Materials Handling
Material handling is the function of moving
the right material to the right place, at the
right time, in the right amount, in right
sequence, and in the right position or
condition to minimize production costs.
Goals of Material Handling
The primary goal of material handling is to
reduce unit costs of production.
1. Maintain or improve product quality, reduce
damage, and provide for
protection of materials.
2. Promote safety and improve working conditions.
3. Promote productivity through the following:
4. Material should move as short a distance as
possible.
• Material should flow in a straight line.
• Move more material at one time.
4. Promote increased use of facilities as follows:
• Promote the use of the building cube.
• Purchase versatile equipment.
• Standardize material handling equipment.
• Maximize production equipment utilization
using material handling feeders.
• Maintain, and replace as needed, all
equipment and develop a preventive
• Maintenance program.
• Integrate all material handling equipment into
a system.
5. Reduce tare (dead) weight.
6. Control Inventory.
The following factors are to be
taken into account while
selecting material handling
equipment:
• Properties of the material
• Layout and characteristics of the building
the material
• Production flow
• Cost considerations
• Nature of operations
Principles of
Material Handling
1. PLANNING PRINCIPLE
All material handling should be the
result of a deliberate plan where the
needs, performance objectives and
functional specification of the proposed
methods are completely defined at the
outset.
2. STANDARDIZATION
PRINCIPLE
Material handling methods, equipment,
controls and software should
be standardized within the limits of achieving
overall performance
objectives and without sacrificing needed
flexibility, modularity and
throughput anticipation of changing future
requirements
3. WORK PRINCIPLE
Material handling work should be minimized
without sacrificing
productivity or the level of service required
of the operation.
4. ERGONOMIC PRINCIPLE
Human capabilities and limitations must be
recognized and
respected in the design of material handling
tasks and equipment to
ensure safe and effective operations.
5. UNIT LOAD PRINCIPLE
Unit loads shall be appropriately sized and
configured in a way which
achieves the material flow and inventory
objectives at each stage in
the supply chain.
6. SPACE UTILIZATION
Effective and efficient use must be made of
all available space.
7. SYSTEM PRINCIPLE
Material movement and storage activities
should be fully integrated to
form a coordinated, operational system which
spans receiving,
inspection, storage, production, assembly,
packaging,
unitizing, order selection, shipping,
transportation and the handling
of returns.
8. AUTOMATION PRINCIPLE
Material handling operations should be
mechanized and/or automated where
feasible to improve operational efficiency,
increase responsiveness, improve
consistency and predictability.
9. ENVIRONMENTAL
PRINCIPLE
Environmental impact and energy
consumption should be
considered as criteria when designing or
selecting
alternative equipment and material
handling systems.
10. LIFE CYCLE COST
PRINCIPLE
A thorough economic analysis should
account for the entire life
cycle of all material handling equipment
and resulting systems.
The following guidelines are
invaluable in the design and cost
reduction of the materials
handling system:
• As material handling adds no value but increases
the production cycle time, eliminate handling
wherever possible. Ideally there should not be any
handling at all.
• Sequence the operations in logical manner so that
handling is unidirectional and smooth.
• Use gravity wherever possible as it results
in conservation of power and fuel.
• Standardise the handling equipments to
the extent possible as it means
interchangeable usage, better utilisation of
handling equipments, and lesser spares
holding.
• Install a regular preventive maintenance
programme for material handling
equipments so that downtime is minimum