EXCHANGER DESIGN
LUKMAN MARTINUS GUNAWAN GO
02111540000115
PROBLEM
= 40,87 ºC
7. Area
8. %Over Surface
For Fouling For Clean
= 122,3%
= 333,42 m2 = 272,57m2 (over surface 22,3%)
= 659
Design Result
From Table 9.3 For 1-in. OD tubes on 1-1/4-in. Square From Table 9.3 For 1-in. OD tubes on 1-1/4-in.
pitch and From Estimated Ds = 38,47 inch and Nt = triangular pitch and From Estimated Ds = 34,45 inch
659 we can use : and Nt = 756 we can use :
Design : 1 Design : 2
Shell Diameter : 39 Inch = 0,991 m • Shell Diameter : 21¾ Inch = 0,552 m
Number of Tube Passes : 1 ( Max number of tube = 665) • Number of Tube Passes : 1 ( Max number of tube =
766 )
Number of Tube : 659
• Number of Tube : 756
Tube length : 6,2 m • Tube length : 5,4 m
Tube Diameter : OD = 25,4 mm & ID = 17,2 mm • Tube Diameter : OD = 25,4 mm & ID = 17,2 mm
Baffle Spacing : B = 0,5 m & Baffle cut 25% • Baffle Spacing : B = 0,5 m & Baffle cut 25%
Pitch ratio Pτ / do = 1,25 & square pitch • Pitch ratio Pτ / do = 1,25 & triangular pitch
Pτ = 0,02375 m • Pτ = 0,02375 m
Calculation for RATING OF
PRELIMINARY DESIGN
For Shell :
For Tube : 6. Nusselt Number
1. Equivalent Diameter 5. Friction Factor
1. Area of Tube For Turbulent Flow
7. Inner Heat
Transfer Coefficient
3. Reynold Number
3. Mass Velocity 7. Outer Heat Transfer Coefficient
𝑁𝑢. 𝑘
ℎ𝑜 =
𝐷𝑒
4. Reynold Number 4. Friction Factor
Calculation for RATING OF
PRELIMINARY DESIGN
1. Overall Heat Transfer Coefficient for Fouling 5. Length 6. Number Of Baffles
3. %Over Surface
8. Work Pump
Pipe detail
oil Out
Water in
Water Out
( satuan dalam mm )