0% found this document useful (0 votes)
33 views3 pages

Welcome: Training Programme On Comprehensive Look-In Into Statutory Requirements On Projects in India

The document outlines a training program schedule over multiple days covering statutory requirements for projects in India. It details 14 topics to be covered including petroleum rules, storage vessel rules, electrical equipment rules, and more. Faculty from various departments will conduct sessions on regulations and standards for onshore and offshore operations.

Uploaded by

ishu vohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views3 pages

Welcome: Training Programme On Comprehensive Look-In Into Statutory Requirements On Projects in India

The document outlines a training program schedule over multiple days covering statutory requirements for projects in India. It details 14 topics to be covered including petroleum rules, storage vessel rules, electrical equipment rules, and more. Faculty from various departments will conduct sessions on regulations and standards for onshore and offshore operations.

Uploaded by

ishu vohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 3

WELCOME

TRAINING PROGRAMME ON
COMPREHENSIVE LOOK-IN INTO
STATUTORY REQUIREMENTS
ON PROJECTS IN INDIA

Delivering excellence through people 11-23 Dec.2008


Slide Number- 1 of 3
TRAINING PROGRAMME SCHEDULE: DAY-1
S.N. ACT/ REGULATION BRIEF SCOPE MAIN FACULTY SUB FACULTY DURATION REMARKS
A. OPENING SESSION (1.10pm to 1.30 pm)
DATE: 11, 12,16,18 & 22th Dec.’2008 (AN) (1.30pm to 7.00pm) AND 20th Dec.’2008 (FN) (9.00am to 1.15pm)
B. ONSHORE OPERATIONS
 1 Petroleum Rules Plot Plan/ Layout for all Oil, Gas, General Civil
Petrochemical Plants, Pipeline Terminals Dept
Electrical Dept 45m 1.30 pm to 2.15 pm
(9.00 am to 9.40 am on
etc 20th Dec.’2008)
2 SMPV Rules Design and Layout of pressurized General Civil Static 30m 2.15 pm to 2.45pm
Storages, Mounded Vessel, Double Wall Dept Equipment (9.40 am to 10:00 am on
Tank Dept 20th Dec.’2008)
3 Gas Cylinder Rules LPG Bottling Plant, Pressurized Storage General Civil 15m 2.45pm to 3.00 pm
Cylinders Dept (10.10 am to 10:15 am
on 20th Dec.’2008)
4 Oil Mine Safety Layout of Onshore well heads, GGS etc General Civil Electrical Dept 15m 3.15 pm to 3.30pm
Regulations Dept (10.30 am to 10:45 am
on 20th Dec.’2008)
5 Indian Aircraft Act Tall Structures, Equipments and General Civil 15m 3.30pm to 3.45pm
Buildings near Aerodrome Dept (10.45 am to 11.00 am
on 20th Dec.’2008)
6 Environment Rules Water Quality, Waste Management, Air Environmental 30m 3.45pm to 4.15 pm
Pollution, Noise Pollution, Effluent Division (11.00 am to 11.30 am
Discharge etc on 20th Dec.’2008)
7 Indian Electricity Electrical equipments, Layout of Electrical Dept. General Civil 30m 4.15 pm to 4.45 pm
Rule switchyard , Lightening protection, fire Dept (11.45 am to 12.15 pm
protection etc on 20th Dec.’2008)
C. INSURANCE AND OISD STANDARDS
8 Insurance Aspects TA C Rules for Fire Protection system General Civil 30m 5.00pm to 5.30 pm
Plant Dept (12.15 pm to 12.45 pm
on 20th Dec.’2008)
9 OISD Audit Plot Plan, Unit Layout, Fire protection, General Civil Electrical, S&A 30m 5.30pm to 6.00 pm
Control Room, Electrical Work, Fire Dept Dept. (12.45 pm to 01.15 pm
Proofing , Pipeline, Mounded Storage et on 20th Dec.’2008)

11-23 Dec.2008
Engineers India Ltd – Delivering excellence through people Slide Number - 2 of 3
TRAINING PROGRAMME SCHEDULE: DAY-2

S.N. ACT/ REGULATION BRIEF SCOPE MAIN FACULTY SUB FACULTY DURATION REMARKS
 th th
DATE: 10, 15,17,19 & 23 Dec.’2008 (AN) (1.30pm to 7.00pm) AND 20 Dec.’2008 (FN) (2.00am to 7.00pm)
A. ONSHORE OPERATIONS (Contd)
10 Indian Boiler Steam Boiler, Equipment and Piping for Piping Dept SED, PEDt 45m 1.30 pm to 2.15pm
Regulation Steam Services (2.00 pm to 2.45 pm on
20th Dec.’2008)
11 Other Central River, Canal, Road Crossing, ROB, RUB, Pipe Line Dept General Civil 15m 2.15 pm to 2.30 pm
/State Govt. Act Pipe Crossings, Right of way etc Dept (2.45 pm to 3.00 pm on
/Rules 20th Dec.’2008)
12 Factory Rule Arch aspects of Plant and Non Plant Structure & Electrical Dept 40m 2.50 pm to 3.30 pm
Building and Architecture (3.00 pm to 3.40 pm on
Structural Stability of Buildings Dept 20th Dec.’2008)

B. OFF SHORE OPERATIONS


13 Custom, Navy, OED 30m 3.30 pm TO 4.00 pm
Marine Warranty (3.40 pm to 4.10 pm on
Surveyor 20th Dec.’2008)
F. GEO-TECHNICAL ENGINEERING

14 Geo-technical Geotechnical Investigation, Ground Structure & OED 120m 4.45 pm to 6.45 pm
Engineering improvement, Equipments etc for Architecture
onshore projects Dept

11-23 Dec.2008
Engineers India Ltd – Delivering excellence through people Slide Number - 3 of 3

You might also like