0% found this document useful (0 votes)
45 views7 pages

Key Points: Yangon Technological University Department of Petroleum Engineering

1) The document summarizes the key points from the first day of TPA training at Yangon Technological University's Department of Petroleum Engineering. 2) It covers important concepts in petroleum engineering including resources and reserves, economic considerations for well development, technologies for exploration and production, and methods for primary and enhanced oil recovery. 3) Safety is emphasized as the top priority, and drilling hazards such as equipment failures, human errors, formation instability, and hydrostatic instability are identified along with how to control and report them.

Uploaded by

Yè Paing Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views7 pages

Key Points: Yangon Technological University Department of Petroleum Engineering

1) The document summarizes the key points from the first day of TPA training at Yangon Technological University's Department of Petroleum Engineering. 2) It covers important concepts in petroleum engineering including resources and reserves, economic considerations for well development, technologies for exploration and production, and methods for primary and enhanced oil recovery. 3) Safety is emphasized as the top priority, and drilling hazards such as equipment failures, human errors, formation instability, and hydrostatic instability are identified along with how to control and report them.

Uploaded by

Yè Paing Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Yangon Technological University

Department of Petroleum Engineering

Key Points
1st Day (TPA Training)

Presented by :
Ye Paing Oo
YTU

1
Noteworthy Points
• Resources & Reserves

• Economic consideration on Well


development
Drilling plan

• New Technologies Breakthrough


Development
Exploration Well Appraisal Well Initial Completion
Well

Drilling+Log+ DST+P&A

Production Well Injection Well

2
Noteworthy Points
• Oil Recovery
1. Primary Recovery
2. IOR (Secondary+Tertiary recovery)
3. EOR (Tertiary recovery)

• Onshore & Offshore Rigs


• Different Type of RIgs
• Six main drilling functions
• Camp for accomodation

3
Noteworthy Points
• Drilling
1. Pore Pressure < Mud Pressure < Fracture Pressure
2. Mud Weight Window
3. Casing & Setting Depth
4. Drilling String
5. Drilling Mud
6. Drilling Bits

4
Noteworthy Points
• Safety = 1st Priority
• Drilling Hazarda : Equipment Failure & Human Error
: Drilled Formation Unstability
: Hydrostatic Unstability

• Drilling Hazards induce damage to personnel, environment and


Equipment & Facilities.

Identify Control Report


5
Noteworthy Points
• Data acquisition is essential
• Limit uncertainties
• Limit no. of appraisal wells
• Reduce future well cost

• cutting analysis
Detection of HC • core analysis
• tests of formation (DST)
• Electrical Logging Measurements
• Mud Logging
6
7

You might also like