Implementation of Value Engineering
Implementation of Value Engineering
Engineering
Submitted by Kashish Jain
Anchal singh
Jatin Tuli
Robin
Ashish
Value Engineering ?
Information
Phase
Presentation Creative
Phase Phase
Development Judgment
Phase Phase
Problems
• Lack of information
• Wrong beliefs, insensitivity to public needs
• Habitual thinking, customs and tradition
• Risk of personal loss
• Negative attitudes
• Poor human relation, Lack of good
communication
Case analysis
In this case discussing about Sumit
Engineering Pvt. Ltd.
Produce wide range of bath fitting products.
All conforming to international standard.
More than 800 products manufactured in this
plant.
Company is ISO 9001:2001 certified for
manufacturing taps
VAM applied to Flush valve. The steps used in
analysis:
• Detailed information about the part is collected
• Functional Definition Worksheet is prepared
• Creative Worksheet is prepared
• Evaluation done through Decision matrix
• Finding and Recommendation
• Result
Finding and recommendation
• We can see that “A” alternative has the higher
score out of all the alternative, means
Alternative A is cost effective with same value.
• Recommended that Flush Valve Sleeve should
be made in the factory ZAMAK.
Performance Cost Value score
Score
Alternatives
A 221.39 25 8.85
B 242.81 45 5.39
C 135.68 55 2.46
Result
Benefits after implementing of value
engineering
Cost Benefits
Cost of Part Before Value RS 55/-
Engineering