0% found this document useful (0 votes)
619 views4 pages

3G Congestion Optimization

3G CSSR CS Optimization for improving Voice VQI

Uploaded by

muh47ir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
619 views4 pages

3G Congestion Optimization

3G CSSR CS Optimization for improving Voice VQI

Uploaded by

muh47ir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Security Level:

3G CSSR_CS Optimization
CSRABCACOPTSWITCH
JABO
3G | CS Access Optimization.
Back Ground: CSSR_CS(%) VS Failure Congestion VQI Distribution(%) • CSSR CS improve
CS service setup success rate 100 12000 78 30 3.95% from 95.67% to
degradation during network 99 99.45%.
congestion. Enable optimized 98 10000 77 25
• Voice VQI Excellent
resource allocation of CS RAB 97 improve 2.38% from

Excellent.TimeRate(%)
76 20
96 8000
setup resources by setting 75.6% to 77.4%

CSSR_CS(%)
95
CSRABCacOptSwitch to ON RNC

#Failure
75 15

%
94 6000
allocates power resources, code
93
resources, channel element (CE) 74 10
92 4000
resources during CS RAB setups
91
73 5
based on the loose CAC algorithm. 90 2000

89 72 0
Impact Performance: 88 0 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan
When this switch is turned on, the 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan
Average of VS.Voice.VQI.Good.TimeRate(%) Average of VS.Voice.VQI.Accept.TimeRate(%) Average of VS.Voice.VQI.Poor.TimeRate(%)
CS RAB setup success rate Sum of VS.RRC.FailConnEstab.Cong Sum of VS.RAB.FailEstabCS.Cong Sum of CSSR_CS(%) Average of VS.Voice.VQI.Bad.TimeRate(%) Average of VS.Voice.VQI.Excellent.TimeRate(%)

increases and the cell capacity for


CS services is enlarged. However, Traffic CS(Erl) RAB.EstabCS.MeanTime(ms) VS OrigCall.EstabMeanTime.AMRNB(ms)
the PS service setup success rate 700 790 4950 • CS Traffic compare
Christmas & New Year holiday
and the cell capacity for PS services 4900 before Long weekend
650
will decrease in the case of cell 780 4850 have increment 5.22%

OrigCall.EstabMeanTime.AMRNB
resource congestion. 600
4800 • Voice delay improve

RAB.EstabCS.MeanTime
550 770
4750 2.59% from 770ms to
Parameter: 750ms
4700
500
MOD UCELLALGOSWITCH: 760
4650
CELLID=XX, 450
4600
CSRABCacOptSwitch=ON; 750
400 4550

4500
Implementation: 350 740
4450
73 Cells on RNC Huawei_Depok & 300
730 4400
10-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan
1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan
20-Dec

21-Dec

22-Dec

23-Dec

24-Dec

25-Dec

26-Dec

27-Dec

28-Dec

29-Dec

30-Dec

31-Dec

Huawei_Depok_2 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan

Average of VS.RAB.EstabCS.MeanTime(ms) Average of VS.OrigCall.EstabMeanTime.AMRNB(ms)


CSRAB_Optimization

2
3G | CS Access Optimization.
Back Ground: CSSR_PS(%) VS PS RAB Failure
Traffic PS R99 + HSDPA + HSUPA (GByte) • CSSR PS < 98.5% due
CS service setup success rate 92 35000 to RAB Fail RNL inline
1400
degradation during network 90 30000 with high IPPATH ping
congestion. Enable optimized 88 25000
1200 delay due to high RSL
resource allocation of CS RAB 1000
at link 103088_101677

#Failure
86 20000
setup resources by setting already escalated

%
CSRABCacOptSwitch to ON RNC 84 15000 800 • TT# : INC-20181218-
allocates power resources, code 82 10000 600 00016450 & INC-
resources, channel element (CE) 20181218-00016488
80 5000
resources during CS RAB setups 400 • Total Traffic
78 0
based on the loose CAC algorithm. 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 200 maintained.
CSRAB_Optimization
0
Impact Performance: Sum of VS.RAB.FailEstabPS.Cong Sum of VS.RAB.FailEstabPS.RNL
2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan
When this switch is turned on, the Sum of VS.RAB.FailEstabPS.UuFail Sum of VS.RAB.FailEstabPS.IubFail
CS RAB setup success rate Sum of VS.RAB.FailEstabPS.TNL Average of MEGA - CSSR PS - with EFD (%) Total
increases and the cell capacity for
CS services is enlarged. However,
HSDPA.MeanChThroughput(Kbps) VS HSDPA User IPPATH.PING.MeanDELAY(ms) VS RAB.FailEstabPS.RNL
the PS service setup success rate • HSDPA throughput
200 3000 3500 16000
and the cell capacity for PS services slightly degrade not
180 14000
will decrease in the case of cell 2500
3000
related with activity.
resource congestion. 160 12000
2500
140 10000
2000 2000
Parameter: 120 8000
Kbps

MOD UCELLALGOSWITCH: 100 1500 1500

#
6000
CELLID=XX, 80 1000
4000
CSRABCacOptSwitch=ON; 60
1000
500 2000
40
500 0 0
Implementation:

16:00

16:00

16:00

16:00
16:00

16:00

16:00

16:00

16:00

16:00

16:00

16:00

16:00

16:00
0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00

0:00
8:00
20
73 Cells on RNC Huawei_Depok &
0 0
Huawei_Depok_2 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan11-Jan12-Jan13-Jan14-Jan15-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan

Sum of VS.HSDPA.UE.Mean.Cell Average of VS.HSDPA.MeanChThroughput.NEW RAB.FailEstabPS.RNL IPPATH.PING.MeanDELAY(ms)

3
Thank You.
Copyright©2018 Huawei Technologies Co., Ltd. All Rights Reserved.

You might also like