt
The Work Breakdown Structure (WBS)

• Used as a basis for a number of processes in


particular to produce the subsidiary plans of the
Project Management Plan.
WB

• The WBS is a deliverable-oriented hierarchy of


decomposed project components that organises
S

and defines the total scope of the project. The WBS


is a representation of the detailed project scope
statement that specifies the work to be
accomplished by the project.
• The elements comprising the WBS assist the
stakeholders in viewing the end product of the
project.
• The work at the lowest-level WBS component is
estimated, scheduled, and tracked.

Marc Conrad
17.04.20 University of Bedfordshire 4
The Dictionary of the WBS
• A WBS dictionary is a companion document to the
WBS that describes each WBS element. For each WBS
element, the WBS dictionary includes a statement of
work, a list of associated activities, and a list of
WB

milestones.
S

• Other information can include the responsible


organisation, start and end dates, resources required,
an estimate of cost, charge number, contract
information, quality requirements, and technical
references.
• WBS elements should be cross-referenced as
appropriate.

Marc Conrad
17.04.20 University of Bedfordshire 5
• Redecorate Room
 Prepare materials
 Buy paint
 Buy a ladder
 Buy brushes/rollers
Example WBS  Buy wallpaper remover
 Prepare room
WB

 Remove old wallpaper


S

 Remove detachable decorations


 Cover floor with old newspapers
 Cover electrical outlets/switches with tape
 Cover furniture with sheets
 Paint the room
 Clean up the room
 Dispose or store left over paint
 Clean brushes/rollers
 Dispose of old newspapers
 Remove covers
Marc Conrad
17.04.20 University of Bedfordshire 6
Developing the WBS

• Divide the total work of the project into


major groups...
• ...then subdivide these groups into
WB
S

tasks...
• ...then divide these tasks into sub-tasks
• Subtasks should be small enough to
permit adequate control and visibility
• But avoid excess bureaucracy!

Marc Conrad
17.04.20 University of Bedfordshire 7
Product Breakdown Structure
• Redecorated Room
 Removed old wallpaper
 Clean room
 Cover for furniture
 Cover for electrical
PB

switches
S

 Newspapers to cover
• Focus on the product floor.
to be delivered and not  Paint
on the work to do.  Paint on wall
• Underpins PRINCE2®  Leftover paint
“product-based”  Management products
approach.  Ladder
 Brushes and rollers

Marc Conrad
17.04.20 University of Bedfordshire 8
“Scope Breakdown Structure”
(Max Wideman’s approach)
• Geographically discrete components
• Time based phases and stages
• Intermediate or final major deliverables
SB
S

• Discrete structural, process, system or device


components
• Deliverable elements that can be associated
with distinctive types of people-skills or
resources
• After that, break down the work as in the WBS
Recommended
Reading!
http://www.maxwideman.com/musings/wbswar.htm
Marc Conrad
17.04.20 University of Bedfordshire 9
Scope Breakdown Structure
(Max Wideman redecorates a room)
• Redecorated Room
 Painted wall
 Buy paint
 Buy ladder
 Buy brushes or rollers
SB

 Paint room
S

 New curtains
• Note the noun
phrases on the top  …
levels (scope • Content Family
breakdown) and
the activities on
 A clean room
the lower levels!  Cover floor with old newspapers
 Cover electrical outlets/switches with tape
 Cover furniture with sheets
 Dinner in a restaurant
 …
 Decision on colours
Marc Conrad
17.04.20  of…
University Bedfordshire 10
Summary

• The WBS is used to define the


activities that are then further
managed.
Su
mm

• Consider alternatives:
ary

 Work Breakdown Structure


 Product Breakdown Structure
 Scope Breakdown Structure
• Use Common Sense in Breakdown the
Project.

Marc Conrad
17.04.20 University of Bedfordshire 11