NTPC, Unchahar Boiler Explosion
By
Satish Chavhan
Submitted to
Prof. Pavan Totla
SEPARATOR
ROOF TUBE
I/L Header
SEPARATOR
FRH
DRAIN TANK SH DIV FSH
Panel
LP-BP
LTSH
LTRH
HP-BP
ECO
VERTICAL WATER WALL
CRP
CONDENSER
BRCP
A B C
CEP
DEAERATOR
GSC
A B
BFBP
A B
MD-BFP
TD-BFP
l
WW LOWER Header HP BFWP
FUEL FEEDING
MASTER FUEL TRIP(MFT)
If any of the predetermined master fuel trip condition occurs a master fuel
trip is initiated. The first out cause of trip indication is displayed and
alarmed. Conditions of a master fuel trip are:
• All FD Fans off
• All ID Fans off
• Boiler air flow low for 3 secs
• Loss of all fuel
• Loss of all flame
• Furnace pressure very high/Low
• Drum level very high/low
• Critical Flameout
• Delayed light-up
• Re-heater protection operated
On 1st November 2017 plant was running at 500MW
Ash evacuation from bottom ash hopper stopped
• Ash level increased in furnace more than 25m