Plant Layout
Plant Layout
Plant Layout
• Ex hospital facilities
Sequence of Operations
Compactness of facilities
Safety
Optimum investment
Flexibility
Machines and Equipment ( material handling such as over head cranes, gravity
Location – size and terrain, mode of transportation used for raw materials and finished
goods, future expansion
Characteristics
• Work moves through process at fixed rate. Resources are
arranged in the order of machining requirements
• material handling equipment is designed for the line
• Work capacity of various work stations has to be synchronised
and work force at the optimum level of out put
Product Layout
An example
Product A
L D M G
Product B
L D L G
Product C
L D M L G
Manufacturing Process Layout ..example
Milling
Lathe Department Department Drilling Department
L L M M D D D D
L L M M D D D D
L L G G G P
L L G G G P
Receiving and
A A A
Shipping Assembly
Process Layout
An example
Product A
Product B L L L L D D
Product C D D
L L L L
D D
M M
G G G
M M
The sequence of visits is a function of the process and is
available on the routing card
Cell 1 Cell 2
L M D M D L
D L G G D L
L D L D
M L G L M
Cell 4 Cell 3
Layout Design
Performance Measures
Performance Measure Basis for measurement
Distance travelled by jobs in the Kg - Metres of job movement for
shopfloor each product
Minimum space required to actual
Space utilisation index
space utilised
Material Handling costs Rupees per month