NHAI

DPR Preparation For Project


Corridors –Lot-2/UP/PKG-1
Status Of Progress
Meeting dated 09.05.2018
M/S Theme Engineering Services Pvt.
Ltd

1
SCOPE OF WORK

Design
Length
S. End Point length
Classification Name of corridor Road Start Point (Coordinates) (km) as
No. (Coordinates) (Km)
per TOR

UP MDR 127W
Inter Kiraoli (27.1353747, Kagarol (27.025134,
1 Jaipur - Agra (branch of 15.01 15.383
Corridor 77.7784915) 77.8496216)
Jaipur-Agra)

Mahaur
Economic Fatehpur Sikri Agra (27.1767565,
2 Jaipur - Agra (27.143735, 18 17.201
Corridor Road 78.0075415)
77.830316)

Rajapur
Raipura (25.2317904,
3 Feeder route Raipura - Kalwari Unnamed road (25.3838783, 17.78 19.276
81.1239596)
81.1470652)

Karnal - Meerut : Shamli


Muzzafarnagar
4 Feeder route Branch to UP SH 12 (29.4468364, 40 44.917
(29.431141, 77.699714)
Muzzafarnagar 77.3025292)

Barabanki
Rupaidiha (28.018858,
5 International connectivity NH 927 (26.929844, 145 151.198
81.60033)
81.221796)
Gorakhpur
Sonauli (27.475099,
6 International connectivity UP SH 1 (26.760571, 97 94.595
83.46913)
83.37313)
Total 332.79 342.57
2
PROGRESS OF WORK

S.No. Description Status

1 Date of commencement of 18/4/2017 (Letter of commencement of


services services issued by GM (tech.)
Bharatmala vide letter no. 97793 dated
3/4/2017

2 Completion of stage –1 Submitted to NHAI vide TES Letter no.


Inception report & QAP Theme/Bharatmala/UP/DPR/2017-
18/609 dated 17/6/2017 ( Draft
Inception Report on 24-04-2017 )
3 Completion of stage –2 Draft Feasibility Report submitted to
Feasibility Report NHAI vide TES Letter no. 2208 dated
21/12/2017.
Final Fusibility Study Report for
Muzzafarnagar- Shamli submitted to
NHAI on 16-04-2018.

3
S. MISC. Works Status
No. Completed
4 Topographic survey Completed for 6 nos. project corridors
using LiDAR (length -332.79 km).
3 no. road i.e., Muzzafarnagar-Nangal,
Rajapur-Makhadampurkaji & Nangal-
Gagalheri (length -98.57 km) deleted from
scope of the agreement due to these roads
taken up under other schemes.
5 Traffic Surveys Completed for all the 6 roads
6 Pavement Completed for all the 6 roads
condition surveys
including FWD test

4
S.No. MISC. Works Completed Status
7 Subgrade material /quarry Completed for all the 6 roads
materials testing

8 Geotech investigations for Completed for all 6 roads


structures

9 Finalization of Alignments of Completed for all roads. Public


project corridors consultation meeting with District
Administration Bahraich, Shamli,
Chitrakoot held and for district
Maharajganj, Agra yet to be held.

5
S. No. MISC. Works Completed Status
10 Pavement Design(overlay Completed for all 6 roads.
, new construction & rigid
pavement)

11 Nomination of CALA by DM Agra,


DM Muzzafarnagar,Shamli,Bahraich,
Barabanki, Chitrakoot, Maharajganj &
Gorakhpur has nominated their officials
for appointment of CALA

12 Appointment of CALA by PD NHAI Kanpur (Nodal Officer) has


NHAI through Gazette been requested to refer matter to NHAI
Notification HQ vide TES Letter No.3112 dt. 23.03.18,
49 dt.06.04.18 & 212 dt.24.04.18.

6
Summary of Normal Traffic Projections (Pcu)

Raipura to Rajapur

Muzaffarnagar to
Agra - Mahuwar
Sonauli - Gorakhpur

Kiraoli - Kagarol
Rupaidiha - Bahraich - Barabanki

Shamli
Year
Km Km Km
Km 70+000 Km 120+000 Km 65+000
30+000 145+000 25+000

2017
8730 22424 2390 24127 11714 10634 10927 7225 19905 15519
(Base)

2022 12120 30947 3190 33474 16331 14909 15273 9974 28251 21412

2023 12921 32959 3378 35677 17426 15924 16300 10625 30238 22803

2024 13779 35110 3578 38032 18598 17012 17399 11323 32371 24289

2025 14696 37409 3793 40547 19853 18178 18574 12070 34660 25877

2026 15678 39867 4022 43235 21197 19427 19830 12869 37117 27575

2031 20843 52961 5232 57295 28366 26091 26447 17155 50233 36564

2036 27430 69687 6768 75173 37567 34641 34878 22637 67076 48018

2041 35251 89604 8584 96617 48528 44737 44907 29066 86777 61649

2046 45004 114391 10830 123636 62223 57241 57414 36968 111003 78643

2051 57505 146142 13692 158300 79842 73289 73437 47072 142070 100400
SCHEDULE OF SUBMISSIONS
Time Period
in days from
Stage
Activity date of Target date set by Consultant
No.
commenceme
nt
by 10th day
1 Monthly Reports of every Being submitted regularly
month
Inception Report Draft Inception and Final Inception Report
2 (i) Draft Inception Report including QAP document 21 Submitted to NHAI on 24-04-2017 and 17-
(ii) Inception Report including QAP document 30 06-2017 respectively

Draft Feasibility Report submitted to NHAI


F.S. REPORT vide TES letter no. 2208 Dt. 21.12.2017
i) Draft Feasibility Study Draft 3a publication report submitted to
90
3 Report including option study report including draft NHAI vide TES letter no.2210 Dt. 22.12.2017
105
3(a) report ii) Comments of client Final Feasibility Report of Muzzafarnagar –
120
iii) Final Feasibility Study Report incorporating compliance of comments of Client Shamli road submitted to NHAI on 16-04-
2018.

Draft 3A publication report for


LA & Clearances I Report
135 Muzzafarnagar – Shamli submitted to NHAI
4 i) Draft LA & Clearances I Report including draft 3(A) report ii) Comments of client
150 on 7-03-2018 and for remaining roads it is in
iii) Final LA & Clearances I Report incorporating compliance of comments of Client
165 progress.
210
Detailed Project Report i) Draft DPR ii) Comments of client
5 240
iii) Final DPR incorporating compliance of comments of Client
270
180
Technical Schedules
6 195
i)Draft Technical Schedules ii)Comments of client iii) Final technical schedule
210
7 Submission of draft 3D publication report 210
Clearances II Report
8 Approval of Project clearances from concerned agencies e.g. from MOEF; Rly for 330
approval of GAD and detail engineering drawing of ROB/RUB; Irrigation Dept.,
8
Time lines for completion of DPR
Sr.
Activity Target date Remark
No.
Date of
1 18.04.2017/14.03.2018 330 days
commencement/Completion
Draft Inception Report submitted on
Submitted to NHAI vide TES letter no. 609 dated
2 Inception Report 24.04.2017. Comments of NHAI received
17.06.2017
on 13.06.2017
Draft Feasibility Report submitted to NHAI vide TES
letter no. 2208 Dt. 21.12.2017 DFR was to be submitted in 90 days and
3 Draft Feasibility Report
Draft 3a publication report submitted to NHAI vide Feasibility Report in 120 days
TES letter no.2210 Dt. 22.12.2017

Public consultation meeting for bypasses


Final Feasibility Report of Muzzafarnagar – Shamli on Rupaidiha-Barabanki road with district
road submitted to NHAI on 16-04-2018. administration held on 30.01.2018 and
minutes received on 20.02.2018. Meeting
4 Final Feasibility Report
Rupaidiha – Barabanki road (150 km length) – with DM Shamli held on 30-2-2018 and
20.05.2018 with DM Chitrakoot on 17-3-2018.
For remaining roads – 20.06.2018 For remaining roads public consultation
meetings are yet to be held .

Draft 3A publication report for


5 3A Draft Report 20.06.2018 Muzzafarnagar – Shamli submitted to NHAI
on 7-03-2018
Draft DPR and technical
6 20.07.2018
schedule
7 3D Draft Report 20.07.2018
Application to be initiated after submission of 3A
8 Forest clearance
report
9
Kiraoli to Kagarol
(Length-15.01)
(Extended to NH-3 Agra-Jhansi)
Length-13.1 km

10
Alignment with final option

11
12
13
PROJECT SALIENT FEATURES

FEATURES EXISTING PROPOSED

Project length (km) 15.01 15.197

NH/SH/MDR/Feeder UP MDR 127W NH - 321

Kiroli, Mori, Vamanpura, Jhengera,


Habitations Kiroli, Mori, Vamanpura, Jhengera, Kagarol
Kagarol

Two Lane Road (km) 15.01 Four Lane (15.197)

Existing ROW (m) 20-35 60 m

Major Bridge 1 at Km 3+025 (3x30) At design Ch. 3+335

Minor Bridge 1 at Km 10+700 (1x16.7) At design Ch. 11+100

Slab Culvert 13 As per requirement

Pipe Culvert 17 As per requirement

Minor Junction 19 Improvement as per IRC:SP:84-2014

ROB NIL
At design Ch. 0+550
Level Crossing & TVU at Km 0+600; TVU : 152760 (29.09.2014)

14
The position of existing alignment with respect to requirement of forest clearances is as under:-

Forest Clearance

Name of From To Length Environmen Wildlife


Permission Forest
the (km) t Clearance Clearance
for tree Diversion
corridor

Not
Jaipur-Agra Kiraoli Kagarol 15.197 Not required Required Not required
required

Start Point:- Km 0/0 of project corridor is at junction of Agra - Jaipur NH-11 (21)
and Kiraoli- Kagarol MDR 127W road.
End Point:- Km 15/197 of project corridor is at junction of Agra – Jagner SH-39 and
Kiroali – Kagarol MDR 127W raod.

15
Requirement Of Bypasses

Name of Road Proposed Bypass(km) Length (km)


Name of Bypass
From To

0+000(km
20+700 of NH-
Kiraoli - Kagarol Kiraoli Town 1+910 2.000
11)
(Design Ch.)
(Design Ch.)

Note: PD NHAI Agra during his site visit on 23.01.18, was of opinion that there is no
need of Public Consultation Meeting with DM Agra.

16
Agra to Mahuar
(length -18km)

17
Note- Alignment of existing road followed

18
19
20
PROJECT SALIENT FEATURES
FEATURES EXISTING PROPOSED
17.200 (km 0/0 is at
junction of NH-11(21) and
MG road near collectorate
Project length (Km) 18 Agra)
NH/SH/MDR/Feeder NH11 (21) NH11 (21)
Agra, Pathauli, Saraye, Agra, Pathauli, Saraye,
Habitations Midhakur Midhakur
17.200 km ( 4 lanned
Two Lane Road (km) 18 road)
Existing ROW (m) 17.5-30.5 60
2 Nos. 2 Nos.

Km 17+600 (1x36) &

Minor Bridge Km 9+960 (4x6.2)


Pipe Culvert 12 As per site requirement
Arch Culvert 1 As per site requirement
Major Junction 3 As per site requirement
Minor Junction 8 As per site requirement
LC-6-SPL/E-3 at Km 4+000; ROB proposed at design
Level Crossing & TVU TVU No. 2,36,572 (12/2015) Ch. 2+663.760 21
The position of existing alignment with respect to requirement of forest clearances is as under:

Forest Clearance
Permissi
Name of Environme Wildlife Forest
Length on for
the From To nt Clearan Diversio
(km) tree
corridor Clearance ce n
cutting
Notified
protected
Jaipur- Mahua Not Not
Agra 18 Required forest
Agra r required required
along the
road side

Start Point :- Km 0/0 is at junction of Agra - Jaipur NH-11(21) and MG road near
collectorate Agra.
End Point :- At Ch. 17+200 joining existing 4 lane road Agra - jaipur (NH-11).

22
Raipura - Rajapur

23
ALIGNMENT PLAN

24
25
PROJECT SALIENT FEATURES

FEATURES EXISTING PROPOSED

15.850 plus feasible option 2 bypass


Project length (km) 17.78 length 3.189 km

NH – 731AG
NH/SH/MDR/Feeder Unnamed

Raipuraa, Nadin, Rajapura


Habitations Raipuraa, Nadin, Rajapura

4 lane with divided CW.


Single Lane Road (km) 17

4 lane with divided CW


Intermediate Road (km) 1

45m
Existing ROW (m) 7.5-16
1 Minor Bridge
Minor Bridge 1 at Km 11+830 (4x6.8)

As per site requirement


Slab Culvert 6
As per site requirement
Pipe Culvert 8
As per site requirement
Major Junction -
As per site requirement
Minor Junction 13

26
The position of existing alignment with respect to requirement of forest clearances is as under:-

Forest Clearance
Name of From To Lengt Environm Wildlife Permissio Forest
the h ent Clearan n for tree Diversion
corridor (km) Clearance ce cutting
Notified
protected
Raipura Raipur Not Not
Rajapur 17.78 Required forest
-Rajapur a required required
along the
road side

Start Point :- Km 0/0 of Project corridor is at junction of Raipura – Rajapur


road and Chitrakut – Allahabad NH-76
End Point :- Km 17/780 of Project corridor is at junction of Raipura –Rajapur
road and Rajapur – Makhdompur-kazi road.

27
Requirement Of Bypasses

Name of Road Proposed Bypass(km) Length (km)


Name of Bypass
From To

15+300 19+275
Raipura - Rajapur Rajapur Town 3.975
(Design Ch.) (Design
Ch.)

Note : Public Consultation Meeting with DM Chitrakoot held on 17.03.18

28
MUZZAFARNAGAR
TO SHAMLI

29
ALIGNMENT PLAN

30
31
PROPOSED SHAMLI BYPASS BY STUP CONSULTANT

KM 37+620

32
PROJECT SALIENT FEATURES

FEATURES EXISTING PROPOSED


Project length (km) 40 37.620
NH/SH/MDR/Feeder SH 12
Muzaffarnagar, Khanjahanpur, Muzaffarnagar, Khanjahanpur,
Habitations
Pinna, Baghra, Banat, Shamli Pinna, Baghra, Banat,
Two Lane Road (km) 35 4-Lane
Four Lane Road (km) 7.5 4-Lane
Existing ROW (m) 14-38 60 m
3 at Km 2+200 (4x27), Km 2+320(Retained),20+020(New
Major Bridge 21+050 (5x28) & Km 36+250 construction),35+300(New
(4x25) Construction)
9+320(New
3 at Km 9+410 (2x5), Km 16+525 Construction),16+410(Widening),
Minor Bridge
(3x2.5) & Km 27+200 (3x4.6)
26+145(Widening)
Slab/Box Culvert 8 14
Pipe Culvert 14 12
Major Junction 3 2
Minor Junction 37 19
LC-SPL-90 at Km 40+980; TVU :
Level Crossing & TVU NIL
5,51,610 (19.10.2015)
33
The position of existing alignment with respect to requirement of forest clearances is as under:-

Forest Clearance
Name From To Length Environm Wildlife Permissio Forest
of the (km) ent Clearan n for tree Diversion
corrido Clearance ce cutting
r
Notified
MUZZA
Muzzaf protected
FARNA Not Not
arnaga Shamli 40 Required forest
GAR TO required required
r along the
SHAMLI
road side

Start Point :- Km 0/0 of Project corridor is at Muzzafnagar


End Point :- Km 37+620 (Design ch.)

Note : During Meeting dt. 20.03.18 at NHAI HQ, the bypss


for Shamli Town has been deleted from Scope of Work.

34
RUPAIDIHA TO BARABANKI

35
36
37
38
39
PROJECT SALIENT FEATURES

Features Existing Proposed


Project length (km) 145 152+684
NH/SH/MDR/Feeder NH 28C NH 28C
Rupaidiha, Kushali,
Babaganj, Nanpara,
Rupaidiha, Kushali, Babaganj, Nanpara, Bhagwanpur Mafi, Bahraich,
Bhagwanpur Mafi, Bahraich, Fakharpur, Lalpur, Fakharpur, Lalpur, Kaisarganj,
Habitations
Kaisarganj, Jarwal, Ramnagar, Shahabpur, Jarwal, Ramnagar, Shahabpur,
Baranbanki Baranbanki

Two Lane Road (km) 133.4 Four Lane Configuration


Four Lane Road (km) 19.5 Four Lane Configuration

Existing ROW (m) 30 60


2- New Construction; 2-
Major Bridge 4 (Km 35+550; 58+870; 59+345 & 136+050)
Retained
3-Retained; 1-Abonedoned; 25-
Minor Bridge 36 Widen; 2-Reconstruction; 5
(Retained + New Construction)
As per design of site
VUP 2 at Km 41+604 (1x10.5) & Km 40+987 (1x10.5)
requirement
Slab Culvert 121
115-Widen; 8-Abonedoned
40
17-New Construction
Box Culvert -

Pipe Culvert 6 6-Widen

As per design of site requirement


Major Junction 13

As per design of site requirement


Minor Junction 402

2 no. at Km 135+055 (2x32), Km


3 no. at Km 135+055 (2x32), Km 41+173 41+173 (1x36)
ROB (1x36) & Km 2+920 (15+24+15)
Of Existing Road
Of Existing Road

3 at Km 125+200, Km 64+500 & Km


Toll Plaza As per existing
4+500

68
Bus bays 44
12
Truck lay bye 6

41
The position of existing alignment with respect to requirement of forest
clearances is as under:

Forest Clearance

Name of the Lengt Environmen Wildlife Permission


From To Forest
corridor h (km) t Clearance Clearance for tree
Diversion
cutting

Notified
protected
International Rupaidih Not
Barabanki 145 Not required Required forest along
Connectivity a required
the road
side

Start point : KM 0+000 (at Nepal Border of NH-28C)


End point: KM 152+684 of NH-28C at Barabanki city connecting to NH-28

42
Requirement of Bypasses

Proposed Bypass(km) Length (km)


Name of Road
From To

Babaganj
Km 10+200 4.300
Km 5+900
Rupaidiha-Barabanki
Keserganj
Km 97+600 6.100
Km 91+500

Note:- In compliance of NHAI HQ Letter dated 8-1-2018,Public hearing


consultation meeting under the chairmanship of DM Bahraich,
held on 30-1-2018 and minutes of meeting issue vide DM letter
no.826/28ml dated 17-2-2018.
During the meeting there was a sugestion for a Elevated road in
Babaganj town but it is not possible due to insufficient available
ROW(16m).
Remaining road length to be developed to 4-Lane configuration
43
Sonauli - Gorakhpur

44
45
46
47
PROJECT SALIENT FEATURES

Features Existing Proposed


Project length (km) 97 80+030
NH/SH/MDR/Feeder NH29E NH29E
Sonauli, Nautanwala, Sampatiya, Kolhai Bazar,
Sonauli, Nautanwala, Sampatiya, Kolhai Bazar, Parsoni, Parsoni, Bhaiya Farenda, Campierganj, Peepiganj
Habitations
Bhaiya Farenda, Campierganj, Peepiganj

Four Lane Configuration


Two Lane Road (km) 63.37

Four Lane Road (km) 23 Four Lane Configuration


Existing ROW (m) 20-46 45
Major Junction 3 As per site requirement
As per site requirement
Minor Junction 267

Major Bridge 2 1-Retained; 1-New Construction

2-Widened; 3 (Retained + New Construction); 1-


Minor Bridge 6 Abonedoned; 1- New Construction (bypass)

Slab Culvert 60 53-Widen; 3-Retained;4- abandoned

37-Widen; 2-Reconstruction; 5 - abandoned


Pipe Culvert 44

19 New Construction (bypass)


Box Culvert -
2 no. at Km 52+724 (1x32) & Km 61+574 (1x32)
Flyover 2 no. at Km 52+724 (1x32) & Km 61+574 (1x32)

VUP 1 at km 34+677 ( 1 x 10.5 ) 1 at km 34+677 ( 1 x 10.5 )


ROB 1 at Km 34+910 (1x24) 1 at Km 34+910 (1x24)
Toll Plaza 2 at Km 11+070 & at Km 75+915 2 at Km 11+070 & at Km 75+915

Bus bays 21 32
Truck lay bye 4 6

48
The position of existing alignment with respect to requirement of forest clearances is
as under:-

Forest Clearance
Name of Wildlife Permissio
Length Environmen Forest
the From To Clearanc n for tree
(km) t Clearance Diversion
corridor e cutting
Reserved
forest (km
61.700 to
Internation km 67.170)
al Gorakhp Not and
Sonauli 97 Not required Required
Connectivit ur required notified
y protected
forest along
the road
side

Start point : Sonauli (KM 0+000 at Nepal Border)`


End point : Gorakhpur (KM 80+030)

49
Requirement Of Bypasses

Name of Road Proposed Bypass(km) Length (km)


Name of Bypass
From To

22+450 28+400
Kolhui Bazar 5.950
(Design Ch.) (Design
Ch.)
Sonauli- Gorakhpur

Pepeeganj 72+560 74+050


1.490
(Existing Ch.) (Existing Ch.)

In Compliance of GM (Tech) Bharatmala Letter No. 111079 Dated 08.01.2018, the


meeting with District Administration is yet to be convened

50
THANKS

51