0% found this document useful (0 votes)
73 views25 pages

Modification of Wirepull Test Module Work Holder For Sot-227 Packages

The document discusses modifying the work holder used for wire pull testing of SOT-227 packages at Team Pacific Corporation. It aims to redesign the existing chuck to better hold the unit firmly before testing. The proposed redesign will use aluminum material and involve clamping the leadframe to reduce human intervention. Test results from previous months are presented and the general and specific objectives, scope, materials, and process flow are outlined.

Uploaded by

Ronald Marticio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views25 pages

Modification of Wirepull Test Module Work Holder For Sot-227 Packages

The document discusses modifying the work holder used for wire pull testing of SOT-227 packages at Team Pacific Corporation. It aims to redesign the existing chuck to better hold the unit firmly before testing. The proposed redesign will use aluminum material and involve clamping the leadframe to reduce human intervention. Test results from previous months are presented and the general and specific objectives, scope, materials, and process flow are outlined.

Uploaded by

Ronald Marticio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 25

TECHNOLOGICAL UNIVERSITY OF THE PHIL.

- TAGUIG CAMPUS
BACHELOR OF ENGINEERING

MODIFICATION OF WIREPULL TEST


MODULE WORK HOLDER FOR
SOT-227 PACKAGES

RESEARCHER: ABEGAIL CUNANAN


TECHNICAL ADVISER: JOSEPH C. ULEP

SUBJECT COORDINATOR: JEFFERSON RUFO


INTRODUCTION

The Team Pacific Corporation is a 100%


Filipino company, an outstanding
organization in product development for
Semiconductor Assembly and test,
recognized by its ability in complex high
power and high-
reliability semiconductor assembly in
both standard and custom build outline
packages for specific solutions.
Section and each Department
Manufacturing Flow for
Plastics Dual In – Line
Products
QUALITY – a measure of excellence
or state of being free from defect

WIRE BONDING
PROCESS

RELIABILTY

WIRE PULL BONDSHEAR


TEST TEST
EQUIPMENT USED IN TEAM PACIFIC CORP.
FOR WIREPULL TESTING

Work Holder Wire pull tester machine


Top View of the Work
Actual Holding of the unit
Holder with a SOT-227
before performing WPT
Package
Wire pull Test Result Monthly

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19

AVERAGE 1.059 1.131 1.282 1.240 1.098 1.211

STDEV 0.122 0.300 0.325 0.191 0.222 0.339

MIN 0.798 0.802 0.854 0.879 0.718 0.698

MAX 1.336 2.783 1.916 1.842 2.090 2.180

CPK 1.80 0.81 0.90 1.47 1.05 0.80


Line Graph representation of cpk in wire pull test

2.00
1.80
1.80
1.60 1.47
1.40
1.20
1.00 0.90
1.05 0.80
0.80
0.81
0.60
0.40
0.20
0.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
CPK
GENERAL OBJECTIVE
The main objective of this study is to modify the existing work
holder by redesigning of the existing chuck to firmly hold the unit
before performing the wire pull test.

SPECIFIC OBJECTIVE OF THE STUDY


1. To design a new work holder that will clench the unit with less human
intervention.
2. To select the proper materials for work holder and to fabricate the
modification made for SOT-227 packages.
3. To test and evaluate the new work holder if it has a positive effect on
the process.
Scope and Limitation

1. This study will focus on the chuck of the work holder in the wire
bonding process only.

2. The study will focus on the SOT- 227 unit packages only.
3. The study will use aluminum material for the work holder.
4. This study is focusing on reliability testing only.
5. This study will not include other packages.
Related Literature

1. A Review on Design and Analysis of Work


Holdings Fixtures
By: Shivaji Mengawade, Vaibhav Bankar, Pratik P Chaphale

2. Workpiece Holder Assembly


By: Jan D. Michael

3. Royce 650 + Royce 620 user Guide Manual


Gannt Chart
START

PROBLEM
IDENTIFICATION

CONCEPTUALIZATION

DESIGN

MATERIAL &
FABRICATION
TESTING AND
EVALUATE

IS IT
PASSED
?

IMPLEMENTATION
MATERIALS NEEDED FOR THE DEVELOPMENT
OF THE PROJECT (FABRICATION)

1. Aluminum block 2. Allen Head Cap screw


CONCEPTUAL DESIGN
Parts of the proposed design of this study

3.Leadframe 4. Clamp

1. Holder 2. Jig
REFERENCES

https://patents.google.com/patent/US4420911
https://patents.google.com/patent/US6406229B1/en

http://oaji.net/articles/2016/786-1461988235.pdf

https://www.mountztorque.com/Understanding-and-Using-

https://patents.google.com/patent/US6202293

You might also like