Boiler Pressure Parts
Boiler Pressure Parts
Boiler Pressure Parts
1. Economiser
2. Bottom Ring Header
3. Water Walls
4. Upriser
5. Drum and internals
6. Super heaters
7. Reheaters
8 February 2020 1
Drum vents RH attemperator Steam from HPT outlet
Economiser To IPT inlet
Steam to HPT inlet
Vent
Drum BOILER – FEED WATER TOSHSTEAM
Uprisers attemperator
1 11 12 13 14 2 7 3L
3R
10
Platen RH FINAL
SH SH
LTSH
D 9
o
w 6
n W W
A A Economiser EH
C O/L
T T EH 4L
o
E E I/L
m 5
e R R 4R
Furnace 8
r
W W To SH / RH
s
A A Attemperation
L L
L L E2 E1 LLCV
Eco
RC FLCV A
Bottom Ring Header
8 February 2020
FLCV B Feed Water
2
from BFP
FEED LIMB
8 February 2020 3
FEED LIMB
Contains two Full Load Control Valves (FLCV) and one Low Load
Control Valve (LLCV).
8 February 2020 4
BOILER LOAD
8 February 2020 5
Full Load Control Valve
8 February 2020 6
Low Load Control Valve
8 February 2020 7
Economiser
Drum
LLCV
E2 E1
FLCV A
Boiler Feed
Pump
FLCV B
Before
After
Swelling
Upto
Here
In
About
case
after,
30%
the
50-60MW
light
ofeffect
Boiler
any
of
FLCV
up,
Boiler
problem
isis
Drum,
will
of
over.
lighted
Load
Unit
feed
Now,
water
inLoad,
(200TPH),
up,
the
FLCV
Regular
wall
swelling
Drum.
LLCV
which
and
LLCV
to
feeding
effect
Economiser
isFLCV
inwill
service,
occurs
through
change
feed are
the
another
inover
LLCV
the
filled
Drum.
drum.
isisup
FLCV
done.
by
back after
Only
initiated.
should feeding
be cuttheusing
in.
completion
Low Pointof Swelling
Drains. effect, regular feeding
through Feed Limb is done.
8 February 2020 8
FEED LIMB CHANGE OVER
8 February 2020 9
Feed Water
8 February 2020 10
FEED LIMB NRV healthy?
8 February 2020 11
Certain Whys?
8 February 2020 13
Drum Level Control
Boiler Feed Pump Scoop and Feed Limb jointly controls the
Drum Level.
The method used in Drum Level Control in a Thermal power
Station is Three Element Control.
8 February 2020 14
P2
P1 52m
BFP
DRUM
P2 = Pressure at Drum.
X = Pressure Loss in pipe line.
(2) Can be rewritten as P1 = P2 + ∆P, where ∆P= Extra pressure+ pressure loss.
BFP
8 February 2020 16
FEED WATER
8 February 2020 17
DRUM LEVEL CONTROL D
Drum Level Differential Differential
R
Pressure ∆P: flow U
6ksc ∆F:15TPH
Normal M
∆F<15TPH Raise Pulse goes to L
Low Scoop and BFP
loaded slightly.
E
High V
E
∆F Feed Limb Discharge Pressure L
increases Opens increases
C
O
∆P normalises ∆P increases N
slightly
∆F>15TPH T
Lower Pulse to BFP unloaded DP
R
Scoop slightly decreases O
8 February 2020
Drum level No flow to L
18
Normalises Drum
ECONOMISER
8 February 2020 19
ECONOMISER
8 February 2020 20
FURTHER DETAILS
8 February 2020 22
ECONOMISER COLD END CORROSION……
8 February 2020 23
ECONOMISER RE CIRCULATION VALVES
8 February 2020 24
ECONOMISER DRAIN
8 February 2020 25
ECO. TO DRUM
8 February 2020 26
VENTS OPERATION
8 February 2020 27
HOT DRAINING
8 February 2020 28
WATER ENTRY TO DRUM
8 February 2020 29
NATURAL CIRCULATION
8 February 2020 30
DRUM SWELLING
8 February 2020 32
DRUM INTERNALS
Primary separator.
Secondary separator.
Wire-mesh separator.
EBD
CBD
Phosphate Dozing.
8 February 2020 33
WET TO DRY SATURATED STEAM
DRUM SEPARATORS
PRIMARY WIRE-MESH
SEPARATOR SEPARATOR.
SECONDARY
SEPARATOR
8 February 2020 34
PRIMARY SEPARATOR
8 February 2020 35
SECONDARY SEPARATOR
8 February 2020 36
WIRE-MESH SEPARATOR.
8 February 2020 37
NUMBERS
WIRE-MESH SEPARATOR 1
8 February 2020 38
PRIMARY,
WET
SECONDARYAND DRY
SATURATED
WIRE MESH SATURATED
STEAM
SEPARATORS STEAM
8 February 2020 39
Moisture separation principle
8 February 2020 40
EBD
Emergency blow-down.
Starts draining Drum if level raises to +150mm.
Stops draining the Drum if Drum level lowers down to -50mm.
Take-off point inside Drum.
No valve at Drum side.
Two electric valves are at 18m level.
Very first valve is of isolation type.
The next valve is of regulation type.
Delivers water to IBD Flash Tank.
EBD delivery is connected to Boiler Drain Header and then goes
to IBD FT.
Normally used only during Drum Swelling periods.
8 February 2020 41
EBD
VENT
DRUM
EBD LINE
IBD FT
8 February 2020
DRAIN 42
CONTINUOUS BLOW DOWN
Done at Drum.
Done continuously to remove Silica.
Silica by itself will be removed where temperature is more than
300C and pressure is within 60 to 160ksc.
These conditions are fairly available in the Drum.
Silica is removed maximum by Temperature and upto some
extent by Tri Sodium Phosphate (TSP) Dozing.
TSP converts silica in water into Silicates (precipitates).
These precipitates are easily disposed off through CBD.
If silica is less (<0.2ppm), then Steam at CBD FT can be
reutilised in FWST.
At Lower Pressure and Temperature, Silica will be more affinitive
to Water and hence water from CBD opening is drained off.
8 February 2020 43
DRUM (inclined 1 to Horizontal)
To FWST
TSP Dozing
CBD FT LCV
8 February 2020 48
Intermittent Phosphate dozing.
WHY?
8 February 2020 49
DRUM
2 Man-holes one at each side.
Drum Gauge glasses ( one at each side).
Hydrasteps (one at each side).
Pressure transmitters.
Temperature transmitters.
Wet saturated steam sampling points( 5numbers)
CBD routine sampling line and stand by sampling line.
3 numbers Drum safety valves( one at one side and two at other
side.
Four numbers feed water incoming lines from Economiser.
Dry saturated steam outlet from Drum to SHH-1
Drum casing thickness is more at upriser end and lower at
other end
8 February 2020 50
Phosphate dozing line
8 February 2020 51
SUPER HEATERS
8 February 2020 52
WHAT FOR?
8 February 2020 54
DRUM SAFETY VALVES
8 February 2020 55
FEED WATER TUBE
THICKNESS 36.4mm.
8 February 2020 56
MAIN STEAM OUTLET PIPES
TWO NUMBERS.
Thickness 49.2mm.
8 February 2020 57
SUPER HEATER SAFETY VALVE
8 February 2020 58
Re heater safety valves
8 February 2020 59
Furnace details
8 February 2020 60
Calorific value & full load coal flow.
TWO NUMBERS
Thickness 32.2mm
8 February 2020 62
COLD RE HEATER PIPE
TWO NUMBERS
Thickness 12.7mm.
8 February 2020 63
DRUM DETAILS
WEIGHT 130 T
8 February 2020 65
MAIN STEAM
Bypass for warming up. MSSVs for regular use & box-up
8 February 2020 66
RE HEATERS
Hot Reheat steam goes to IPT for expansion there at IPT and
LPT.
8 February 2020 67