Calculations Sheet: Under Super Vision Of: Prepared by

The document presents the calculations for a concrete project consisting of a ground floor, first floor, second floor, and roof. It includes calculations for various structural elements such as flat slabs, ribs systems, hollow block systems, girders, beams, and columns. Deflection, reinforcement, and moment calculations are provided for the different floor systems in various parts of the building. Auditorium floors are designed using a girder system with secondary beams to resist the applied live loads. Beam design includes calculating the required reinforcement based on bending moment diagrams.

Uploaded by

Taha Gargoum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views172 pages

Calculations Sheet: Under Super Vision Of: Prepared by

The document presents the calculations for a concrete project consisting of a ground floor, first floor, second floor, and roof. It includes calculations for various structural elements such as flat slabs, ribs systems, hollow block systems, girders, beams, and columns. Deflection, reinforcement, and moment calculations are provided for the different floor systems in various parts of the building. Auditorium floors are designed using a girder system with secondary beams to resist the applied live loads. Beam design includes calculating the required reinforcement based on bending moment diagrams.

Uploaded by

Taha Gargoum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 172

Ain shams university

Faculty of engineering
Concrete project

Main unit
(Unit 1 & 2)

Calculations
sheet

Under super vision


of :
Prof. Dr. / Ashraf bedda.
Dr. / Judy soliman.
Prepared by:
Youssuf Abd El-Monaim Abd El-
Mohsen.
Calculations sheet 2
content : (Pg. 3).
1- Introduction
2- Ground ceiling slab (Pg. 3-20).
3- Ribs system calculations (Pg. 13).
4- One way H.B system calculations (Pg. 14).
5- Girders calculations (Pg. 18-20).
6- First floor ceiling slab (Pg. 21-43).
7- Two fixed frame calculations (Pg. 27-32).
8- Second floor ceiling slab (Pg. 44-60).
9- Roof ceiling slab (Pg. 61-69).
10- Two way H.B system calculations (Pg. 65-66).
11- Manual calculations of beams (Pg. 70-74).
12- Ground ceiling beams (Pg. 75-78).
13- First floor ceiling beams (Pg. 79-82).
14- Second floor ceiling beams (Pg. 83-86).
15- Roof ceiling beams (Pg. 87-88).
16- Columns (Pg. 89-100).
17- Stairs (Pg. 101-116).
18- Check column buckling (Pg. 117-118).
19- Check Punching (Pg. 119- 136).
20- Design of core (Pg. 137).
21- Footings (Pg. 138-159).
22- Design of second unit - Arch girder - (Pg.
160-172).
Introduction
3

*The Project consists of ground, First floor,


Second floor and roof floor .

*The project consists of 4 parts (Upper left part,


Lower left part, mid. Part, Right part) divided by
3 expansion joints .

Upper left part

Lower left part Mid. part Right part


Ground ceiling
4

1- Right part
The Right part consists of :

1- Flat inclined slab 26cm .


2- Solid slabs 16cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 847
Allow =250 =
250 = 3.39 cm .

Max = 2.65 cm For flat slab .


1- Right part 5

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
1- Right part 6

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
Ground ceiling
7

2- Middle part
The Middle part consists of :

1- Flat inclined slab 26cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 820
Allow =250 =
250 = 3.28 cm .

Max = 2.52 cm For flat slab .


2- Middle part 8

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
2- Middle part 9

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
Ground ceiling
10

3- Upper left part


The Upper left part consists of :

1- Flat slab 26cm .


2- Ribs system with ribs (10*40) with spacing 70cm and slab
7cm.
3- One way Hollow block With blocks (200*400*250).
4- Solid slab 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 925
Allow =250 =
250 = 3.7 cm

= 3.6 cm For flat slab ,


Max Max = 3.45 cm For Ribs
system.
3- Upper left part 1
1
2- M1-1 For Lower Additional RFT :
Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
3- Upper left part 12

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
** For Admin floors in the Upper left part : 13
∵ spans = 5.9m & 9.8 m
∴ Use Ribs system .
Take Ribs depth = 9.8/25= 0.4m
∴ Take ribs (10*40) with spacing 70 cm & slab 7 cm
.

WRIB= (1.4(0.07*2.5+0.15+1.6*0.3)*0.8*1 +1.4(0.1*0.4*1*2.5) =


0.888 T/m.s
= 0.888 t /m.s2 2

+Ve moment
0.888=T/m`
W*L /8= 0.111*L T.m
0.888 T/m`

5.9 ((m)) 9.8 ((m))

3.86 T.m 8.53 T.m

Take d= 400-30 = 370 mm Take d= 400-30 = 370 mm

d = c1 38.6*106 ∴c1 = 9.41 d = c1 85.3*106 ∴c1 = 6.33


25*1000 25*1000
j = 0.826 j = 0.826
6 6
MU.L* 10 MU.L* 10
∴ 2
∴ =
As
2
=775.3 m
360 * 370 * 0.826 360 * 370 * 0.826

∴As = 2 16 / rib ∴As = 2


=350.80 mm 25 / rib
** For Office floors in the Upper left part : 14
2
∵ Area = 7.5 * 12 m 1
∴ Use One way Hollow blocks system .
Take Blocks = ( 200*400*250) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m

WRIB=(1.4(0.07*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.25*1*25) +
1.4*0.2*5
= 6.95 KN/m.s = 0.695 T/m.s
2

+Ve moment = W*L /8 = 4.63 T.m


0.695 T/m`

7.30 ((m))

4.63 T.m

Take d= 320-30 = 290 mm

d = c1 46.3*106 ∴c1 = 4.76


25*500
j = 0.824
6
MU.L* 10
∴ 2
360 * 290 * 0.824
As = =544.03 mm
∴As = 2 20 / rib
Ground ceiling
15

4- Lower left part


The Lower left part consists of :

1- Flat slab 26cm .


2- Girders system with section (40*90) and secondary beams
(25*60) with spacing 2.65 m.
3- Solid slabs 16cm and 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 700 1060
Allow =250 250
= = 2.8 cm , 250=
Allow = 4.24 cm

= 2.15 cm For flat slab ,


Max Max = 1.60 cm For Girders
system.
4- Lower left part 16

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
4- Lower left part 17

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
18
** For the Two AUDITORIUMS On the lower left
part :
∵ Each Auditorium span = 10. 6m
∴ Use Girders system . Live load from
Egyptian code for
loads
Ws U.L= 1.4(0.12*2.5+0.2)+1.6*0.4
2 2
=1.34 t /m= 13.4 KN/m
2 2
+Ve moment = W*L /10 = 0.134*L 1T.m

Assume using RFT 5 10 /m 1.34 T/m`


2
∴ As = 392.7 mm L ((m))
6
MU.L* 10
∴ As = =392.7mm
2
360 * 100 * 0.826

∴MU.L = 11.67KN.m = 1.167 T.m2 2


0.134*L T.m

∴ From 1 &2

∴0.134 * L 2 = 1.167 T.m


∴ Max spacing between sec beams = 2.95m

∴ Take 4 spacings each = 2.65m (Resisting by 5 10 /m


Design of sec beams
19
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m

For External beams :


2.65
2
∴We = 5.25 + 12.2 * = 21.4 KN/m`
2.14 T/m` 2.14 T/m`

4.5 ((m)) 7.2 ((m))

5.42 T.m 13.87 T.m

2
∴As = 331.4 mm2 ∴As = 886.72 mm
∴As = 5 10 ∴As = 5 16
`
For internal beams :

∴We = 2.65
5.25 + 2*12.22* =
37.6 KN/m`
3.76 T/m` 3.76 T/m`

4.5 ((m)) 7.2 ((m))

9.52 T.m 24.37 T.m

∴As = 588.5 mm2 ∴As = 1716.61 mm2


∴As = 6 12 ∴As = 6 20
Design of girders : 20
2 2
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m For internal beams :
For External beams2.65 : 2.65
∴We = 5.25 + 2*12.2 * =
2 2
∴We = 5.25 + 12.2 * 37.6
= 21.4 KN/m`
KN/m`
∴ Rext. =21.4 * 6.5 = 139.1 KN ∴ Rint. =37.6 * 6.5 = 244.3 KN
2 2

∵ O.W of Girder = 1.4*0.4*0.9*2.5 = 1.26 t/m = 12.6


KN/m
139. 244.3 244.3 244.3 244.3 244.3 244.3 244.3 139.
1 1

10.6 ((m))12.6 KN/m` 10.6 ((m))


3 2 1

382.68 KN.m 1020.5 KN.m 382.68 KN.m

3
834.94 KN.m 1
834.94 KN.m
2
Sec 1-1 Sec 2-2
Take d= 900-50 = 850 mm Take d= 900-50 = 850 mm

d = c1 1020.5*106 ∴c1 = 2.66 d = c1 834.94*106∴ 1 c = 2.94


25*400 25*400
6
j = 0.700 j = 0.736
MU.L* 10 6
∴ 2
∴ =
As
MU.L* 10
=
2
3707 mm
360 * 850 * 0.700 360 * 850 * 0.736

∴AAss== 10 25
=4764.3 mm
∴As = 8 25

Sec 3-3
∴ As = 5 20
First floor ceiling
21

1- Right part
The Right part consists of :

1- Flat inclined slab 26cm .


2- Solid slabs 16cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 847
Allow =250 =
250 = 3.39 cm .

Max = 3.31 cm For flat slab .


1- Right part 22

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

‫ذ‬
1- Right part 23

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B
First floor ceiling
24

2- Middle part
The Middle part consists of :

1- Flat inclined slab 26cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 820 2400
Allow =250 =
250 = 3.28 cm , 250
Allow= = 9.60
cm

Max = 3.20 cm For flat slab , Max = 9.20 cm For frame .


2- Middle part 25

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
2- Middle part 26

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
27
** For the Large AUDITORIUMS in the middle
part :
∵ Auditorium span = 24 m
∴ Use two fixed Frames system . Live load from
Egyptian code for
loads
Ws U.L= 1.4(0.12*2.5+0.0.15)+1.6*0.4
2 2
=1.27 t /m= 12.7 KN/m
2 2
+Ve moment = W*L /10 = 0.127*L 1T.m

Assume using RFT 5 10 /m 1.27 T/m`


2
∴ As = 392.7 mm L ((m))
6
MU.L* 10
∴ As = =392.7mm
2
360 * 100 * 0.826

∴MU.L = 11.67KN.m = 1.167 T.m2 2


0.127*L T.m

∴ From 1 &2

∴0.127 * L 2 = 1.167 T.m


∴ Max spacing between sec beams = 3.03m

∴ Take 8 spacings each = 3.00m (Resisting by 5 10 /m


Design of sec beams
28
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m

For External beams :


3
2
∴We = 4.40 + 11.1 * = 21.1 KN/m`
2.11 T/m` 2.11 T/m`

4.5 ((m)) 7.2 ((m))

5.42 T.m 13.67 T.m

2
∴As = 331.4 mm2 ∴As = 886.72 mm
∴As = 5 10 ∴As = 5 16
`
For internal beams :
3
∴We = 4.40 + 2*11.1*
2 =
37.7 KN/m`
3.77 T/m` 3.77 T/m`

4.5 ((m)) 7.2 ((m))

9.54 T.m 24.43 T.m

∴As = 588.5 mm2 ∴As = 1716.61 mm2


∴As = 6 12 ∴As = 6 20
Design of Two fixed frame :
2
∵ Ws = 1.4*(0.12*25 + 1.5) + 1.6*3= 11.1 KN/m
29
For External beams : For internal beams :
∴Wa = 4.4+11.1 * 1.5 = 21.05 ∴Wa = 4.4 + 2 * 11.1 * 1.5 = 37.6
KN/m` KN/m`
∴ RExt. = 21.05 * 7.5 = 157.9 KN ∴ Rint. = 37.7 * 7.5 = 282.75 KN
282.75 * 7 1405.5 + 793 2
∴ Dist. Load on frame = 1.4*0.4*1.7*25
24 + +
1405. 24
= 197.9KN/m 779
5
157. 282.7 282.7 282.7 282.7 282.7 282.7 282.7 157.
9 5 5 5 5 5 5 5 9

23.8 KN/m`

7.50 ((m))
8.70 ((m))
15.00 ((m)) 8.70 ((m)

24.00 ((m))
157. 157.
9 197.9 KN/m` 9

8.70 ((m))
8.70 ((m))

24.00 ((m))
30
1 2

3 3

1 2

4 4
Sec 1-1 31
ck
PU.L= 1832.7 *1000
= 0.0535 > 0.004 (Don`t neglect N
FCU * b * t 30*600*1900
MU.L e 4.76
= 4.76 m
PU.L ∴ =
1.90 = 2.51 > 0.5 ∴
t
es = e + t/2 - c = 2.51 + 0.95 – 0.1 = 3.26 m

M U.S = PU.L * es = 5974.6 KN.m


Take d= 1900-100 = 1800 mm

d = c1 5974.6*106 ∴c1 = 3.12


30*600 ∴ J = 0.754
6 3
MU.S* 10 PU.L* 10 2
A∴s = - = 6373.7 mm ∴As = 13 25
360 * 1800 * 0.754 360/1.15

Sec 2-2
k
PU.L = 1832.7 *1000
= 0.0535 > 0.004 (Don`t neglect N
FCU * b * t 30*600*1900
MU.L e 3.25
= 3.25 m
PU.L ∴ =
1.90 = 1.71 > 0.5 ∴
t
es = e + t/2 - c = 1.71 + 0.95 – 0.1 = 2.56 m

M U.S = PU.L * es = 4691.71 KN.m


Take d= 1900-100 = 1800 mm

d = c1
4691.7*106 ∴c1 = 3.52
30*600 ∴ J = 0.781
6 3
MU.S* 10 PU.L* 10 2
A∴s = - = 3416.1 mm ∴As = 7 25
360 * 1800 * 0.781 360/1.15
Sec 3-3 32

k
PU.L= 2568.9 *1000
= 0.07515 < 0.004 (Don`t neglect
FCU * b * t 30*600*1900
MU.L e 3.39
= 3.39 m
PU.L ∴ =
1.90 = 1.784 > 0.5 ∴
t
es = e + t/2 - c = 1.784 + 0.95 – 0.1 = 2.634 m

M U.S = PU.L * es = 6766.48 KN.m


Take d= 1900-100 = 1800 mm

d = c1
6766.48*106 ∴c1 = 2.935
30*600 ∴ J = 0.735
6 3
MU.S* 10 PU.L* 10 2
A∴
s= - = 6000.72 ∴As = 13
mm 25
360 * 1800 * 0.735 360/1.15

Sec 4-4
ck
PU.L= 2568.9 *1000
= 0.0751 > 0.004 (Don`t neglect N
FCU * b * t 30*600*1900
MU.L e 2.10
= 2.10 m
PU.L ∴ =
1.90 = 1.11 > 0.5 ∴
t
es = e + t/2 - c = 1.11 + 0.95 – 0.1 = 1.96 m

M U.S = PU.L * es = 5035.04 KN.m


Take d= 1900-100 = 1800 mm

d = c1 5035.04*106 ∴c1 = 3.4


30*600
∴ J = 0.775
6 3
MU.S* 10 PU.L* 10 2
A∴s = - = 1819.8 mm ∴As = 5 22
360 * 1800 * 0.775 360/1.15
First floor ceiling
33

3- Upper left part


The Upper left part consists of :

1- Flat slab 26cm .


2- Ribs system with ribs (10*40) with spacing 70cm and slab
7cm.
3- One way Hollow block With blocks (200*400*250).
4- Solid slab 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 925
Allow =250 =
250 = 3.7 cm

= 3.6 cm For flat slab ,


Max Max = 3.45 cm For Ribs
system.
3- Upper left part 34

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
3- Upper left part 35

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
** For Admin floors in the Upper left part : 36
∵ spans = 5.9m & 9.8 m
∴ Use Ribs system .
Take Ribs depth = 9.8/25= 0.4m
∴ Take ribs (10*40) with spacing 70 cm & slab 7 cm
.

WRIB= (1.4(0.07*2.5+0.15+1.6*0.3)*0.8*1 +1.4(0.1*0.4*1*2.5) =


0.888 T/m.s
= 0.888 t /m.s2 2

+Ve moment
0.888=T/m`
W*L /8 = 0.1110*L 0.888
T.m T/m`

5.9 ((m)) 9.8 ((m))

3.86 T.m 8.53 T.m

Take d= 400-30 = 370 mm Take d= 400-30 = 370 mm

d = c1 38.6*106 ∴c1 = 9.41 d = c1 85.3*106 ∴c1 = 6.33


25*1000 25*1000
j = 0.826 j = 0.826
6 6
MU.L* 10 MU.L* 10
∴ 2
∴ =
As
2
=775.3 m
360 * 370 * 0.826 360 * 370 * 0.826

∴As = 2 16 / rib ∴As = 2


=350.80 mm 25 / rib
** For President Office & secretary floors in the
Upper 37
2
∵ left
Area part : * 12 m
= 7.5
∴ Use One way Hollow blocks system .
Take Blocks = ( 200*400*250) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m

WRIB=(1.4(0.07*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.25*1*25) +
1.4*0.2*5
= 6.95 KN/m.s = 0.695 T/m.s
2

+Ve moment = W*L /8 = 4.63 T.m


0.695 T/m`

7.30 ((m))

4.63 T.m

Take d= 320-30 = 290 mm

d = c1 46.3*106 ∴c1 = 4.76


25*500
j = 0.824
6
MU.L* 10
∴ 2
360 * 290 * 0.824
As = =544.03 mm
∴As = 2 20 / rib
First floor ceiling
38

4- Lower left part


The Lower left part consists of :

1- Flat slab 26cm .


2- Girders system with section (40*90) and secondary beams
(25*60) with spacing 2.65 m.
3- Solid slabs 16cm and 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 700 1060
Allow =250 250
= = 2.8 cm , 250=
Allow = 4.24 cm

= 2.15 cm For flat slab ,


Max Max = 1.60 cm For Girders
system.
4- Lower left part 39

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
4- Lower left part 40

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
41
** For the Two AUDITORIUMS On the lower left
part :
∵ Each Auditorium span = 10. 6m
∴ Use Girders system . Live load from
Egyptian code for
loads
Ws U.L= 1.4(0.12*2.5+0.2)+1.6*0.4
2 2
=1.34 t /m= 13.4 KN/m
2 2
+Ve moment = W*L /10 = 0.134*L 1T.m

Assume using RFT 5 10 /m 1.34 T/m`


2
∴ As = 392.7 mm L ((m))
6
MU.L* 10
∴ As = =392.7mm
2
360 * 100 * 0.826

∴MU.L = 11.67KN.m = 1.167 T.m2 2


0.134*L T.m

∴ From 1 &2

∴0.134 * L 2 = 1.167 T.m


∴ Max spacing between sec beams = 2.95m

∴ Take 4 spacings each = 2.65m (Resisting by 5 10 /m


Design of sec beams
42
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m

For External beams :


2.65
2
∴We = 5.25 + 12.2 * = 21.4 KN/m`
2.14 T/m` 2.14 T/m`

4.5 ((m)) 7.2 ((m))

5.42 T.m 13.87 T.m

2
∴As = 331.4 mm2 ∴As = 886.72 mm
∴As = 5 10 ∴As = 5 16
`
For internal beams :

∴We = 2.65
5.25 + 2*12.22* =
37.6 KN/m`
3.76 T/m` 3.76 T/m`

4.5 ((m)) 7.2 ((m))

9.52 T.m 24.37 T.m

∴As = 588.5 mm2 ∴As = 1716.61 mm2


∴As = 6 12 ∴As = 6 20
Design of girders : 43
2 2
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m For internal beams :
For External beams2.65 : 2.65
∴We = 5.25 + 2*12.2 * =
2 2
∴We = 5.25 + 12.2 * 37.6
= 21.4 KN/m`
KN/m`
∴ Rext. =21.4 * 6.5 = 139.1 KN ∴ Rint. =37.6 * 6.5 = 244.3 KN
2 2

∵ O.W of Girder = 1.4*0.4*0.9*2.5 = 1.26 t/m = 12.6


KN/m
12.6 KN/m`

10.6 ((m)) 10.6 ((m))


3 2 1

382.68 KN.m 1020.5 KN.m 382.68 KN.m

3
834.94 KN.m 1
834.94 KN.m
2
Sec 1-1 Sec 2-2
Take d= 900-50 = 850 mm Take d= 900-50 = 850 mm

d = c1 1020.5*106 ∴c1 = 2.66 d = c1 834.94*106∴ 1 c = 2.94


25*400 25*400
6
j = 0.700 j = 0.736
MU.L* 10 6
∴ 2
∴ =
As
MU.L* 10
=
2
3707 mm
360 * 850 * 0.700 360 * 850 * 0.736

∴AAss== 10 25
=4764.3 mm
∴As = 8 25

Sec 3-3
∴ As = 5 20
Second floor ceiling
44

1- Right part
The Right part consists of :

1- Flat inclined slab 26cm .


2- Solid slabs 16cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 847
Allow =250 =
250 = 3.39 cm .

Max = 2.65 cm For flat slab .


1- Right part 45

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
1- Right part 46

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
Second floor ceiling
47

2- Middle part
The Middle part consists of :

1- Flat inclined slab 26cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 820
Allow =250 =
250 = 3.28 cm .

Max = 3.25 cm For flat slab ,.


2- Middle part 48

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
2- Middle part 49

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 16/m in both directions T&B
Second floor ceiling
50

3- Upper left part


The Upper left part consists of :

1- Flat slab 26cm .


2- Ribs system with ribs (10*40) with spacing 70cm and slab
7cm.
3- One way Hollow block With blocks (200*400*250).
4- Solid slab 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 925
Allow =250 =
250 = 3.7 cm

= 3.6 cm For flat slab ,


Max Max = 3.45 cm For Ribs
system.
3- Upper left part 51

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
3- Upper left part 52

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
** For Admin floors in the Upper left part : 53
∵ spans = 5.9m & 9.8 m
∴ Use Ribs system .
Take Ribs depth = 9.8/25= 0.4m
∴ Take ribs (10*40) with spacing 70 cm & slab 7 cm
.

WRIB= (1.4(0.07*2.5+0.15+1.6*0.3)*0.8*1 +1.4(0.1*0.4*1*2.5)


= 0.888 t /m.s
2 2

+Ve moment = W*L /8 = 0.1110*L T.m


0.888 T/m` 0.888 T/m`

5.9 ((m)) 9.8 ((m))

3.86 T.m 8.53 T.m

Take d= 400-30 = 370 mm Take d= 400-30 = 370 mm

d = c1 38.6*106 ∴c1 = 9.41 d = c1 85.3*106 ∴c1 = 6.33


25*1000 25*1000
j = 0.826 j = 0.826
6 6
MU.L* 10 MU.L* 10
∴ 2
∴ =
As
2
=775.3 m
360 * 370 * 0.826 360 * 370 * 0.826
As = =350.80 mm
∴As = 2 16 / rib ∴As = 2 25 / rib
** For Office floors in the Upper left part : 54
2
∵ Area = 7.5 * 12 m
∴ Use One way Hollow blocks system .
Take Blocks = ( 200*400*250) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m

WRIB=(1.4(0.07*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.25*1*25) +
1.4*0.2*5
= 6.95 KN/m.s = 0.695 T/m.s
2

+Ve moment = W*L /8 = 4.63 T.m


0.695 T/m`

7.30 ((m))

4.63 T.m

Take d= 320-30 = 290 mm

d = c1 46.3*106 ∴c1 = 4.76


25*500
j = 0.824
6
MU.L* 10
∴ 2
360 * 290 * 0.824
As = =544.03 mm
∴As = 2 20 / rib
Second floor ceiling
55

4- Lower left part


The Lower left part consists of :

1- Flat slab 26cm .


2- Girders system with section (40*90) and secondary beams
(25*60) with spacing 2.65 m.
3- Solid slabs 16cm and 10 cm.

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L
Where As` = As As
LMax 700 1060
Allow =250 250
= = 2.8 cm , 250=
Allow = 4.24 cm

= 2.15 cm For flat slab ,


Max Max = 1.60 cm For Girders
system.
4- Lower left part 56

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
4- Lower left part 57

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 6 12/m in both directions T&B
58
** For the Two AUDITORIUMS On the lower left
part :
∵ Each Auditorium span = 10. 6m
∴ Use Girders system . Live load from
Egyptian code for
loads
Ws U.L= 1.4(0.12*2.5+0.2)+1.6*0.4
2 2
=1.34 t /m= 13.4 KN/m
2 2
+Ve moment = W*L /10 = 0.134*L 1T.m

Assume using RFT 5 10 /m 1.34 T/m`


2
∴ As = 392.7 mm L ((m))
6
MU.L* 10
∴ As = =392.7mm
2
360 * 100 * 0.826

∴MU.L = 11.67KN.m = 1.167 T.m2 2


0.134*L T.m

∴ From 1 &2

∴0.134 * L 2 = 1.167 T.m


∴ Max spacing between sec beams = 2.95m

∴ Take 4 spacings each = 2.65m (Resisting by 5 10 /m


Design of sec beams
59
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m

For External beams :


2.65
2
∴We = 5.25 + 12.2 * = 21.4 KN/m`
2.14 T/m` 2.14 T/m`

4.5 ((m)) 7.2 ((m))

5.42 T.m 13.87 T.m

2
∴As = 331.4 mm2 ∴As = 886.72 mm
∴As = 5 10 ∴As = 5 16
`
For internal beams :

∴We = 2.65
5.25 + 2*12.22* =
37.6 KN/m`
3.76 T/m` 3.76 T/m`

4.5 ((m)) 7.2 ((m))

9.52 T.m 24.37 T.m

∴As = 588.5 mm2 ∴As = 1716.61 mm2


∴As = 6 12 ∴As = 6 20
Design of girders : 60
2 2
∵ O.W of beams = 1.4*0.25*0.60*2.5 = 0.525 t/m = 5.25
KN/m For internal beams :
For External beams2.65 : 2.65
∴We = 5.25 + 2*12.2 * =
2 2
∴We = 5.25 + 12.2 * 37.6
= 21.4 KN/m`
KN/m`
∴ Rext. =21.4 * 6.5 = 139.1 KN ∴ Rint. =37.6 * 6.5 = 244.3 KN
2 2

∵ O.W of Girder = 1.4*0.4*0.9*2.5 = 1.26 t/m = 12.6


KN/m
12.6 KN/m`

10.6 ((m)) 10.6 ((m))


3 2 1

382.68 KN.m 1020.5 KN.m 382.68 KN.m

3
834.94 KN.m 1
834.94 KN.m
2
Sec 1-1 Sec 2-2
Take d= 900-50 = 850 mm Take d= 900-50 = 850 mm

d = c1 1020.5*106 ∴c1 = 2.66 d = c1 834.94*106∴ 1 c = 2.94


25*400 25*400
6
j = 0.700 j = 0.736
MU.L* 10 6
∴ 2
∴ =
As
MU.L* 10
=
2
3707 mm
360 * 850 * 0.700 360 * 850 * 0.736

∴AAss== 10 25
=4764.3 mm
∴As = 8 25

Sec 3-3
∴ As = 5 20
Roof ceiling
61

*The Roof consists of 2 parts (Right part and


left part) .

Right part
Left part
Roof ceiling
62

1- Right part
The Right part consists of :

1- Flat inclined slab 22cm .


2- Two way Hollow block with blocks (200*400*250) with slab
7 cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L Where
As` = As As
LMax 520 750
Allow =250 =
250 = 2.08 cm , 250=
Allow = 3.00 cm

Max = 1.46 cm For flat slab . Allow = 1.77 cm For two way
H.B
1- Right part 63

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B
1- Right part 64

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B
** For Office floors in the Upper left part : 65
2
∵ Area = 7.5 * 8 m
∴ Use Two way Hollow blocks system .
Take Blocks = ( 200*400*250) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m
4S –
2b
WRIB=(1.4(0.07*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.25*1.8*25) +
1.4*0.2*4
= 7.37 KN/m.s = 0.737 T/2S*S = 0.737 T/m.s
2 * (e/a)
m*L 1*8
r= m` * Ls
= 0.87 * 7.5 = 1.226

sing MACRUS :
α = 0.54 & β = 0.26 2
β = 0.26

α = 0.54

1 1

2
66

Strip 1 Strip 2
0.54*0.737 = 0.4 T/m` 0.26*0.737 = 0.19 T/m`

7.50 ((m)) 8.00 ((m))

2.813 T.m 1.34 T.m


Take d= 320-30 = 290 mm Take d= 320-30 = 290 mm

d = c1 28.13*106 ∴ 1c = 6.11 d = c1 13.4*106 ∴c1 = 8.86


25*500 25*500
j = 0.826 j = 0.826
6 6
MU.L* 10 MU.L* 10
∴s =
A 2

A
= 326.2 mm / rib s= 2
= 155.4 mm / r
360 * 290 * 0.826 360 * 290 * 0.826

∴As = 2 16 / rib ∴As = 2 12 / rib


Roof ceiling
67

2- Left part
The Left part consists of :

1- Flat inclined slab 18 cm .

1- Deflection :
*Long term deflection equation :
As`
Equation = (2 – 0.2 * )*D.L + L.L = 1.8 D.L + L.L Where
As` = As As
LMax 525
Allow =250 =
250 = 2.10 cm .

Max = 1.74 cm For flat slab .


2- Left part 68

2- M1-1 For Lower Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B

3- M2-2 For Lower Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B
2- Left part 69

4- M1-1 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B

5- M2-2 For Upper Additional RFT :


Flat slab mesh is taken 5 12/m in both directions T&B
Beams
70
anual calculation for some beams:

Manual Beam 1 :
Ws U.L Flat slab = 1.4(0.26*2.5 + 0.15) + 1.6*0.3 = 1.6 t/m
WS U.L Flat slab = 1.4(0.16*2.5 + 0.15) + 1.6*0.3 = 1.25 t/m

Loads on beam = 1.6* 3.8 + 1.25*2 + 1.4*2.1 +


1.4*0.3*0.7*2.5
= 12.25 t /m`= 122.5 KN/m`

+Ve moment =6 W*L /8 = 588.61 KN.m


81.9*10
∴ 25*300 122.5 KN/m`
650=C1
∴ 6.20 m
C1 = 5.08
J = .826 6
588.61*10
∴ 360 * 650 * 0.826
2

As = B8 =3045 mm
As =9 22 (30*80) 588.61 KN.m
Beams
71
anual calculation for some beams:

Manual Beam 2 :
Ws U.L Flat slab = 1.4(0.22*2.5 + 0.15) + 1.6*0.3 = 1.46 t/m

Loads on beam = 1.46* 1.35 + 1.4*2.1 +


1.4*0.3*0.7*2.5
= 5.65 t /m`= 56.5 KN/m`

+Ve moment = W*L /11 = 223.74 KN.m


6
223.74*10
∴ 25*300 246.114 KN/m`
650=C1
∴ 6.60 m
C1 = 3.59
J = 0.794 6
223.74*10 2

As =360 * 650 * 0.794
B2 =1204 mm
As =6 16 (30*70) 588.61 KN.m
Beams
anual calculation for some beams:
72

Cantilever beam :

Assume that the RFT Of cantilever will extend into the beam as
stirrups , then check the stirrups for shear and torsion .

qcu =
0.24
2.50
= 0.98 N/mm
2

1.50
q = 2.50 2
700

0.06 = 0.245 N/mm


t min 1.50
q = 0.70
2.50
= 2.85 N/mm
2
9 12 From
U Max 1.50
design of
WsU.L cant. slab= 1.4(0.28*2.5 + 1.5) + slab
1.6*2
300
= 15.102 KN/m`
15.1 * 2.8
15.10 KN/m`
MU.L = mt = 2 =
59.19 KN/m`
59.19KN.m/m`
2.80 m
59.19KN.m/m`

MT = 201.25 KN.m
201.25
6.80 m

T.M.D
201.25 R = 42.28 kn
73
W due to shear = R + O.W of beam
= 42. 28 + 1.4*0.3*0.7*25 = 49.63 KN/m`

49.19 KN/m`

6.80 m
168.74

S.F.D
168.74

2
A o = 220 * 620 = 136400 mm
h
2
A = 0.85 * 220 * 620 = 115940 mm
620

P h
= 220 * 2 + 620 * 2 = 1680 mm
Ao h
t e= = 81.19 mm
Ph
220

3
q=u Q 168.74 * 10 2
b * d= 300*650 = 0.865 N/mm
6
q Mtu 201.75 * 10 2
=tu 2 Ao t=
e 2 * 115940 *81.19
= 10.71 N/mm

∴ qu2+qtu2 = 10.75 N/mm >qU Max


2
∴ Increase dimensions

Take beam 500 * 1000


74
2
A = 420 * 920 = 386400 mm
oh
2
A o = 0.85 * 420 * 920 = 309120 mm

P = 420 * 2 + 920 * 2 = 2680 mm

920
h
Ao h 2
t e= = 144.18 N/mm
Ph

3
q
=u
Q 168.74 * 10 2
b * d= 500*950
= 0.375 N/mm
420
6
q Mtu 201.25 * 10 2
=tu 2 A o t=
e 2 * 309120 *144.18
= 2.257 N/mm

∴ qu2+qtu2 = 2.289 N/mm <qU Max


2

q cu >qu
2
= 0.98 N/mm

q= 0.245 N/mm
2
<qtu ∴ Use RFT to resistqtu
t min

6
Astr Mtu * S 201.25 * 10 * St
= =
Fy 1.7 * 309120 *360
= 0.979 * St 2mm
1.7*Ao* 1.15
Ys

∵ RFT 9 bars per meter .


∴ Bars act as stirrups each 111.11 mm
2 2
A=
str
0.979 * 111.11 = 108.78 mm < 113 mm Safe
Beams
Ground ceiling beams :
75

1- Right part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
Ground ceiling beams :
76

2- Middle part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
Ground ceiling beams :
77

3- Upper left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
Ground ceiling beams :
78

4- Lower left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
irst floor ceiling beams :
79

1- Right part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
irst floor ceiling beams :
80

2- Middle part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
irst floor ceiling beams :
81

3- Upper left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
irst floor ceiling beams :
82

4- Lower left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
econd floor ceiling beams :
83

1- Right part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
econd floor ceiling beams :
84

2- Middle part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
econd floor ceiling beams :
85

3- Upper left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
econd floor ceiling beams :
86

4- Lower left part :


Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
Roof floor ceiling beams :
87

1- Right part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Beams
Roof floor ceiling beams :
88

2- Left part :
Moment values of beams in Hz direction :

Moment values of beams in VL direction :


Columns
89

** There are 9 models of columns as the shown


table :
Columns
90
1- Right part :
*Columns of Ground floor

*Columns of First floor :


Columns
91
1- Right part :
*Columns of Second floor

*Columns of Roof floor :


Columns
2- Middle part : 92
*Columns of Ground floor

*Columns of First floor :


Columns
93
2- Middle part :
*Columns of Second floor
Columns
94

3- Upper left part :


*Columns of Ground, first and second floor :
Columns
95
4- Lower left part :
*Columns of Ground floor

*Columns of First floor :


Columns
96
1- Lower left part :
*Columns of Second floor

*Columns of Roof floor :


Columns
97

** Columns of Right part :


Columns
98

**Columns of Middle part :


Columns
99

**Columns of Upper left part :


Columns
100

*Columns of Lower left part :


Stairs
anual calculation for RFT of stairs
10
1

Stair 1

Design of stair 1:

Strip1 : 1.67 t/m`


`
t/m
1.
86 ts = Ltotal/25 = 6.57/25
4
1.67 t/m` o
3.
7
= 0.28m = 28cm
26.56
ts avg.= ts + 7cm = 35cm

1.55 3.10 1.55


5.815 t

2
Ws h= 1.4(0.28*2.5 + 0.15) + 1.6*0.3 = 1.67 t/m
o 2
Ws i= 1.4(0.35*2.5 + 0.15) + 1.6*0.3*Cos 26.56 =
1.86 t/m
∴c1 = 4.22
6
95.0*10
∴ 25*1000
260 = c1 j = 0.81
6
7 m.t
95.00 *10 2
∴ =
As
360 * 650 * 0.81
= 1253.03 mm/m`
.t
m
50
9.
∴As = 7 16/m` 7 m.t
Design of stair 1:
10
Strip 2 : 1.67 t/m`2

∴c1 = 9.2
6
20.0*10
∴ 260 = c1 25*1000 1.55 m
j = 0.826
6
20.00 *10 2 2 t.m/m`

As = 260 * 360 * 0.826
= 258.7 mm/m`

∴As = 5 10/m`
2.59 t
Loads on Vertical beam :
6.55 t/m` 6.55 t/m`
3.325 t/m`

1.325 0.265 1.325

B.M.D

6.28 mt
2.00 m.t/m`

0.265 mt

T.M.D
0.265 mt
6.55 t/m` 6.55 t/m`
3.325 t/m`

9.12 ton

S.F.D
9.12 ton
103
Cantilever beam :

Assume that the RFT Of cantilever will extend into the beam as
stirrups , then check the stirrups for shear and torsion .

qcu =
0.24
2.50
= 0.98 N/mm
2

1.50
q = 2.50 2

700
0.06 = 0.245 N/mm
t min 1.50
q = 0.70
2.50
= 2.85 N/mm
2
5 12 From
U Max 1.50
design of
slab

2 300
A o = 220 * 620 = 136400 mm
h
2
A o = 0.85 * 220 * 620 = 115940 mm
P h
= 220 * 2 + 620 * 2 = 1680 mm
Ao h
t e= = 81.19 mm
Ph

3
q
=u
Q 91.2 * 10 2
b * d= = 0.467 N/mm
620

300*650
6
q Mtu 2.65 * 10 2
=tu 2 Ao t=
e 2 * 115940 *81.19
= 0.141 N/mm
220

∴ qu2+qtu2 = 0.488 N/mm <qU Max


2

∵ qtu < qt Min ∴5 10/m` From design of


slab as RFT to resist torsion of
∵ qu < qCU beam at strip 2 area.
Stri 1 104
p

Stri 2

p
700

5 10/m`
From design of
slab

300
Stairs
anual calculation for RFT of stairs
10
1
5
2

Design of stair 2: 1

Stair 2

Strip1 : 1.39 t/m`


`
t/m
1.
58 ts = Ltotal/25 = 4.76/25
1
1.39 t/m` o
2.
1
= 0.20m = 20cm
26.56
ts avg.= ts + 7cm = 27cm

1.325 1.90 1.325


3.505 t

2
Ws h= 1.4(0.20*2.5 + 0.15) + 1.6*0.3 = 1.39 t/m
o 2
Ws i= 1.4(0.20*2.5 + 0.15) + 1.6*0.3*Cos 26.56 =
1.58 t/m
∴c1 = 4.38
6
42.2*10
∴ 25*1000
180 = c1 j = 0.815
6
3.42 m.t
42.20 *10 2
∴s =
A
360 * 650 * 0.815
= 800 mm/m`
.t
m
22
4.
∴As = 5 16/m` 3.42 m.t
Design of stair 2:
106
Strip 2 : 1.39 t/m`

∴c1 = 8.14
6
12.2*10
∴ 180 = c1 25*1000 1.325 m
j = 0.826
6
1.22 t.m/m`
12.20 *10 2

As = 180 * 360 * 0.826
= 227.9 mm/m`

∴As = 5 10/m`
1.84 t

Loads on Vertical beam :


4.24 t/m` 4.24 t/m`
2.575 t/m`

1.535 0.925 1.535

B.M.D

6.39 mt
1.22 m.t/m`

0.564 mt

T.M.D
0.564 mt
4.24 t/m` 4.24 t/m`
2.575 t/m`

7.70 ton

S.F.D
7.70 ton
107
Cantilever beam :

Assume that the RFT Of cantilever will extend into the beam as
stirrups , then check the stirrups for shear and torsion .

qcu =
0.24
2.50
= 0.98 N/mm
2

1.50
q = 2.50 2

700
0.06 = 0.245 N/mm
t min 1.50
q = 0.70
2.50
= 2.85 N/mm
2
5 10/m`
U Max 1.50
From design of
slab

2 300
A o = 220 * 620 = 136400 mm
h
2
A o = 0.85 * 220 * 620 = 115940 mm
P h
= 220 * 2 + 620 * 2 = 1680 mm
Ao h
t e= = 81.19 mm
Ph

3
q
=u
Q 77.00* 10 2
b * d= = 0.395 N/mm
620

300*650
6
q Mtu 5.64 * 10 2
=tu 2 Ao t=
e 2 * 115940 *81.19
= 0.299 N/mm
220

∴ qu2+qtu2 = 0.495 N/mm <qU Max


2

∵ qtu > qt Min ∴5 10/m` From design of


slab as RFT to resist torsion of
∵ qu < qCU beam at strip 2 area.
*** Check RFT Of cantilever slab
108
That will extend through the beam
to resist torsion :
700

5 10/m`
From design of
slab

300

Stri 2

p
6
Astr Mtu * S 5.60 * 10 * St
= = = 0.0771 * St 2 mm
1.7*A *Fy
o
1.7 * 136400 *360
1.15
Ys

∵ RFT 5 bars per meter .


∴ Bars act as stirrups each 200 mm
2 2
Astr
= 0.0771 * 200 = 15.420 mm < 78.54 mm Safe
Stri 1 109
p

Stri 2

p
700

5 10/m`
From design of
slab

300
Stairs
anual calculation for RFT of stairs
110
1 2 1

Design of stair 3: 1 1

Stair 3
Strip1 : 1.60 t/m`
`
t/ m
84
5
ts = Ltotal/25 = 6.13/25
1. 1
1.60 t/m` o
3.
3
= 0.26m = 26cm
26.56
ts avg.= ts + 7cm = 33cm

1.50 2.80 1.50


5.29 t

2
Ws h= 1.4(0.26*2.5 + 0.15) + 1.6*0.3 = 1.60 t/m
o 2
Ws i= 1.4(0.20*2.5 + 0.15) + 1.6*0.3*Cos 26.56 =
1.845 t/m
∴c1 = 4.20
6
81.6*10
∴ 25*1000
240 = c1 j = 0.810
6
6.135 m.t
81.60 *10 2
∴ =
As
360 * 650 * 0.810
= 1165.99 mm/m`
.t
m
16
8.
∴As = 6 16/m` 6.135 m.t
Design of stair 3:
111
Strip 2 : 1.60 t/m`

∴c1 = 8.94
6
18.0*10
∴ 240 = c1 25*1000 1.50 m
j = 0.826
6
1.80 t.m/m`
18.00 *10 2
∴As = 240 * 360 * 0.826
= 252.2 mm/m`

∴As = 5 10/m`
2.40 t

Loads on Vertical beam :


6.025 t/m` 3.135 t/m` 6.025 t/m`

1.35 0.15 1.35

B.M.D

7.39 mt
1.80 m.t/m`

0.135 mt

T.M.D
0.135 mt
6.025 t/m` 6.025 t/m`
3.135 t/m`

8.37 ton

S.F.D
8.37 ton
112
Cantilever beam :

Assume that the RFT Of cantilever will extend into the beam as
stirrups , then check the stirrups for shear and torsion .

qcu =
0.24
2.50
= 0.98 N/mm
2

1.50
q = 2.50 2

700
0.06 = 0.245 N/mm
t min 1.50
q = 0.70
2.50
= 2.85 N/mm
2
5 10/m`
U Max 1.50
From design of
slab

2 300
A o = 220 * 620 = 136400 mm
h
2
A o = 0.85 * 220 * 620 = 115940 mm
P h
= 220 * 2 + 620 * 2 = 1680 mm
Ao h
t e= = 81.19 mm
Ph

3
q
=u
Q 83.70* 10 2
b * d= = 0.429 N/mm
620

300*650
6
q Mtu 1.35 * 10 2
=tu 2 Ao t=
e 2 * 115940 *81.19
= 0.072 N/mm
220

∴ qu2+qtu2 = 0.506 N/mm <qU Max


2

∵ qtu < qt Min ∴5 10/m` From design of


slab as RFT to resist torsion of
∵ qu < qCU beam at strip 2 area.
Stri 1 113
p

Stri 2

p
700

5 10/m`
From design of
slab

300
Stairs
anual calculation for RFT of stairs
114
2

1
1

Design of stair 4: Stair 4


2
Ws h= 1.4(0.16*2.5 + 0.15) + 1.6*0.3 = 1.25
t/m ts = Lc/10 = .15/10
= 0.16m = 16cm

Stri 1 Stri 2
p1.25 t/m` p t/m`
1.25

1.35 m 1.50 m

1.139 t.m/m` 1.41 t.m/m`

1.69 t 1.875 t
115
6 6
11.39*10 18.0*10
∴ 140 = c1 25*1000 ∴ 140 = c1 25*1000
∴c1 = 6.56 ∴c1 = 5.22
6 j = 0.826 6
j = 0.826
11.39 *10 14.1 *10
∴ As = 240 * 360 * 0.826 ∴ As = 240 * 360 * 0.826

∴As = 5 10/m` ∴As = 5 10/m`


1.41 m.t/m` 1.41 m.t/m`

2.56 mt 0.186 mt

0.186 mt
2.56 mt
6
q= Mtu 25.6 * 10
6
q= Mtu 1.86 * 10
tu 2 A o te=2 * 115940 *81.19 tu 2 A o te=2 * 115940 *81.19
2
= 1.156 N/mm >
2
qt Min = 0.084 N/mm < qt Min
6
A=str Mtu * S 25.6 * 10 * St
=
1.7*Ao*Fy 1.7 * 136400 *360
1.15
Ys

= 0.352 * St mm

∵ RFT 5 bars per meter .


∴ Bars act as stirrups each 200 mm
2
Astr
= 0.352 * 200 = 70.4 mm
2
< 78.54 mmSafe
Stri 1 116
p
700

5 10/m`
From design of
slab

300

Stri 2

p
700

5 10/m`
From design of
slab

300
Check buckling of columns :
1- Lower left part columns : 117

External column :
70
In plane 70

Ho = 3.85 – 0.7 = 3.15 m


40
For Upper part :
tb > t c (Case 1) C1 (30*40)

For Lower part :


tb > t c Foundation (Case 1)
,
∴k = 0.75
0.75 * 3.15
∴λ= = 5.9 < 10 (Short column) .
0.4

Out of plane 70 70

H = 3.85 – 0.7 = 3.15 m


For Upper part : 30

tb > t c (Case 1)

For Lower part :


tb > t c , Foundation (Case 1)
∴k = 0.75
0.75 * 3.15
∴λ= = 7.88 < 10 (Short column) .
0.3
Check buckling of columns :
1- Lower left part columns : 118

Internal column :
In plane 70

Ho = 3.85 – 0.7 = 3.15 m


40
For Upper part :
tS < t c (Case 2) C1 (30*40)

For Lower part :


tS < t C (Case 2)
∴k = 0.85
0.85 * 3.15
∴λ= = 6.69 < 10 (Short column) .
0.4

Out of plane 70

H = 3.85 – 0.7 = 3.15 m


For Upper part : 30

tb > t c (Case 1) C1 (30*40)


For Lower part :
tb > t c , Foundation (Case 1)
∴k = 0.75
0.85 * 3.15
∴λ= = 8.925 < 10 (Short column) .
0.3
Check punching :
1- Right part : 11
9

C1 (Corner column) :
3.35

qPcu =
0.316
25
= 1.29 N/mm
2
0.51

1.5
C1 (30*40)

qPu = Qpu

0.41

Ap 1.25

Qpu = 1.46* (3.35*1.25 – 0.51*0.41) = 5.808 ton


2
Ap = (0.51+0.41)*0.22 = 0.2024 m

∴q=Pu
5.808 2 2
0.2024
* 1.5= 43.04 t/m = 0.4304 N/mm q
<Pcu (Sa
120
C12 (Interior column) :

1.22
7.25
qPcu =
0.316
25 2
= 1.29 N/mm C12 (40*100)
1.5

qPu = Qpu

Ap 0.62

7.20

Qpu = 1.46* (7.2*7.25 – 0.62*1.22) = 75.07 ton


Ap = (2*0.62 + 2*1.22)*0.22 = 0.812 m
∴q=Pu
75.07 2
= 106.6 t/m = 1.066 N/mm q
2
* 1.15 < (Saf
0.81 Pcu

C8 (Edge column) :
0.72
5.30

qPcu =
0.316
25 2
= 1.29 N/mm C8
1.5 (30*50)

qPu = Qpu

Ap 0.41

3.90

Qpu = 1.46* (3.9*5.3 – 0.41*0.72) = 29.75 ton


Ap = (2*0.41 + 0.72)*0.22 = 0.392m

∴q=Pu
29.75 2
93.16 t/m = 0.932 N/mm q
2
* 1.30
= <Pcu (Saf
0.39
12
C17 (Interior column) : 1

1.22
4.00
qPcu =
0.316
25 2
= 1.29 N/mm C17 (30*100)
1.5

qPu = Qpu

Ap 0.52

14.00

Qpu = 1.46* (14*4 – 0.52*1.22) = 80.83 ton


Ap = (2*0.52 + 2*1.22)*0.22 = 0.7662 m
∴q=Pu 0.766 * 1.15= 121.3 t/m = 1.213 N/mm
80.83 2 2
q
<Pcu (Saf

C21 (Interior column) :


1.02
5.00

qPcu =
0.316
25 2
= 1.29 N/mm C21 (30*80)
1.5

qPu = Qpu

Ap 0.52

7.70

Qpu = 1.46* (7.70*5.50 – 0.52*1.02) = 61.06 ton


Ap = (2*0.52 + 2*1.02)*0.22 = 0.682 m
∴q=Pu
61.06 2
= 103.2 t/m = 1.032 N/mm q
2
* 1.15 < (Saf
0.68 Pcu
122
C26 (Interior column) :

0.92
3.50
qPcu =
0.316
25 2
= 1.29 N/mm C26 (30*70)
1.5

qPu = Qpu

Ap 0.52

15.50

Qpu = 1.46* (15.5*3.50 – 0.52*0.92) = 78.50 ton


Ap = (2*0.52 + 2*0.92)*0.22 = 0.6342 m
∴q=Pu
78.50 2
= 123.8 t/m = 1.238 N/mm q
2
* 1.15 < (Saf
0.634 Pcu

C30 (Interior column) :


0.62
5.50

qPcu =
0.316
25 2
= 1.29 N/mm C30 (30*40)
1.5

qPu = Qpu

Ap 0.52

4.20

Qpu = 1.46* (4.20*5.00 – 0.52*0.62) = 30.19 ton


Ap = (2*0.52 + 2*0.62)*0.22 = 0.502 m
∴q=Pu
30.19 2
= 69.43 t/m = 0.694 N/mm q
2
* 1.15 < (Saf
0.50 Pcu
123
C31 (Interior column) :

1.02
6.40
qPcu =
0.316
25 2
= 1.29 N/mm C31 (30*80)
1.5

qPu = Qpu

Ap 0.52

6.25

Qpu = 1.46* (6.40*6.25 – 0.52*1.02) = 57.63 ton


Ap = (2*0.52 + 2*1.02)*0.22 = 0.6782 m
∴q=Pu
57.63 2
= 97.75 t/m = 0.978 N/mm q
2
* 1.15 < (Saf
0.678 Pcu

C32 (Interior column) :


1.22
6.40

qPcu =
0.316
25 2
= 1.29 N/mm C32 (30*100)
1.5

qPu = Qpu

Ap 0.52

7.30

Qpu = 1.46* (7.30*6.40 – 0.52*1.22) = 67.29 ton


Ap = (2*0.52 + 2*1.22)*0.22 = 0.7662 m
∴q=Pu
67.29 2
= 101.0 t/m = 1.010 N/mm q
2
* 1.15 < (Saf
0.766 Pcu
12
C33 (Interior column) : 4

1.22
4.75
qPcu =
0.316
25 2
= 1.29 N/mm C33 (30*100)
1.5

qPu = Qpu

Ap 0.52

17.00

Qpu = 1.46* (17.00*4.75 – 0.62*1.42) = 116.61 ton


Ap = (2*0.62 + 2*1.42)*0.22 = 0.8982 m
∴q=
116.61 2
Pu 0.634
2
* 1.15= 211.5 t/m = 2.115 N/mm > q Pcu (Uns

y to use Drop panel & Take column 40*120 .


3.00

t d= t s / 2 =
Take 0.12 m

Take
Width of drop panel 3*3 m
1.51
4.75

3.00

C33 (40*120)

0.71

2 17.00
Ws U.L = 1.4(0.25*2.5 + 0.4) + 1.6*0.3 = 1.915 t/m
d= 0.22+0.12-.03= 0.31 m

Qpu = 1.915* (17.00*4.75 – 0.71*1.51) = 152.58 ton


Ap = (2*0.71 + 2*1.51)*0.31 = 1.3772 m
∴q=Pu
152.58 2
= 127.43 t/m = 1.27 N/mm q
2
* 1.15 < (Saf
1.377 Pcu
Check punching :
2- Middle part : 12
5

C41,42 (Interior column) :


0.54
3.50

qPcu =
0.316
25 2
= 1.29 N/mm C41,42 (30*40)
1.5

qPu = Qpu

Ap 0.64

5.95

Qpu = 1.95 * (5.95*3.50 – 0.64*0.54) = 39.94 ton


Ap = (2*0.54 + 2*0.64)*0.24 = 0.5662 m
∴q=Pu
39.94 2
= 81.15 t/m = 0.812 N/mm q
2
* 1.15 < (Saf
0.566 Pcu
126
C43,44 (Interior column) :

1.24
3.40
qPcu =
0.316
25 2
= 1.29 N/mm C43,44 (40*100)
1.5

qPu = Qpu

Ap 0.64

7.70

Qpu = 1.95* (7.70*3.40 – 0.64*1.24) = 49.50 ton


Ap = (2*0.64 + 2*1.24)*0.24 = 0.9022 m
∴q=Pu
49.50 2
= 63.11 t/m = 0.631 N/mm q
2
* 1.15 < (Saf
0.902 Pcu

C47,48 (Interior column) :


0.64
3.80

qPcu =
0.316
25 2
= 1.29 N/mm C47,48 (30*40)
1.5

qPu = Qpu

Ap 0.54

7.50

Qpu = 1.95* (7.50*3.80 – 0.54*0.64) = 54.9 ton


Ap = (2*0.54 + 2*0.64)*0.24 = 0.5662 m
∴q=Pu
54.90 2
= 111.5 t/m = 1.115 N/mm q
2
* 1.15 < (Saf
0.566 Pcu
127
C51,52 (Interior column) :

0.74
3.30
qPcu =
0.316
25 2
= 1.29 N/mm C51,52 (30*50)
1.5

qPu = Qpu

Ap 0.54

7.50

Qpu = 1.95* (7.50*3.30 – 0.54*0.74) = 47.48 ton


Ap = (2*0.54 + 2*0.74)*0.24 = 0.6142 m
∴q=Pu
47.48 2
= 88.93 t/m = 0.889 N/mm q
2
* 1.15 < (Saf
0.614 Pcu

C53,54 (Interior column) :


0.64
3.70

qPcu =
0.316
25 2
= 1.29 N/mm C53,54 (30*40)
1.5

qPu = Qpu

Ap 0.54

7.50

Qpu = 1.95* (7.50*3.70 – 0.54*0.64) = 53.44 ton


2
Ap = (2*0.54 + 2*0.64)*0.24 = 0.566 m
∴q=Pu
53.44 2
= 108.6 t/m = 1.086 N/mm q
2
* 1.15 < (Saf
0.566 Pcu
12
C57,58 (Interior column) : 8

0.64
4.40
qPcu =
0.316
25 2
= 1.29 N/mm C57,58 (30*40)
1.5

qPu = Qpu

Ap 0.54

7.40

Qpu = 1.95* (7.40*4.40 – 0.54*0.64) = 62.82 ton


2
Ap = (2*0.54+ 2*0.64)*0.24 = 0.5664 m
62.82
∴q=Pu
2
= 127.5 t/m = 1.275 N/mm q
2
0.5664 * 1.15 < Pcu (Saf

C61,62 (Interior column) :


1.24
4.85

qPcu =
0.316
25 2
= 1.29 N/mm C61,62 (40*120)
1.5

qPu = Qpu

Ap 0.54

11.70

Qpu = 1.95* (11.70*4.85 – 1.44*0.64) = 108.85 ton


Ap = (2*1.44 + 2*0.64)*0.24 = 0.9992 m
∴q=Pu
108.85 2
= 125.3 t/m = 1.253 N/mm q
2
* 1.15 < (Saf
0.999 Pcu
Check punching :
3- Upper left part : 12
9

C67 (Corner column) :


2.50

qPcu =
0.316
25 2
= 1.29 N/mm
0.42

1.5
C67 (30*40)

qPu = Qpu

0.52

Ap 2.40

Qpu = 1.95* (2.40*2.50 – 0.52*0.42) = 11.274 ton


2
Ap = (0.52+0.42)*0.24 = 0.2256 m

∴q=Pu
11.274 2 2
0.2256
* 1.5= 74.960 t/m = 0.749 N/mm q
<Pcu (Sa
Check punching :
4- Lower left part : 130

C107 (Corner column) :


3.20

qPcu =
0.316
25
= 1.29 N/mm
2
0.64

1.5
C107 (30*40)

qPu = Qpu

0.54

Ap 1.90

Qpu = 1.95* (3.20*1.90 – 0.54*0.64) = 11.182 ton


2
Ap = (0.54+0.64)*0.24 = 0.2832 m

∴q=Pu
11.182 2 2
0.2832
* 1.5= 59.23 t/m = 0.5923 N/mm q
<Pcu (Sa
131

C114 (Edge column) :

0.74
5.50
qPcu =
0.316
25 2
= 1.29 N/mm C114
1.5 (30*50)

qPu = Qpu

Ap 0.54

3.90

Qpu = 1.95* (5.50*3.90 – 0.64*0.54) = 41.048 ton


Ap = (2*0.54 + 0.74)*0.24 = 0.4372 m

∴q=Pu
41.048 2
122.1 t/m = 1.221 N/mm q
2
* 1.30
= <Pcu (Saf
0.437

C113 (Edge column) :


0.64
5.40

qPcu =
0.316
25 2
= 1.29 N/mm C113
1.5 (30*40)

qPu = Qpu

Ap 0.54

3.80

Qpu = 1.95* (3.80*5.40 – 0.64*0.54) = 39.34 ton


Ap = (2*0.54 + 0.64)*0.24 = 0.4132 m

∴q=Pu
39.34 2
123.8 t/m = 1.238 N/mm q
2
* 1.30
= <Pcu (Saf
0.413
13
C110 (Interior column) : 2

1.24
5.45
qPcu =
0.316
25 2
= 1.29 N/mm C110 (40*100)
1.5

qPu = Qpu

Ap 0.64

11.00

Qpu = 1.95* (11.00*5.45 – 0.64*1.24) = 76.03 ton


Ap = (2*0.64 + 2*1.24)*0.24 = 0.9022 m
∴q=Pu
76.03 2
= 96.93 t/m = 0.9693 N/mm q
2
* 1.15 < (Sa
0.902 Pcu

C118 (Interior column) :


1.24
5.15

qPcu =
0.316
25 2
= 1.29 N/mm C118 (30*100)
1.5

qPu = Qpu

Ap 0.54

8.40

Qpu = 1.95* (8.40*5.15 – 0.54*1.24) = 83.05 ton


Ap = (2*0.54 + 2*1.24)*0.24 = 0.852 m
∴q=Pu
83.05 2
= 112.3 t/m = 1.123 N/mm q
2
* 1.15 < (Saf
0.85 Pcu
133
C119 (Interior column) :

1.04
3.90
qPcu =
0.316
25 2
= 1.29 N/mm C119 (30*80)
1.5

qPu = Qpu

Ap 0.54

7.40

Qpu = 1.95* (7.40*3.90 – 0.54*1.04) = 55.182 ton


Ap = (2*0.54 + 2*1.04)*0.24 = 0.7582 m
∴q=Pu
55.182 2
= 83.72 t/m = 0.837N/mm q
2
* 1.15 < (Saf
0.758 Pcu

C122 (Interior column) :


0.54
5.10

qPcu =
0.316
25 2
= 1.29 N/mm C122 (30*120)
1.5

qPu = Qpu

Ap 1.24

10.50

Qpu = 1.95* (10.50*5.10 – 0.54*1.24) = 102.9 ton


2
Ap = (2*0.54 + 2*1.44)*0.24 = 0.9504 m
∴q=Pu
102.9 2
= 124.5 t/m = 0.125 N/mm q
2
* 1.15 < (Saf
0.9504 Pcu
134
C127 (Interior column) :

1.44
5.30
qPcu =
0.316
25 2
= 1.29 N/mm C127 (40*120)
1.5

qPu = Qpu

Ap 0.64

11.80

Qpu = 1.95* (11.8*5.3 – 0.64*1.44) = 120.15 ton


Ap = (2*0.64 + 2*1.44)*0.24 = 0.9992 m
120.15
∴q=
2
* 1.15= 138.31 t/m = 1.38 N/mm q
2
Pu 0.999 > Pcu (Uns

y to use Drop panel & Take column 40*120 .


3.00

t d= t s / 2 =
Take 0.12 m

Take
Width of drop panel 3*3 m
1.51
4.75

3.00

C33 (40*120)

0.71

2 17.00
Ws U.L = 1.4(0.28*2.5 + 0.4) + 1.6*0.3 = 2.020 t/m
d= 0.26+0.12-.03= 0.35 m

Qpu = 2.020* (11.80*5.30 – 0.75*1.55) = 123.98 ton


2
Ap = (2*0.75 + 2*1.55)*0.35 = 1.61 m
∴q=Pu
123.98 2
= 88.557 t/m = 0.89 N/mm q
2
* 1.15 < (Saf
1.61 Pcu
135
C135 (Interior column) :

1.44
6.70
qPcu =
0.316
25 2
= 1.29 N/mm C135 (30*120)
1.5

qPu = Qpu

Ap 0.54

7.20

Qpu = 1.95* (7.20*6.70 – 0.54*1.44) = 92.55 ton


Ap = (2*0.54 + 2*1.44)*0.24 = 0.9502 m
∴q=Pu
92.55 2
= 97.42 t/m = 0.974 N/mm q
2
* 1.15 < (Saf
0.950 Pcu

C136 (Interior column) :


0.94
6.70

qPcu =
0.316
25 2
= 1.29 N/mm C136 (30*70)
1.5

qPu = Qpu

Ap 0.54

4.60

Qpu = 1.95* (4.60*6.70 – 0.94*0.54) = 59.11 ton


Ap = (2*0.54 + 2*0.94)*0.24 = 0.7102 m
∴q=Pu
59.11 2
= 95.74 t/m = 0.957 N/mm q
2
* 1.15 < (Saf
0.710 Pcu
136
C137 (Interior column) :

0.74
2.50
qPcu =
0.316
25 2
= 1.29 N/mm C137 (30*50)
1.5

qPu = Qpu

Ap 0.54

3.60

Qpu = 1.95* (2.50*3.60 – 0.54*0.74) = 16.77 ton


Ap = (2*0.54 + 2*0.74)*0.24 = 0.6142 m
∴q=Pu
16.77 2
= 31.41 t/m = 31.41 N/mm q
2
* 1.15 < (Sa
0.614 Pcu
Design of
core : 137

The core subjected to normal force


only :

Total normal forces act on the core =450.31


ton
So use Isolate footing F9
Footings
Manual Design of 138
footing :
A- Manual calculations for Design isolated footing C7
(30*40) :
Data :
1- Area of footing :
Pw = 88 ton = 880 KN
AP.C P 2 tp.c = 40 cm
= 880
W
= = 4.4 m
qall 200 q all
= 200 KN/m
2

2
= Lp.c * Bp.c Fcu = 30 N/mm
2

∵ Lp.c – Bp.c = b – a = 0.4 – 0.3 = 0.1 m


Fy = 360 N/mm
2
∴ Bp.c * ( Bp.c + 0.1 ) = 4.40 m

Bp.c = 2.05 m BR.c = 1.25 m


Lp.c = 2.15 m Lp.c = 1.35 m

- Design of R.C footing :


A- Ultimate loads :
1320 2
q =
PULT = 880 * 1.5 = 1320 KN all 1.35 * 1.25
= 782.2 KN/m

B- Design of critical section due to B.M :


1.35-0.4
LC = 2
= 0.475 m

M
∴ ULT = 782.2 * 0.475 = 88.24 KN.m
∴ d=5
88,24*10
6
= 271.1 mm 139
30*1000

Take d = 380 mm t = 450 mm

C- Check shear :
qScu =
0. 16
30 2
= 0.7155 N/mm
1.5

Z= 0.475 - 0.38 = 0.285 m


2
Q = 782.22 * 0.285 = 222.93 KN
SU
3
∴q=u
2
222.93 * 10
380*1000
= 0.586 N/mmq <Scu (Safe)

D- Check Punching :
qPcu =
0. 316
30
= 1.414 N/mm
2
1.5

Z = 0.475 - 0.38 = 0.285 m


2
Q = 1320 – 782.22 * (0.68 * 0.78 = 905.11 KN
SU
3
∴q=Pu
2
905.11 * 10 = 0.816 N/mmq <Pcu (Safe)
380*2*(680+780)

E- Check Punching :
A =1.5 * 380 = 570 mm /m`
2
S Min Use 7 12/m`
6 In both
A = 88.240 * 10 2
= 780.91 mm / m`
S Req 360 * 0.826 * 380 directions
140
B- Excel sheet for Design isolated footing C7
(30*40) :

∴ Results from Manual calculations = Results from


Excel sheet
Footings
models :
F1 141
F 2 142
F 3 143
F 4 144
F 5 145
F 6 146
Footings
models :
F7 147
Footings
models :
F8 148
Footings
models :
F9 14
9
Footings
models :
F 10 150
esign of footings at expansion joints :
151

Ult load = 273.70 t Ult load = 289.90 t


Work. Load = 182.46 t Work. Load = 193.27 t

Ult load = 311.10 t Ult load = 319.30 t


Work. Load = 207.39 t Work. Load = 212.87 t

Ult load = 278.48 t Ult load = 293.55 t


Work. Load = 185.65 t Work. Load = 195.70 t

Ult load = 325.64 t Ult load = 261.75 t


Work. Load = 217.10 t Work. Load = 179.50 t

Ult load = 76.23 t Ult load = 178.19 t


Work. Load = 50.70 t Work. Load = 118.79 t

Ult load = 93.00 Ult load = 588.6 Ult load =


t t 203.89 t
Work. Load = Work. Load = Work. Load =
62.00 t 392.4 t 135.9 t
Ult load = 461.9 Ult load = 656.7
t t
Work. Load = Work. Load =
152

C C C C
(50*60) (70*60) (80*60) (120*60)

Pw = 50.8 t Pw = 185.65 t Pw = 182.46 t Pw = 392.4 t


= 62.0 t = 195.70 t = 193.27 t = 437.8 t
= 207.39 t
F11 = 212.87 t F14 F16
= 217.10 t
F13

Pw = 118.8 t Pw = 307.93 t
= 135.9 t F15
= 179.5 t
F12
Footings
models :
F 11 153
Footings
models :
F 12 154
Footings
models :
F 13 155
Footings
models :
F 14 15
6
Footings
models :
F 15 15
7
Footings
models :
F 16 158
15
9

Table of isolated
footings :
Project 2 160

7.50 m
7.50 m
7.50 m
B3 B3
B2 B1 & & B1 B2
B2 B2 7.50 m

6.50 m 6.50 m 4.00 m 6.50 m 6.50 m

30.00 m
161
Design of slabs :

**Use slabs one way Hollow block


slab 2
∵ Area = 7.5 * 6.5 & 7.5* 4.00 m
Take Blocks = ( 200*400*200) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m

WRIB=(1.4(0.05*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.20*1*25) +
1.4*0.15*5
= 6.10 KN/m.s = 0.610 T/m.s
Slab at lower level
1 1 2

34.31 KN.m

34.31 KN.m
1 1 2 28.59 KN.m

Sec 1-1 Sec 2-2


Take d= 250-30 = 220 mm Take d= 250-30 = 220 mm

d = c1 34.31 *106 ∴c1 = 4.20 d = c1 28.59 *106 ∴c1 = 4.60


25*500 25*500
6
j = 0.810 6
j = 0.820
MU.L* 10 MU.L* 10
∴ 360 * 220 * 0.810
2
A∴
s =
360 * 220 * 0.820
=440.2 mm
2
/
As = =534.8 mm /rib
∴As = 2 20 / rib ∴As = 2 18 / rib
Slab at Upper 16
level 2
2
∵ Area = 7.5 * 4.00 m ∴ Use One way Hollow blocks 1
system .
2
Take Blocks = ( 200*400*250) & slab 7 cm
∴ S = e + b = 0.4 + 0.1 = 0.5m

WRIB=(1.4(0.05*25+1.5)+1.6*3)*0.5*1 +1.4(0.1*0.20*1*25) +
1.4*0.15*5
= 6.10 KN/m.s
2 = 0.610 T/m.s

+Ve moment = W*L /8 = 12.2 KN.m


6.10 KN/m`

4.00 ((m))

12.2 KN.m

Take d= 250-30 = 220 mm

d = c1 12.2*106 ∴c1 = 7.04


25*500 j = 0.826
6
MU.L* 10 2
∴ 360 * 220 * 0.826

∴AAss ==2 12 / rib =186.49 mm


Design of internal arch
girder
163
Design of beams :

Take O.W of beams = 5.00 KN/m`

For Lower slab beams :

B1 : B2 :
6.10 6.1
∴W = 5.00 + 6.500.5
* = 84.3 KN/m` ∴W = 5.00
0.5+ 3.25 *
= 44.65 KN/m`

∴Rint = 1.1 * 7.5 * 84.3 = 695.48 KN ∴Rext. = 1.1 * 7.5 * 44.65


= 368.36 KN

BFor
3 : Lower slab beams :

6.10
0.5
∴W = 5.00 + 2.00 * = 29.40 KN/m`
699.1 699.1
∴R= 1.1 * 7.5 * 29.4 = 242.55 KN 0 0

804.6 804.6

=Loads on arch girder : 8 8


242.55 + 368.36 + 16.8*5.25 = 699.1 KN
= 695.48 + 16.8*6.5 = 804.68 KN
= 368.36 + 16.8*3.25 = 422.96 KN 422.9
6
422.9
6

1926.7 1926.7
4 4
Design of Arch girder :
164

4.00 m
2.73 m

14318.72 KN.m
Mo = 14318.72 KN.m
P = T = 0.95 *14318.72
4.00
= 3400.7 KN
M = 0.05 Mo = 715.94 KN.m
ake t = L/20-25 = 1.20 m
715.94 KN.m

-
- 3400.7 KN
1
-

2
-

+
3400.7 KN
2
Sec 1-1 (Design of Arch girder) 16 :
ck
PU.L = 3400.7 *1000 5 neglect N
= 0.2834 > 0.004 (Don`t
FCU * b * t 25*400*1200
MU.L e 0.21
= 0.21 m
PU.L ∴ =
1.20 = 0.175 < 0.5 ∴U
t
1.20 - 0.2
= 1.20= 0.80 ∴Use I.D Eccs design Page (4-5)
3 3
PU.L* 10 3400.7 * 10
∴ = = 0.283
Fcu * b * t
6
25 * 400 * 1200
6
∴ ρ<1 ∴ Take ρ = 1
MU.L* 10 3400.7 * 10
=
Fcu * b * 2t 2
25 * 400 * 1200
= 0.0497

μ = ρ * Fcu * 10-4 -3
∴ = 2.5 * 10
As = As` = μ * b * t = 1200 mm2 ∴ As Total = 2400 mm2
As Min = 0.008 * b * t = 3840 mm2 ∴ As = As` = 1920 mm2 =6 22

ec 2-2 (Design of Tie 500*500) :


3
TU.L* 10 2
∴s =
A = 10861.1 mm
360 / 1.15

∴ As = 22 25

Design of Hanger 250*250) :


2
O.W = 1.4*0.25*0.25*25 = 2.2 KN/m

∴T= 2.20 + 695.48 = 697.7 KN


3
TU.L* 10
∴s =
A = 10861.1
2
mm
360 / 1.15
∴ As = 4 25
Design of column :
( Neglect effect of wind )
166

P = 1926.74 KN

Out of
In plane
plane
3.25 m

4.00 m
∴k = 2.20 ∴k = 1.20

∴ λ = 2.201.00
* 8.25
= 12.00 > 10 ∴ λ = 1.201.00
* 4.00
= 12.00 > 10
2

=18.15 * 1.00
∴ 2000
= 0.1647 m

Madd. = 1926.74 * 0.1647 = 317.33 KN


MU.L
= 0.1647 m ∴ e 0.1647
= = 0.164 < 0.5 ∴Us
PU.L t 1.00
1.00 – 0.1
= 1.00 = 0.90 ∴Use I.D Eccs design Page (4-4)
3 3
PU.L* 10 1926.74 * 10
= = 0.1926
Fcu * b * t
6
25 * 400 * 1000
6
∴ ρ<1 ∴ Take ρ = 1
MU.L* 10 3400.7 * 10
=
Fcu * b * 2t 2
25 * 400 * 1000
= 0.0317

μ = ρ * Fcu * 10-4 -3
∴ = 2.5 * 10
As = As` = μ * b * t = 1000 mm2 ∴ As Total = 2000 mm2
As Min = (0.0025+ 0.00052*18.15) * b * t = 4775 mm2
∴ As = As` = 2387 mm2 =5 22
Design of
footing :
167
Finternal
Design of External arch
girder
168
Design of beams :

Take O.W of beams = 5.00 KN/m`

For Lower slab beams :

B1 : B2 :
6.10 6.1
∴W = 5.00 + 6.500.5
* = 84.3 KN/m` ∴W = 5.00
0.5+ 3.25 *
= 44.65 KN/m`

∴Rint = 0.45 * 7.5 * 84.3 = 284.50 KN ∴Rext. = 0.45 * 7.5 *


44.65 = 150.70 KN

BFor
3 : Lower slab beams :

6.10
0.5
∴W = 5.00 + 2.00 * = 29.40 KN/m`
338.1 338.1
∴R= 0.45 * 7.5 * 29.4 = 99.23 KN 3 3

397.7 397.7

1 =Loads on arch girder


99.23 + 150.7 + 16.8*5.25 = 338.13 KN
:
2 = 284.5 + 16.8 *6.5 = 397.70 KN
3 = 150.70 * 16.80*3.25 = 205.3 KN 205.3 205.3

937.13 937.13
Design of Arch girder :
169

4.00 m
2.73 m

6954.74 KN.m
Mo = 6954.74 KN.m
P = T = 0.95 *6954.74
4.00
= 1651.75 KN
M = 0.05 Mo = 347.74 KN.m
ake t = L/20-25 = 1.20 m
347.74 KN.m

-
- 1651.75 KN
1
-

2
-

+
1651.75 KN
2
Sec 1-1 (Design of Arch girder) 17 :
ck
PU.L = 1651.75 *1000 0 neglect N
= 0.1376 > 0.004 (Don`t
FCU * b * t 25*400*1200
MU.L e 0.21
= 0.21 m
PU.L ∴ =1.20 = 0.175 < 0.5 ∴U
t
1.20 - 0.2
= 1.20= 0.80 ∴Use I.D Eccs design Page (4-5)
3 3
PU.L* 10 1651.75 * 10
= = 0.1376
Fcu * b * t
6
25 * 400 * 1200 ∴ ρ<1 ∴ Take ρ = 1
6
MU.L* 10 347.74 * 10
=
Fcu * b * 2t 2
25 * 400 * 1200
= 0.02415

μ = ρ * Fcu * 10-4 -3
∴ = 2.5 * 10
As = As` = μ * b * t = 1200 mm2 ∴ As Total = 2400 mm2
As Min = 0.008 * b * t = 3840 mm2 ∴ As = As` = 1920 mm2 =6 22

ec 2-2 (Design of Tie 500*500) :


3
TU.L* 10 2
∴s =
A = 5276.43 mm
360 / 1.15

∴ As = 12 25

Design of Hanger 250*250) :


2
O.W = 1.4*0.25*0.25*25 = 2.2 KN/m

∴T= 2.20 + 284.5 = 286.70 KN


3
TU.L* 10
∴s =
A = 915.850
2
mm
360 / 1.15
∴ As = 4 18
Design of column :
( Neglect effect of wind )
17
1
P = 937.13 KN

Out of
In plane
plane
3.25 m

4.00 m
∴k = 2.20 ∴k = 1.20

∴ λ = 2.201.00
* 8.25
= 12.00 > 10 ∴ λ = 1.201.00
* 4.00
= 12.00 > 10
2

=18.15 * 1.00
∴ 2000
= 0.1647 m

Madd. = 937.13 * 0.1647 = 154.345 KN


MU.L
= 0.1647 m ∴ e 0.1647
= = 0.164 < 0.5 ∴Us
PU.L t 1.00
1.00 – 0.1
= 1.00 = 0.90 ∴Use I.D Eccs design Page (4-4)
3 3
PU.L* 10 937.13 * 10
= = 0.0937
Fcu * b * t
6
25 * 400 * 1000
6
∴ ρ<1 ∴ Take ρ = 1
MU.L* 10 154.34 * 10
=
Fcu * b * 2t 2
25 * 400 * 1000
= 0.0154

μ = ρ * Fcu * 10-4 -3
∴ = 2.5 * 10
As = As` = μ * b * t = 1000 mm2 ∴ As Total = 2000 mm2
As Min = (0.0025+ 0.00052*18.15) * b * t = 4775 mm2
∴ As = As` = 2387 mm2 =5 22
Design of
footing :
172
FExternal