CASE STUDY 1 - Priyanga M.arch
CASE STUDY 1 - Priyanga M.arch
CASE STUDY 1 - Priyanga M.arch
HOME ARCHITECTS :
CRN
COST- $250-million
30,000 workers
Year of completion - 2011
Function – office
GENERAL INFORMATION
CONTEXTUAL INFORMATION
COST- $250-million for 30,000 workers
Year of completion - 2011
Function – office
CONTEXTUAL INFORMATION
TOTAL BUILT-UP: LAYOUT OF BLOCKS AROUND
CENTRAL SPINE
40,00,000 SQ.FT Each block is like a module,
NO. OF BLOCKS: 12 with two wings branching off a
central service core.
PHASE 1
Engineering blocks 1,2,3
Central spine- gold LEED
PHASE 2
Engineering blocks 4,5,6
Platinum LEED
PHASE 3
Learning Centre
LIBRARY
TRAINING CENTRE
AUDITORIUM
CLUB HOUSE,GYM
GOLF COURSE
THEATRES,AMPHITHEATRES
FOOD COURT
customer care &
The executive offices tower
THE BUTTERFLY CONCEPT
4 entry/exit ways:
- Employees
- Visitors
- Services
WINGS
To reduce the span of purlins a truss system known as middle
wings which are quite similar to the top part of main portals,
are introduced in between the 2 portals
• LATTICE GIRDER & SPINE TAIL
• The steel tubes are roughly 250-
400mm in diameter.
• Overall structural steel
consumption is around 3000 Tons
with a roof sheeting area of around
25,000 square meters.
MATERIAL:
Structural steel confirming to IS: 2062
with minimum yield strength of 310
N/sq.mm is used for all structural
members. For expansion joints approved
Teflon sheet is provided
146 TYPES OF TREES ARE USED IN THE CAMPUS
FACILITIES & SERVICES :
LIBRARY positioned in the
middle of a water body.
5 storied inverted cone Building
MATERIAL:
ALCO PANELS & SOLAR
CONTROL GLASS
TRAINING BUILDING
• CORE`
AUDITORIUM
CORE
1200 seats
TCS SIGNATURE TOWER
A 136m high tower is set to house the customer care block.
The executive offices are located at the higher levels