Operations Jotun

The document summarizes a proposal to modify piping lines at Jotun Abu Dhabi's Devree facility to reduce composite hose changeover times between tanks. The current process involves a 6 minute changeover time. The proposal aims to install new pipelines through existing tanks to eliminate 65% of changeover time and reduce it to 2 minutes. This would improve efficiency and safety by reducing physical and chemical hazards during changeovers. An action plan is outlined to implement the modifications by specific targets dates and assign responsibilities to relevant parties.

Uploaded by

tanuj rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
203 views13 pages

Operations Jotun

The document summarizes a proposal to modify piping lines at Jotun Abu Dhabi's Devree facility to reduce composite hose changeover times between tanks. The current process involves a 6 minute changeover time. The proposal aims to install new pipelines through existing tanks to eliminate 65% of changeover time and reduce it to 2 minutes. This would improve efficiency and safety by reducing physical and chemical hazards during changeovers. An action plan is outlined to implement the modifications by specific targets dates and assign responsibilities to relevant parties.

Uploaded by

tanuj rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Jotun Abu Dhabi-Maintenance

Devree Pipeline Modification


(2019)

Tanuj Rana/Devree piping line modification/ 22-07-19


Teams : Ramesh/Raghunathan/Aji John
Jotun Abu Dhabi-Maintenance Date : April 21st, 2016
Business case Future state / To-be Details set up (next slide)
-To reduce and eliminate composite hose changeover time between tanks 204,214,215,247
and 248 by approximately 65%.
-To improve the changeover efficiency within the budget through pro active changes,ensuring
compliance with HSEQ policy reducing physical and chemical hazards.
-To regulate and improve the 5S standards being followed.

Current situation / As-is Details set up (next slide)

Actions / Road-Map
60% done
40% on-going

Measures / Follow up

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Business Case and Objective

- To eliminate composite hose changeover time between tanks


204,214,215,247 and 248 by approximately 65%.
- To improve the changeover efficiency within the budget through pro
active changes,ensuring compliance with HSEQ policy reducing
physical and chemical hazards.
- To reduce change over time from 6 minutes to 2 minutes.

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Current Scenario

40
300300 cans
cans minutes/
batch
Batch
Time
size

11 batches Amount Ratio 14


cans/min

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Transport

FGWH
Process Hose
Changeover/PLC
Flow

Filling,
Crimping

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Time Segmentation

Raw material transportation - 10 minutes


16% 14%

8% Changeover time - 6 minutes

Filling in Devree - 45 minutes

Crimping and transfer to FGWH- 15 minutes


62%

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Material
Machine
Heavy Poor Quality
Composite hose

Paint Leakage Poor packaging

Pump inefficiency
Leaked PM
overflow
Change
over Time
Unskilled
Order Pattern
Improper Planning
Plan Change

Manual changing Lack Of Team Work

Not following WI
Method Does not comply
with HSEQ
Man

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

P-001
A-001 V-001

ES-001

A-002 P-002
V-002

A-006

SS- 001 SS-002 PV- 001

A-007
LEGENDS
6 way selector
switch
P-003
A-003
OR Gate

V-003
AND Gate
A-004 P-004

V-004 Pilot Valve

P-005
A-005 Emergency
Stop

V-005 5/2 valve

5/3 valve

Designed by:
Jotun Abu Dhabi LLC Tanuj Rana j
Logic Diagram (Devree Pipeline Modification)

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance
P&I Drawing

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Desired Action Plan

Sr Action Plan Target Responsible


1 New pipelines to be installed through dummy line and 30/8/2019 Prashanth
through tanks 214,215
2 Analyse the site conditions further and propose the 30/8/2019 Prashanth
need of additional valves and pump

3 Evaluate and discuss cost of the aforementioned with 30/8/2019 Prashanth


Purchase Department and confirm the suppliers and
contractors are competent and reasonable.
4 Train operators to handle the selector switches 30/8/2019 Prashanth

5 Train technicians to handle technical scenarios and 30/8/2019 Prashanth


issues that may arise.

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Future Status

Changeover Time
7

0
batch 1 batch 2 batch 3 batch 4 batch 5 batch 6 batch 7 batch 8 batch 9 batch 10 batch 11 batch 12
possible
Column1 Series 2

Tanuj Rana/Devree piping line modification/ 22-07-19


Jotun Abu Dhabi-Maintenance

Conclusion

- Number of batches made in a day on average = 11.


- Current changeover time from one tank to another = 6 minutes.
- Average time taken to prepare a batch = 45 minutes
- Total Time saved in a day = 11 x 4= 44 minutes.

- The time we save through the proposed system will help us prepare an
additional batch everyday with cleaning to spare, furthermore HSEQ and 5S
regulations will be kept in check removing the danger of physical and
chemical hazards!

Tanuj Rana/Devree piping line modification/ 22-07-19


13
Jotun Abu Dhabi-Maintenance

Tanuj Rana/Devree piping line modification/ 22-07-19

You might also like