BIM TO FIM Stanford Health Care
BIM TO FIM Stanford Health Care
BIM TO FIM Stanford Health Care
1
AGENDA
2
WMU FAST FACTS
Established in 1903
25,000 students
1,200 acres
3
WMU FAST FACTS
FM – 500 employees
4
WHY USE BIM FOR
NEW & EXISTING BUILDINGS
Reduce the time and frustration obtaining
critical facility information from files and
spread sheets
5
BIM FOR NEW CONSTRUCTION
6
CAPITAL CONSTRUCTION PROJECTS
Stryker School
of Medicine
$ 68 Million
Dining Facility
$ 36 Million
Western
East Hall
Heights
$ 21 Million
$ 48 Million
Sangren Hall
$ 60 Million
Zhang Legacy
Collections Center
$ 8 Million
7
BIM PLANNING
Setting expectations for all parties on the front end
BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?
8
BIM EXECUTION PLAN
1. BIM Goals and uses
PRIORITY
(HIGH/ MED/ GOAL DESCRIPTION PROJECT PHASE
LOW)
H Provide WMU a LOD 300 model including Arch, MEP, and Structure for construction Construction
H Coordinate all disciplines through the design/construction process to reduce RFI’s Construction
M Reference all building components per the Western Michigan University BIM guideline Lifecycle
H Improve commissioning process by adding equipment information into BIM process Lifecycle
H Improve visualization of design intent using BIM design principles Design
MECHANICAL ANALYSIS
9
BIM EXECUTION PLAN
2. Collaboration Procedures: how often to share? How?
CONSTRUCTABILITY
CONSTRUCTION BI-WEEKLY RESPONSIBLE PARTY WMU
COORDINATION
10
BIM EXECUTION PLAN
3. File naming convention
Building #, Bid, RFP, RFQ 6895 CD, DD, SD, Sheet #, 2009 11 09
Admin, Proposal, 9-45 As built, Rev #, Req # 2008
Concepts, Budget, 8489 Bid set, Reviewed, 2006 10
Landscape, Transmittal, Sheet title, Approved,
Package
Underscore _
Underscore _
Approved as
Underscore _
Underscore _
Maps, Memo,
Master plan, System: title, Noted,
Period .
11
BIM EXECUTION PLAN
4. Technology infrastructure requirements
Project participants must have certain software in order to participate in the BIM
process.
12
BIM EXECUTION PLAN
5. Delivery Strategy & LOD – Level of Development
Architects
Engineers
General Sub-
Contractor contractors
Revit
Model
Interaction with the
Revit model
WMU
Level of Detail
500
Revit Model(s)
14
BIM EXECUTION PLAN
Building information model requirements Lifecycle BIM
WMU_TAG # WMU_TAG #
WMU_TAG #
WMU_TYPE DESC WMU_TYPE DESC
WMU_TYPE DESC
WMU_SUBTYPE DESC WMU_SUBTYPE DESC
WMU_SUBTYPE DESC
Supply fans
DESCRIPTION DESCRIPTION
Return fans
DESCRIPTION WMU_LOCATION
UNITS
WMU_LOCATION WMU_LOCATION
WMU_MANUFACTURER
WMU_MANUFACTURER WMU_MANUFACTURER
WMU_MODEL # WMU_SERIAL #
WMU_MODEL # WMU_MODEL #
WMU_FILTER TYPE WMU_FILTER
WMU_SERIAL # WMU_BELT WMU_SERIAL # WMU_BELT
SIZE WMU_FILTER QUANTITY
NAME WMU_BELT SIZE NAME WMU_BELT SIZE
SEQUENCE OF OPERATION
WMU_BELT QUANTITY FAN WMU_BELT QUANTITY FAN
O&M
CURVE CURVE
SUBMITTAL
WMU_MOTOR ID
WMU_MOTOR ID
WMU_MOTOR DESCRIPTION
WMU_MOTOR DESCRIPTION
WMU_MOTOR RPM
WMU_MOTOR RPM
WMU_MOTOR HP
WMU_MOTOR HP
WMU_MOTOR MODEL #
WMU_MOTOR MODEL #
Motor
WMU_MOTOR SERIAL #
Motor
AIR DISTRIBUTION WMU_MOTOR MANUFACTURER
WMU_MOTOR SERIAL #
WMU_MOTOR MANUFACTURER
WMU_MOTOR AMPERAGE
SYSTEMS WMU_MOTOR VOLTAGE
WMU_MOTOR AMPERAGE
WMU_MOTOR VOLTAGE
WMU_MOTOR FRAME
WMU_MOTOR FRAME
WMU_MOTOR PHASE
WMU_MOTOR PHASE
WMU_MOTOR BEARING/COUPLING
WMU_MOTOR BEARING/COUPLING
SIZE
SIZE
15
TAKEAWAYS
DETERMINE GATEKEEPER
16
BIM FOR EXISTING BUILDING
• Prints to 3D Model
1
• Adding Maintainable
Mechanical Equipment In
2 BIM
About
520 Floor
Plans
Timeframe
2011-2013
Measure
Survey
Review
20
PRINTS TO 3D MODEL
From Simple floor plans to 3D: Revit Modeling
Sprau Tower
Linking each simple floor plan with the
Modeling levels and grids corresponding
Revit 3D Model levels
21
PRINTS TO 3D MODEL
From Simple floor plans to 3D: Revit Modeling
Sprau Tower
TIMELINE: 2011-2013
138 Existing buildings modeled in 3D Revit
• Adding Maintainable
Mechanical Equipment In
2 BIM
MEP
Air Conditioning Unit
Condensing Unit
Air Handler
Air Compressor
Chiller
Centrifugal Pump
Condensate Pump
Cooling Tower
Monthly/yearly
Maintainable Exhaust Fan
Equipment Supply Fan
based on User Sump Pump
Manuals
Return Fan
24
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Types of parameter BIM PARAMETERS
20 parameters
Equipment
Location
26
Tag #
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Creation of the Equipment Library
3D Revit Model 28
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Creation of the Equipment Library
Real Model
29
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Equipment Parameters Schedule
Revit
30
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Plugging equipment in the model
Insert Equipment Model into the Revit Model
31
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Plugging equipment in the model
Insert Equipment Model into the Revit Model
32
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Plugging equipment in the model (Mechanical Room, Schneider Hall)
Before
After
33
ADDING MAINTAINABLE MECHANICAL
EQUIPMENT IN BIM
Summary
TIMELINE: 2014 - 2016
Reality
138 2,694
existing maintainable
buildings equipment
Revit Model
34
CONNECTING THE DOTS FOR
EXISTING BUILDINGS
BIM CMMS
55000
PIECES OF
INFORMATION
36
CONNECTING THE MODEL TO OUR
CMMS-TMA
Connecting to Revit and TMA: the Revit tool
37
CONNECTING THE MODEL TO OUR
CMMS-TMA
Importing from TMA to Revit
The Results
From this… To this
38
TAKEAWAYS
39
BIM IN FIELD
40
41