Summer Internship AT North Western Railways
Summer Internship AT North Western Railways
Summer Internship AT North Western Railways
AT
NORTH WESTERN RAILWAYS
3/32
CEMENT CONCRETE APRON:-
4/32
• Reinforcement is provided in top & bottom layers.
5/32
AGGREGATE TESTS:-
1.SIEVE ANALYSIS [Confirming IS: 2386-1 (1963)]
40 mm 0 0 0 100 100
Source:-http://www.iricen.gov.in 7/32
UNIT
Size of Aggregate 20 mm
Weight of Empty Measure 1.519 kg
Weight of Filled Measure 2.151 kg
Weight of Aggregate and Measure (A) 0.632 kg
8/32
Concrete:-
Compressive Strength Test [confirming IS 516 (1959)]
9/32
Concrete:-
Compressive Strength Test [confirming IS 516 (1959)]
Test Result:-
• Slump obtained on the Jaipur
Junction site for the Concrete work
for M30 concrete is 80mm.
• Length =2730 mm
• Spacing=640mm
• Density of sleeper=21
• Adzing 1in 20
12/32
RAIL SECTION:-
• 60 kg/m rail
• Flat Footed Rail
Pandrol Clips:-
• Elastic Fastening
14/32
Rubber Pad:-
• Insulated Liners.
16/32
FISH PLATE:-
• A kind of rail-to-rail
fastenings.
17/32
Plain Concrete Cement (PCC):-
• Slope of 1 in 25 is maintained
• Vary depth from 183mm to 45mm
• Compaction by needle vibrator.
• Curing is done by Ponding
Method.
18/32
BALLAST:-
• Distribute load from sleeper to
formation.
19/32
WELDING OF RAILS:-
Thermit Welding-
• Fusion welding process that makes use of the intense heat.
22/32
23/32
Welding test of column:-
Dye Penetration Test:-
25/32
Finishing of platform:-
1.COPING:-
• It prevents slipping due to grooves.
• Thickness= 25mm
• slope of 1 in 60 is provided.
27/32
Turnout :-
28/32
Points And Crossings:-
• Crossing angle- 6⁰42′35″( 1 in 8.5)
• Rectangular sleepers.
Width=300mm
Height =220mm
• No cant is provided.
Check Rail
29/32
Versine of Railway Track:-
• Y(2R-Y)= L2 /4 .
30/32
ALIGNMENT CHECKING
By level gauge.
31/32
32/32