Controls & Planning Start-Up Meeting - Aide v0.4

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 45

Start-Up Meeting

<Project No. / Project Name>

CONTROLS & PLANNING


HOUSE KEEPING

In case of an Mobile phones Got a No email


emergency Facilities on silent please question? during
… Please ask! Meeting
AGENDA
 Opening & Introductions
 C&P Process Overview

 C&P Purpose & Objectives


■ C&P Process Requirements
■ C&P Roles & Responsibilities
■ Key Performance Measures
■ C&P Contractual Requirements
■ C&P Reporting / Monthly Timetable
■ Next Steps & Meeting Close
OPENING AND OBJECTIVES

PROJECT /BID MANAGER AND C&P


PROJECT OWNER
OPENING – PROJECT /BID MANAGER
 Controls & Planning Function Importance
 Commitment to C&P Process

 Importance of Program & Time Management

 Add other items


OBJECTIVES OF MEETING - C&P
PROJECT OWNER
 Establish the Controls & Planning Function Framework

 Review & Develop the Controls & Planning


Management Plan
 Lay the foundation for effective;
 Planning
 Program execution
 Project control

 Level 3 Integrated Master Program


 Basis of Schedule

 Support and Training


INTRODUCTIONS AND EXPECTATIONS
CONTROLS & PLANNING OVERVIEW

C&P PROJECT OWNER


CONTROLS & PLANNING OVERVIEW
 C&P Business Standard
 C&P Process Lifecycle
 LCPL Standard Program
Hierarchy
CONTROLS & PLANNING BUSINESS
STANDARDContext and Application
 Minimum requirements for the
successful execution of the C&P
function on LCPL projects.
 Applies to the tendering and
execution of construction projects
undertaken by all LCPL Group
companies
 Including any Alliance, Joint Venture
or other arrangement.
CONTROLS & PLANNING BUSINESS
STANDARD
Content Hierarchy
Sets Minimum Requirements & Key Accountabilities
Minimum
Requirements
1. Organisation

2. Function

3. Business

Key
Accountabilities
Key
Accountabilities
1. C&P Business Owner

2. C&P Leader

3. Group Manager Controls & Planning

4. Project Manager / Bid Manager

5. C&P Project Owner

Minimum 6. Program Owners


Requirements
CONTROLS & PLANNING BUSINESS
STANDARD
Function Requirements
 All tenders and contracts will develop a Controls &
Planning Management Plan (either as a standalone Plan
or a Sub-Plan to the Project Management Plan)

 All tenders and contracts will develop and maintain a


Level 3 Integrated Master Program (L3 IMP). Integrated
Master Program’s are to be cross-functional and inclusive
of the full scope of works. The Integrated Master Program
shall be substantiated by a Basis of Schedule document
that captures the key determinants of the program.

 All tenders and contracts will develop a Level 1 Summary


Schematic Program (SSP) to communicate the overall
project execution strategy as captured in the L3 IMP.
CONTROLS & PLANNING BUSINESS
STANDARD
Minimum Program Requirements
 The L3 IMP will be developed and maintained using Primavera P6**. Summarised
Master Programs (Level 2) will likewise be developed and maintained in that toolset.
 Use of Primavera P6 for the development and maintenance of Level 1, Level 4 and
Level 5 programs is optional. Irrespective of the toolset used, alignment with the
Integrated Master Program shall be maintained at all times.
 Progress and performance against all programs is to be measured against a realistic
and achievable baseline. All performance measures are to be quantifiable, measurable
and assessed against defined performance thresholds.
 In all cases, programs are to be developed and maintained in accordance with the
defined LCPL Program Hierarchy and the associated Our Way process requirements and
are to be cognisant of contractual, legislative and stakeholder requirements
CONTROLS & PLANNING BUSINESS
STANDARD
Key Accountabilities - Projects
Project Manager / Bid Manager:
 Approve the Controls & Planning Management Plan and ensure that it is consistent with the
requirements of the Leighton Management System;
 Approve the program and the supporting Basis of Schedule;
 Monitor and review program performance outcomes and facilitate corrective action where
necessary.
Controls & Planning Project Owner:
 Ensure the requirements of C&P Business standard and the associated Our Way processes
are effectively implemented on our projects.
 Develop and implement the Controls & Planning Management Plan;
 Develop, implement and control a cross functional Integrated Master Program in accordance
with the associated process requirements;
 Monitor and review program performance outcomes and recommend corrective action
where necessary.
Program Owners:
 Develop, implement and control functional Execution Programs in accordance with the
associated process requirements;
 Monitor and review program performance outcomes and take corrective action where
necessary.
Required Required
LCPL PROGRAM HIERARCHY at Tender throughout Delivery

LEVEL 1 Schematic Summary Program (SSP)


LEVEL 2 Summary Reporting Program (SRP)
LEVEL 1 – SCHEMATIC SUMMARY PROGRAM LEVEL 2 –SUMMARY REPORTING
PROGRAM
PROGRAM TYPE: Schematic Program PROGRAM TYPE: Selective Summary Program
REQUIRED: Tender Final Review; At Project Baseline REQUIRED: Tender Final Review; At Project Baseline
Establishment; Updated for Quarterly Contract Review Establishment; Updated Monthly
PROGRAM PURPOSE: Key high level document to PROGRAM PURPOSE: Reporting planned and actual
communicate overall project execution strategy and dates for project at summary level.
critical / near critical paths as captured in the L3 IMP PROGRAM RELATIONSHIP: Dependent on Level 3
PROGRAM RELATIONSHIP: Dependent on Level 3 program
L1 program
RESPONSIBILITY: Planner
RESPONSIBILITY: Planner
FORMAT: Selectively Summarised L3 IMP

&L2 FORMAT: 1 Page, project specific, schematic with


annotations
TYPICALLY DEVELOPED BY: Planner
TYPICALLY DEVELOPED BY: Planner in consultation
with senior project team.

SUMMARY
Integrated Master Program (IMP)

LEVEL 3 – INTEGRATED MASTER PROGRAM


PROGRAM TYPE: Integrated Master Program
REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated for Monthly Contract Review
PROGRAM PURPOSE: Cross functional strategic program to project completion. Demonstrates execution strategies
, key milestones, critical paths(s) and project wide resource requirements.
PROGRAM RELATIONSHIP: Underpins forecast final cost. Sets framework for Level 4 and Level 5

L3
RESPONSIBILITY: Planner
FORMAT: Bar Charts using Primavera P6 and Key Production Measure S-Curves / Histograms generated using
LEVEL 3

Primavera P6 / MS Excel
INTEGRATED TYPICALLY DEVELOPED BY: Planner in consultation with functional leads (e.g. Design, Procurement,
MASTER PROGRAM Construction).

LEVEL 4 – EXECUTION PROGRAMS

PROGRAM TYPE: Functional Execution Program


REQUIRED: Prior to commencement of associated works; Updated Monthly
PROGRAM PURPOSE: Package / Area level planning to support the coordination and delivery of
logistics (e.g. Approvals, design, procurement, materials, labour, etc) to enable field execution of
LEVEL 5 Construction Execution Program (CEP)

construction
LEVEL 4 Construction Execution Program (CEP)

PROGRAM RELATIONSHIP: Planning parameters set by L3 IMP. May incorporate more aggressive
targets.
L4 RESPONSIBILITY: Execution Teams; FORMAT: Primavera P6 / MSP
TYPICALLY DEVELOPED BY: Functional leads (e.g. Design, Procurement, Construction), with
EXECUTION PROGRAMS support from Planner as required.

LEVEL 5 – EXECUTION PROGRAMS


PROGRAM TYPE Functional Execution Program
REQUIRED: Prior to commencement of associated works; Updated Weekly
PROGRAM PURPOSE: Short term planning to enable coordination of construction activities on
site.
PROGRAM RELATIONSHIP: Detailed L5 CEP to achieve L4 CEP targets. Planning parameters

L5
set by L4 Execution Programs.
RESPONSIBILITY: SPE / Project Engineer
FORMAT: 4 Week Look Ahead (MS-Excel)
EXECUTION PROGRAMS TYPICALLY DEVELOPED BY: Project Engineer(s), Site Engineer(s), Design Team Leader(s)
Tender C&P Lifecycle Process Flow Chart Delivery

Capture & Communicate Progress


Governance
Manage & Maintain Program

– 1 Tender Program Peer Review


(TPPR)
Establish – 2 C&P Compliance Review

– 1.1 Context
Plan Tender Program Peer Review Report
– Apply Business Standard
C&P Compliance Review Report
– Define Purpose &
Objectives
– 2.1 Develop Level 3 Master
Program Execute
– 1.2 Framework • Structures
– Define Roles and
Responsibilities
• Assumptions
• Work Calendars – 3.1 Level 3 Master Program
Control
– Define Measures • External Constraints • Measure Progress / Reforecast
• Execution Strategies • Review Basis of Schedule
• Activities & Logic
• Resource Assignments – 4.1 Level 3 Master Program
• Program Optimisation
– 3.2 Level 4 Program • Produce Performance Metrics
• Measure Progress / Reforecast
• Baseline Program • Analyse Performance Metrics
and Trends
– 3.3 Level 5 Program • Address Variances
– 2.2 Develop Level 4 Programs • Measure Progress / Reforecast • Identify Areas for Corrective
– 2.3 Develop Level 5 Programs
Action / Define Responses
- Increase resources
- Modify execution strategies
- Consider Alternatives
• Manage Change
– 4.2 Level 4 & 5 Programs
• Report Plan Percent Complete
• Report Schedule Variance
Updated: • Analyse Plan Complete and
• Integrated Master Program Schedule Variance
• Identify Areas for Corrective
Basis of Schedule • Schematic Summary Program Action / Define Responses
Integrated Master Program • Basis of Schedule
Controls & Planning Schematic Summary Program • Site Execution Programs
Management Plan Progress & Performance Reports
Detailed Site Execution Programs

Schedule Risk Analysis


CONTROLS & PLANNING

PURPOSE AND OBJECTIVES


C&P PURPOSE & OBJECTIVES
 Present Draft Purpose and Objectives for the Controls &
Planning Function (as captured in draft C&P
Management Plan)
List Items as captured in draft C&P Management Plan: e.g.
 Ensure that at all times a realistic & achievable program exists
 Provide early warning of issues allowing for suitable corrective action
 Maintain buy-in from project team for effective operation of C&P
 Provide timely & accurate performance reporting and schedule control
 Ensure project wide resource & program constraints are recognised &
managed.
GROUP SESSION
PURPOSE & OBJECTIVES
 Review & Further Develop
 DraftPurpose and Objectives for
Controls & Planning function.

 Group Working Time = 15


minutes.
 Capture on butchers paper

 Nominate a Spokesperson.

 Report back = 5 minutes per


group.
ALIGNMENT SESSION
PURPOSE & OBJECTIVES
 Finalise & Agree
 Purpose and Objectives for
Controls & Planning function.

 Group Working Time = 10


minutes.
 Step through items and
highlight those for inclusion in
final C&P Management Plan
CONTROLS & PLANNING

PROCESS REQUIREMENTS
C&P PROCESS REQUIREMENTS

Requirements Aim
Protect LCPL’s
Business Standard Interest
Requirements

Project Specific Ensure Project


Requirements Uniqueness Considered

Client Specific Protect Client’s


Requirements Interest
C&P PROCESS REQUIREMENTS
 Draft process requirements for the Controls & Planning
Function (as captured in draft C&P Management Plan)
List Items as captured in draft C&P Management Plan: e.g.




GROUP SESSION
C&P PROCESS REQUIREMENTS
 Review & Further develop draft process requirements.
 What are the requirements that you would like the
Controls & Planning function to undertaken on the project.

 Group Working Time = 20 minutes


 Capture on Butchers paper

 Nominate New Spokesperson

 Report back = 5 minutes per group


ALIGNMENT SESSION
C&P PROCESS REQUIREMENTS
 Finalise & Agree
 Projectprocess requirements
for Controls & Planning
function.

 Group Working Time = 10


minutes.
 Step through items and
highlight those for inclusion
in final C&P Management
Plan
SCHEDULED BREAK
C&P ROLES & RESPONSIBILITIES
 Present draft Roles and Responsibilities for the Controls
& Planning Function (as captured in draft C&P
Management Plan) and overview of scope breakdown
List Items as captured in draft C&P Management Plan:
For Program Development, Execution and Control

Level Type Responsible Accountable Consult Inform


1 Schematic Summary <Enter Details> <Enter Details> <Enter Details> <Enter Details>
Program

2 Summary Reporting <Enter Details> <Enter Details> <Enter Details> <Enter Details>
Program

3 Integrated Master <Enter Details> <Enter Details> <Enter Details> <Enter Details>
Program

4 Construction <Enter Details> <Enter Details> <Enter Details> <Enter Details>


Execution Programs

5 Construction <Enter Details> <Enter Details> <Enter Details> <Enter Details>


Execution Programs
GROUP SESSION
C&P ROLES & RESPONSIBILITIES
 Review & Further Develop
 Draftroles & responsibilities for
Controls & Planning function.

 Group Working Time = 10


minutes.
 Capture on butchers paper

 Nominate a Spokesperson.

 Report back = 5 minutes per


group.
ALIGNMENT SESSION
ROLES & RESPONSIBILITIES
 Finalise & Agree
 Roles& Responsibilities for
Controls & Planning function.

 Group Working Time = 10


minutes.
 Step through items and
highlight those for inclusion in
final C&P Management Plan
CONTROLS & PLANNING

KEY PERFORMANCE MEASURES


KEY PERFORMANCE MEASURES
 Present Draft Key Performance Measures for the Controls & Planning
Function (as captured in draft C&P Management Plan) and overview of scope
and critical work-fronts.
 List Items as captured in draft C&P Management Plan
Key Performance Measure Program Level Unit of Measure
GROUP SESSION
KEY PERFORMANCE MEASURES
■ Review & Further Develop
– Draft Key Performance
Measures for Controls &
Planning function.

■ Group Working Time = 10


minutes.
■ Capture on butchers paper
■ Nominate a Spokesperson.
■ Report back = 5 minutes per
group.
ALIGNMENT SESSION
KEY PERFORMANCE MEASURES
 Finalise & Agree
 KeyPerformance Measures for
Controls & Planning function.

 Group Working Time = 5


minutes.
 Step through items and
highlight those for inclusion in
final C&P Management Plan
CONTROLS & PLANNING

CONTRACTUAL REQUIREMENTS
C&P CONTRACTUAL REQUIREMENTS
 Present Contractual Requirements for the Controls & Planning Function (as
captured in draft C&P Management Plan)
 List Items as captured in draft C&P Management Plan as referenced in
Commercial Risk Assessment (CRA) and/or Project Commercial Roadmap (PCR)

C&P RELATED CRA / PCR ITEMS


CRA /PCR Reference Item CRA /PCR Comment
ALIGNMENT SESSION
CONTRACTUAL REQUIREMENTS
 Confirm Team Alignment,
Understanding & Awareness of
 Contractual requirements for
Controls & Planning function.

 Group Working Time = 5


minutes.
 Note: This is a communication
and clarification session only.
No amendment to contract
conditions is expected.
CONTROLS & PLANNING

REPORTING REQUIREMENTS &


MONTHLY TIMETABLE
C&P REPORTING REQUIREMENTS
 Present reporting Requirements for the Controls & Planning Function (as
captured in draft C&P Management Plan)
 List Items as captured in draft C&P Management Plan
Internal
Report Requirement Program Level & By Whom Issued To
Frequency
i.e. Project, Branch,
Division

External

Report Requirement Program Level & By Whom Issued To


Frequency
i.e. Contract Clause
C&P MONTHLY TIMETABLE
 Insert the C&P monthly timetable
GROUP SESSION
C&P REPORTING & MONTHLY TIMETABLE
■ Review & Further Develop
– Reporting requirements
and/or Monthly Timetable for
Controls & Planning function.

■ Group Working Time = 15


minutes.
■ Capture on butchers paper
■ Nominate a Spokesperson.
■ Report back = 5 minutes per
group.
ALIGNMENT SESSION
C&P REPORTING & MONTHLY
TIMETABLE
 Finalise & Agree
 Reporting requirements and
Monthly Timetable for Controls &
Planning function.

 Group Working Time = 5


minutes.
 Step through items and
highlight those for inclusion in
final C&P Management Plan
CONTROLS & PLANNING START UP

NEXT STEPS
NEXT STEPS
 Complete Actions arising
 Finalise Controls & Planning Management Plan

 Develop Level 3 Integrated Master Program

 Develop Basis of Schedule

 Confirm C&P Training and Support Requirements


 Level 3 Process Training
 Level 4 / 5 Process Training
 Controls & Planning for Managers Course
 P6 Tool Training
ACTIONS ARISING
Item Description / Details Owner Due Date
CLOSE

You might also like