Presentation Bharat Mala 10.05.2018
Presentation Bharat Mala 10.05.2018
Presentation Bharat Mala 10.05.2018
1
SCOPE OF WORK
Design
Length
S. End Point length
Classification Name of corridor Road Start Point (Coordinates) (km) as
No. (Coordinates) (Km)
per TOR
UP MDR 127W
Inter Kiraoli (27.1353747, Kagarol (27.025134,
1 Jaipur - Agra (branch of 15.01 15.383
Corridor 77.7784915) 77.8496216)
Jaipur-Agra)
Mahaur
Economic Fatehpur Sikri Agra (27.1767565,
2 Jaipur - Agra (27.143735, 18 17.201
Corridor Road 78.0075415)
77.830316)
Rajapur
Raipura (25.2317904,
3 Feeder route Raipura - Kalwari Unnamed road (25.3838783, 17.78 19.276
81.1239596)
81.1470652)
Barabanki
Rupaidiha (28.018858,
5 International connectivity NH 927 (26.929844, 145 151.198
81.60033)
81.221796)
Gorakhpur
Sonauli (27.475099,
6 International connectivity UP SH 1 (26.760571, 97 94.595
83.46913)
83.37313)
Total 332.79 342.57
2
PROGRESS OF WORK
3
S. MISC. Works Status
No. Completed
4 Topographic survey Completed for 6 nos. project corridors
using LiDAR (length -332.79 km).
3 no. road i.e., Muzzafarnagar-Nangal,
Rajapur-Makhadampurkaji & Nangal-
Gagalheri (length -98.57 km) deleted from
scope of the agreement due to these roads
taken up under other schemes.
5 Traffic Surveys Completed for all the 6 roads
6 Pavement Completed for all the 6 roads
condition surveys
including FWD test
4
S.No. MISC. Works Completed Status
7 Subgrade material /quarry Completed for all the 6 roads
materials testing
5
S. No. MISC. Works Completed Status
10 Pavement Design(overlay Completed for all 6 roads.
, new construction & rigid
pavement)
6
Summary of Normal Traffic Projections (Pcu)
Raipura to Rajapur
Muzaffarnagar to
Agra - Mahuwar
Sonauli - Gorakhpur
Kiraoli - Kagarol
Rupaidiha - Bahraich - Barabanki
Shamli
Year
Km Km Km
Km 70+000 Km 120+000 Km 65+000
30+000 145+000 25+000
2017
8730 22424 2390 24127 11714 10634 10927 7225 19905 15519
(Base)
2022 12120 30947 3190 33474 16331 14909 15273 9974 28251 21412
2023 12921 32959 3378 35677 17426 15924 16300 10625 30238 22803
2024 13779 35110 3578 38032 18598 17012 17399 11323 32371 24289
2025 14696 37409 3793 40547 19853 18178 18574 12070 34660 25877
2026 15678 39867 4022 43235 21197 19427 19830 12869 37117 27575
2031 20843 52961 5232 57295 28366 26091 26447 17155 50233 36564
2036 27430 69687 6768 75173 37567 34641 34878 22637 67076 48018
2041 35251 89604 8584 96617 48528 44737 44907 29066 86777 61649
2046 45004 114391 10830 123636 62223 57241 57414 36968 111003 78643
2051 57505 146142 13692 158300 79842 73289 73437 47072 142070 100400
SCHEDULE OF SUBMISSIONS
Time Period
in days from
Stage
Activity date of Target date set by Consultant
No.
commenceme
nt
by 10th day
1 Monthly Reports of every Being submitted regularly
month
Inception Report Draft Inception and Final Inception Report
2 (i) Draft Inception Report including QAP document 21 Submitted to NHAI on 24-04-2017 and 17-
(ii) Inception Report including QAP document 30 06-2017 respectively
10
Alignment with final option
11
12
13
PROJECT SALIENT FEATURES
ROB NIL
At design Ch. 0+550
Level Crossing & TVU at Km 0+600; TVU : 152760 (29.09.2014)
14
The position of existing alignment with respect to requirement of forest clearances is as under:-
Forest Clearance
Not
Jaipur-Agra Kiraoli Kagarol 15.197 Not required Required Not required
required
Start Point:- Km 0/0 of project corridor is at junction of Agra - Jaipur NH-11 (21)
and Kiraoli- Kagarol MDR 127W road.
End Point:- Km 15/197 of project corridor is at junction of Agra – Jagner SH-39 and
Kiroali – Kagarol MDR 127W raod.
15
Requirement Of Bypasses
0+000(km
20+700 of NH-
Kiraoli - Kagarol Kiraoli Town 1+910 2.000
11)
(Design Ch.)
(Design Ch.)
Note: PD NHAI Agra during his site visit on 23.01.18, was of opinion that there is no
need of Public Consultation Meeting with DM Agra.
16
Agra to Mahuar
(length -18km)
17
Note- Alignment of existing road followed
18
19
20
PROJECT SALIENT FEATURES
FEATURES EXISTING PROPOSED
17.200 (km 0/0 is at
junction of NH-11(21) and
MG road near collectorate
Project length (Km) 18 Agra)
NH/SH/MDR/Feeder NH11 (21) NH11 (21)
Agra, Pathauli, Saraye, Agra, Pathauli, Saraye,
Habitations Midhakur Midhakur
17.200 km ( 4 lanned
Two Lane Road (km) 18 road)
Existing ROW (m) 17.5-30.5 60
2 Nos. 2 Nos.
Forest Clearance
Permissi
Name of Environme Wildlife Forest
Length on for
the From To nt Clearan Diversio
(km) tree
corridor Clearance ce n
cutting
Notified
protected
Jaipur- Mahua Not Not
Agra 18 Required forest
Agra r required required
along the
road side
Start Point :- Km 0/0 is at junction of Agra - Jaipur NH-11(21) and MG road near
collectorate Agra.
End Point :- At Ch. 17+200 joining existing 4 lane road Agra - jaipur (NH-11).
22
Raipura - Rajapur
23
ALIGNMENT PLAN
24
25
PROJECT SALIENT FEATURES
NH – 731AG
NH/SH/MDR/Feeder Unnamed
45m
Existing ROW (m) 7.5-16
1 Minor Bridge
Minor Bridge 1 at Km 11+830 (4x6.8)
26
The position of existing alignment with respect to requirement of forest clearances is as under:-
Forest Clearance
Name of From To Lengt Environm Wildlife Permissio Forest
the h ent Clearan n for tree Diversion
corridor (km) Clearance ce cutting
Notified
protected
Raipura Raipur Not Not
Rajapur 17.78 Required forest
-Rajapur a required required
along the
road side
27
Requirement Of Bypasses
15+300 19+275
Raipura - Rajapur Rajapur Town 3.975
(Design Ch.) (Design
Ch.)
28
MUZZAFARNAGAR
TO SHAMLI
29
ALIGNMENT PLAN
30
31
PROPOSED SHAMLI BYPASS BY STUP CONSULTANT
KM 37+620
32
PROJECT SALIENT FEATURES
Forest Clearance
Name From To Length Environm Wildlife Permissio Forest
of the (km) ent Clearan n for tree Diversion
corrido Clearance ce cutting
r
Notified
MUZZA
Muzzaf protected
FARNA Not Not
arnaga Shamli 40 Required forest
GAR TO required required
r along the
SHAMLI
road side
34
RUPAIDIHA TO BARABANKI
35
36
37
38
39
PROJECT SALIENT FEATURES
68
Bus bays 44
12
Truck lay bye 6
41
The position of existing alignment with respect to requirement of forest
clearances is as under:
Forest Clearance
Notified
protected
International Rupaidih Not
Barabanki 145 Not required Required forest along
Connectivity a required
the road
side
42
Requirement of Bypasses
Babaganj
Km 10+200 4.300
Km 5+900
Rupaidiha-Barabanki
Keserganj
Km 97+600 6.100
Km 91+500
44
45
46
47
PROJECT SALIENT FEATURES
Bus bays 21 32
Truck lay bye 4 6
48
The position of existing alignment with respect to requirement of forest clearances is
as under:-
Forest Clearance
Name of Wildlife Permissio
Length Environmen Forest
the From To Clearanc n for tree
(km) t Clearance Diversion
corridor e cutting
Reserved
forest (km
61.700 to
Internation km 67.170)
al Gorakhp Not and
Sonauli 97 Not required Required
Connectivit ur required notified
y protected
forest along
the road
side
49
Requirement Of Bypasses
22+450 28+400
Kolhui Bazar 5.950
(Design Ch.) (Design
Ch.)
Sonauli- Gorakhpur
50