[MINIMIZATION OF REPAIR RATE

AND REWORKING BY USING LEAN


SIX SIGMA (DMAIC)
METHODOLOGY]

[TOYOTA INDUS
MOTORS COMPANY LTD]
PROJECT TEAM MEMBERS

• Nasrullah khan (D-15-IN-53)


• Faizan Shaikh(D-15-IN-22)
• Ali Riaz (D-15-IN-41)
• Muhammad Ahsan(D-15-IN-03)

INTERNAL SUPERVISOR
• Engr. Rano Khan Wassan (Lecturer at DUET)

EXTERNAL SUPERVISOR
• Engr.Rehan Afzal (Quality Manager at IMC)
TABLE OF CONTENETS

Introduction
INTRODUCTION
About company
 Indus Motor Company Limited (IMC) is a joint venture of House of Habib of
Pakistan, Toyota Motor Corporation and Toyota Tsusho Corporation of Japan.
 The Company manufactures and markets Toyota brand vehicles in Pakistan.
Products
 The main product offerings include several variants of the flagship ‘Corolla’
in the passenger cars category
 ‘Hilux’ in the light commercial vehicles segment
 ‘Fortuner’ in the Sports Utility Vehicle.
Location
 The manufacturing facility and offices are located at a 105 acre site in Port
Qassim, Karachi
 While the product is delivered to end customers nationwide through a
strong network of 45 independent 3S Dealerships spread across the country.
 Lean Six Sigma DMAIC Methodology
DEFINE PHASE
 Problem Statement:
Excessive repair rate and reworking of defects
coming from manufacturing division in a single
vehicle

Impacts:
•Lead time gets affected
•Production target gets hit
•Extra man power consumption
•Customer dissatisfaction in case of outflow
 Project Charter
Project Title Minimization of repair rate by using lean six sigma

Methodology Using DMAIC approach (define, measure, analyze ,improve ,


control )

Business case Repairing of vehicles is a very critical process in Indus motor


company. Higher repair rate increase the cost and decrease
productivity. By decreasing the repair rate of the defects overall
project quality and productivity would be improved.

Goal Minimized the repair rate as much as possible

Project scope Assembly section, welding section, and paint section


department’s head should be involve during different phases of
the project.
 Project Objectives
 Reduce defects

 Reduce man power

 POSSIBLE OUTCOMES

 Decrease repair rate

 Improve productivity
 Scope Of Project

This project is focused on the quality improvement of

 Paint Repair Shop and

 Assembly
 Flow process chart of IMC
 Voice Of Customer
 SIPOC(Supplier Input Process Output Customer)
SUPPLIER INPUT PROCESS OUTPUT CUSTOMER

Engineering Latest drawing/ Vehicle map Detail of vehicle Production


Department specification preparation manufacturing department

Production
Details of vehicle and Preparation of Select production
Engineering Press shop
design requirements assembly parts line and define routing

Press Shop Detail drawing of Select doors of


Body manufactured Weld shop
vehicle body vehicle

Welding Welding of job


All welding Vehicles body
Engineer according to Paint shop
parameters prepared
parameter
Paint
Color material Execution of paint Body painted Assembly shop
Engineering
Assembly Material handling of Fitting assembly in Fitted all parts in
Department Quality control
parts painted body body

Quality Third party


Vehicle requirements Visual testing Verified