With increase in demand of power in India, new power projects are being
constructed with higher capacity and advanced technology for the better
economy and reliability of operation. Compared to other lower capacity
Boilers supplied by BHEL, these 500 MW capacity boiler have
incorporated certain special technical features which are detailed in the
next slides.
Manufactured by - BHEL
1) Fuel Used - Coal/Oil/Gas
LSHS - Carbon - 84.07%, Hydrogen - 11.85%, Nitrogen - 0.16%, Sulpfur - 0.13%, Ash - 0.07%,
Oxygen - 3.72%, HHV(High heating value) - 10808 Kcal/Kg.
Coal - (Fixed carbon) FC-8.36% volatile matter - 31% Moisture - 8%, Ash - 25% Sulfur - 0.7%,
Ash fusion temperature - 1400 o C HHV - 5125 Kcal/Kg. Grindability - 52 HGI. Size or
coal to mill 20mm.
Gas - Natural gas, Sp Gr. - 0.6 at 0 o C HHV 105550 Kcal/NCum (Raw gas) 9433 Kcal/NCum for
methane rich gas supply pressure - 5 Kg/Cm2
3) Superheater -
Type Heating Surface M2
Stage 1 Pendant 3450
LTSH Horizontal 9250
Stage II Pendant Panel 1640
Pendant Platen 1890
Stage III Pendant Finishing 2200
Total 18430
Superheater Desuperheater -
Type - Spray
No. of stages - One
Medium of spray - Water
The arrangement of relief tubes and baffle plates is only on one side of the drum
and this imposes a constraint on uniform heating of drum. Similar arrangement of
relief as in controlled circulation boiler does not exist in natural circulation (NC)
boiler because in that case the relief required to be taken over the drum and fed
from both sides. This shall increase the pressure losses in the riser tubes and also
the hot static head requirement for start up. Since the available head in NC Boiler
is very less; efforts are always made to reduce the pressure loss and improve the
circulation. Second reason is to commence flow in the riser tubes immediately after
light up hot static head is kept as minimum as possible.
In addition to the above the over fire air is provided which is used as combustion
process adjustment technically for keeping the furnace temperature low and thereby
low Nox formation. Each corner of the burner windbox is provided with two numbers of
separate over fire air compartments, kept one above the other and the over fire air is
admitted tangentially into the furnace. The over fire air nozzles has got tilting
arrangement and compartment flow control dampers for working in unison with the
tilting tangential type burner system for effective control of Nox formation.
The primary air system delivers air to the mills for coal drying and
transportation of coal powder to furnace. The 500 MW units have two
stage axial flow primary fans as compared to radial fans in 200 MW
units. By introducing axial flow fans, the system efficiency has gone up
as the axial flow fans consistently high efficiency at all operating loads.
In the 500 MW units bowl mills have been installed. These are
similar to the 200 MW mills except that 500 MW mills have vane
wheel surrounding the bowl and external lubrication unit. Introduction
of vane wheel has led to uniform distribution of primary air within the
mill and less rejects. These mills are also supplied with weld overlay
technology, which has increased the minimum wear life of grinding
parts to 6000 hrs.
Sr.
Specification Parameter
No.
Sr.
Specification Parameter
No.
1 Wall Water Steam cooled
2 Bottom Dry
3 Tube arrangement Membrane
Explosion/Implosion
4 +/- 660
withstand capacity
Residence time for fuel
5 particles in the furnace. 3 second
Sr
Specification Parameter
No
1 Material specification SA-299
2 Design pressure Kg/cm2 (ABS) 204.9
3 Design metal temp OC 366
4 Max operating pressure Kg/cm2 (ABS) 192.4
Max permissible temp differential
5 between any 50
two parts of the drum (oC).
6 Drum wt. with internals (tonnes) 237.00
Connections at both ends to the chemical clean pipe work, and at three points along
its length to feed individual circulation pump suctions. Water will flow from the
pumps through two discharge pipes into the front leg of the water wall inlet headers
at the bottom of the furnace. Each discharge pipe is fitted with circulating pump
discharge stop/check valves, which are controlled via sequence equipment to open
and close as the pump is taken in and out of service. If, however all three pumps
are out of service, all of the valves will open to enable thermosyphonic circulation to
take place. Initiating any pump to restart will cause them all to close again then
continue with the in and out of service regime. Controls for the pumps are located in
the Control room and comprise a SEQUENCE pushbutton, ammeter and a
DUTY/STANDBY selector. Pump status is indicated on RUN/STOP lamps on the
Firemen's Aisle Panel.
The saturated steam/water mixture enters the steam drum on both sides
behind a watertight inner plate baffle which directs the mixture around the
inside surface of the drum to provide uniform heating of the drum shell.
This eliminates thermal stresses from temperature differences through the
thick wall of the drum, between the submerged and unsubmerged portions.
Having travelled around this baffle the mixture enters two rows of steam
enter the outer edge of the separator where it is separated from the steam.
Nearly dried steam leaves the separators and passes through four rows of
corrugated plate baskets where by low velocity surface contact the
remaining moisture is removed.
A power control valve (Electro magnetic relief vlv) on the superheater main steam line
set below the low set
During start up of the unit, if desuperheating is used to match the outlet steam
temperature to the turbine metal temperatures, care must be exercised so as not
to spray down below a minimum of 100 C above the saturation temperature at the
existing operating pressure. Desuperheating spray is not particularly effective at
the low steam flows of start up. Spray water may not be completely evaporated but
be carried through the heat absorbing sections to the turbine where it can be the
source of considerable damage. During start up alternate methods of steam
temperature control should be considered. The location of the desuperheaters
helps to ensure against water carry - over to the turbine. It also eliminates the
necessity for high temperature resisting materials in the desuperheater
construction.
Type : Spray.
Spray water taken from U:5 BFP Header
U6:BFP Kicker stage.
Stage : One (Unit 5)/Two (Unit 6)
Position in steam circuit : Between LT pendants
and SH panels. (inlet to divisional panel)
Specification of material. : SA335 P12
Spray tube material : SA-213 T11
REHEATER ATTEMPERATOR
TYPE : Spray.
Spray water taken from U:5 BFP Header.
U6:BFP 2nd stage.
No. of stages of attemperator : One
Position in the steam circuit : Before RH Radiant wall
Specification of the Material : SA-106 Gr-B
Spray nozzle Material : SA-213T & SS Tips
TROMBAY THERMAL POWER STATION
HP & LP BYPASS SYSTEM
The function of HP bypass is to ensure that the maximum permissible pressure levels
between the turbine and the boiler are not exceeded and that no abrupt pressure surges
occur/develop during variable pressure operation of the unit.
The function of LP bypass is to control the pressure in the reheat system under certain
operating conditions like.
a) Start up & shutdown of turbine.
b) On partial load below the boiler minimum load.
c) In occurrence of fault like load rejection, unit trip out etc.
The HP-LP bypass system permits operators to increase boiler firing rate, boiler
steam flow and thus boiler outlet temperature to a higher level thereby providing more
suitable restart conditions for a hot turbine, within shortest possible time.
It should be noted that high boiler steam temperatures are desired only if the turbine is hot
(say above 400o C). The operation of HP-LP bypass may not be desirable for cold start-
ups.
During the load rejection which may occur due to electrical disturbances, turbine
governing system rapidly closes the steam admission valves. In such event, HP-LP
bypass has a capability of bypassing a large fraction of steam generated in boiler. This
can reduce the impact on boiler and the need to trip the fire.
The application of HP-LP bypass system reduces the solid particle erosion (also called as
silica purging during start up). Also, continuous cooling steam flow through superheater
and reheater tubes reduces the formation of oxide layer on the inner surface of the tubes.
The HP bypass is designed for 60% capacity having maximum steam flow of 270
Kg/second with -
1) upstream steam condition = 164.3 bar, 538 oC
2) downstream steam conditions = 27.3 bar, 337.8 oC
injection water conditions = 188 bar, 245/118 oC (max/min).
LP bypass has capacity corresponding to HP bypass max - steam flow i.e. 384 Kg/s with
1) upstream steam conditions = 41 bar, 538 o C.
2) downstream (before dumping device) steam conditions = 24.6 bar, 538oC
spray water quantity = 15306 Kg/s at CEP discharge pressure.
The H.P. Bypass system in co-ordination with LP-Bypass enables boiler operation and
loading independent of the turbine. This allows quick raising of steam parameters to a level
acceptable to turbine for rolling during start up. Steam is Bypassed from main steam line to
cold reheat line through HP-Bypass and from hot reheat line to condenser through LP
Bypass. The HP Bypass valve can handle a maximum of 60% of the full load turbine steam
flow.
The possible phases of operation of HP Bypass station can broadly be classified as follows:
Boiler start-up with TG set on Barring Gear.
Raising of steam parameters to a level acceptable for T.G. rolling, at a relatively
faster rate than otherwise is possible.
Turbine loading while steam flow gets transferred to the turbine.
Parallel operation with turbine on load rejection.
Allowing boiler operation following turbine trip-out provided boiler load is less than
60 %.
Preventing safety valves opening at raised steam pressures.
Low pressure Bypass system enables to establish an alternative pass for dumping the
steam from reheater outlet directly into condenser at suitable steam parameters. The
controls for LP-BYPASS system are essentially a combination of electrical and hydraulic
system. Electro-hydraulic converter provides the necessary link between hydraulic
actuators and the electrical system. The control of LP Bypass system is hooked up by the
same control which is used for turbine governing system.
The LP Bypass valves are two in number. the LP Bypass stop and control valves are
combined in a common body. The double shut-off arrangement separates the reheater from
the condenser during normal operation. In addition to these, two steam pressure control
valves, four injection water valves are provided for desuperheating purpose. This injection
water is taken from the discharge of the condensate extraction pumps.
The purpose of the condenser temperature protection is to protect the condenser from
excessively high steam inlet temperatures. Thermocouples output temperature signals are
passed to an interlock circuit which locks out the LP turbine Bypass station. Protective Closing
Of Bypass System (Condenser Back-Up Protection)
The LP Bypass valves will close automatically under the following normal conditions to prevent
damage to the condenser.
Motor:
The motor is a squirrel cage, wet stator, induction motor, the stator, wound with a special
watertight insulated cable. The phase joints and lead connections are also moulded in an
insulated material. The motor is joined to the pump casing by a pressure tight flange joint and
a motor cover completes the pressure tight shell. The motor shell contains all the moving
parts, except for the impeller. Below the impeller is situated an integral heat baffle which
reduces the heat flow, a combination of convection and conduction, down the unit. A baffle
wear ring-cum sleeve above the baffle forms a labyrinth with the underside of the impeller to
limit sediment penetration into the motor. Should foreign matter manage to pass the labyrinth
device into the motor enclosure, a filter located at the base of the cover end bearing housing
strains it out.
BEARINGS
The motor rotor shaft is supported by water lubricated tilting pad type radial and thrust
bearings mounted on the stator shell, thus making the motor internals into a separated
construction independent of the motor pressure vessel.
INTER FILTER
A stainless steel woven wire strainer, fitted at the base of the reverse thrust plate, filters the
liquid in the motor before it is circulated through the bearings after passing through the heat
exchanger (cooler). The filter should be cleaned at normal maintenance periods, removing
any accumulation of foreign matter in the motor cover.
A heat exchanger (cooler) is fitted to dissipate the heat generated by the motor
winding. Brackets are provided on the motor case to mount the heat exchanger.
High-pressure outlet and inlet-raised facings are situated bottom and top of the
motor case respectively for connection to high-pressure heat exchanger/motor
case stub pipes. Inter - connecting pipe work is short and direct with the heat
exchanger mounted as high as possible to promote good thermo syphonic
circulation when the unit is on hot standby.
V1
Normal ACW pumps disch.
Pr. Sw.
V3 SGWCP
Raw Water HEAT
EXCHANGER
V5
Emergency supply from
ACW overhead tank Maint. Door
V2
Normal return line
to ACW system
V4
To waste
Axial Fans
Control Dampers
Impeller
Rotor
Bearings
Casing
ESP
FD
PA 5A A FAN
B PA 5B
RAPH-5A RAPH-5B
GR 5A GR 5B
TROMBAY THERMAL POWER STATION
RAPH
SD-6
FROM GRF - B
-10 mm
• FURNACE
FROM GRF - A
SD-5
S SD R
SD-1
C
7.1 A SD
A P 9.1
P 7.2 H 9.2
AIR FROM ATMOS
H A
FD A A 35 DEG C 350 DEG
IGNITOR AIR
FAN
Stack
GD 30.1 30.2 GD
GD 5.1 5.2
28.1
28.2
9
13A
R 5C 13B 17 ID C 25
A 21
P GD 31.1 31.2
GD
H GD-
4.1 14A
5D ID D
B 4.2 14B
GD- GD-10 GD-18 GD-26
GD-22
Filter A
FS
Cooler A
Cooler B
Filter B
OF1
AA
Scanners Ignitors
A
AB
BC
CD
DE
EF
FG
GH
HH
Filter A
FS
Cooler A
Cooler B
Filter B
Filter A
Cooler A
Cooler B
Filter B
To Igniters Windbox
Auto changeover
Damper
To Scanners To Scanners
Auto changeover
Damper
SD-6
FROM GRF - B
-10 mm
• FURNACE
FROM GRF - A
SD-5
S SD R
SD-1
C
7.1 A SD
A P 9.1
P 7.2 H 9.2
AIR FROM ATMOS
H A
FD A A 35 DEG C 350 DEG
IGNITOR AIR
FAN
•
TROMBAY THERMAL POWER STATION
TROMBAY THERMAL POWER STATION
BOILER FUEL SYSTEM
2 3
1 4
4
4
LC trip
Valve LC Oil
Control
V/V
TROMBAY THERMAL POWER STATION
TROMBAY THERMAL POWER STATION
TROMBAY THERMAL POWER STATION
TROMBAY THERMAL POWER STATION
Coal Mills
•
TROMBAY THERMAL POWER STATION
Coal Mills and Coal Feeders
•
TROMBAY THERMAL POWER STATION
LUBRICATION SYSTEM OF COAL
MILL
•
TROMBAY THERMAL POWER STATION
TROMBAY THERMAL POWER STATION
SEAL AIR SYSTEM
•
TROMBAY THERMAL POWER STATION
BOILER LIGHT UP