0% found this document useful (0 votes)
111 views50 pages

Cluster Drive Report: Port-Harcourt - Obigbo

The document reports on a drive test done in the Obigbo cluster of Port Harcourt on February 14, 2017. It analyzes key performance indicators for 2G and makes observations and recommendations to improve network quality, noting an issue with delayed handover between two cells.

Uploaded by

Chika Albert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views50 pages

Cluster Drive Report: Port-Harcourt - Obigbo

The document reports on a drive test done in the Obigbo cluster of Port Harcourt on February 14, 2017. It analyzes key performance indicators for 2G and makes observations and recommendations to improve network quality, noting an issue with delayed handover between two cells.

Uploaded by

Chika Albert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 50

Cluster drive report

PORT-HARCOURT – OBIGBO

14TH FEBRUARY 2017

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 1 (5)


summary
› Region – PORT-HARCOURT
› Cluster Name – OBIGBO
› Drive test done – 14TH FEBRUARY, 2017
› DT Tool version - TEMs investigation11.0
› MS1 on 3G (Dedicated mode) – Medium Call
› MS2 on 2G (Dedicated mode) – Medium Call
› MS3 on IRAT
› MS4 on DATA

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 2 (5)


› KPIs Summary
› Observations & Recommendations
› Site distribution & Drive route

Gsm › Rx level & Rx quality plot


› SQI & SQI MOS plot
performance
› Cell ID plot
› Event failure plot & analysis
› Performance analysis

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 3 (5)


KPI’s summary
2G DEDICATED MODE

Drive Test KPI PRE POST KPIs Unit PRE POST


2G Call Setup Success Rate (Speech) 100.00 100.00 Call Initiation - 63 64
2G Block Call Rate (Speech) 0.00 0.00 Call Attempts - 63 64
2G Drop Call Rate (Speech) 1.59 0.00 Call Setup Success - 63 64
2G Handover Success Rate (Speech) 97.83 100.00 Call Setup Success rate % 100.00 100.00

2G Coverage Reliability (RxLev > -95dBm) 90.60 92.02 Blocked Calls - 0 0


2G Voice Quality (RxQual < 5) 97.27 98.53 Blocked Call rate % 0.00 0.00
2G Speech Quality (SQI) 99.18 99.55 Dropped Calls - 1 0
2G Speech Quality (MOS) 3.74 3.76 Dropped Call rate % 1.59 0.00
2G Call Setup Time in Sec 4.95 4.94 Total Handover Attempts - 92 88
Total Handover Success - 90 88
Handover Success rate % 97.83 100.00
Total Location Update Requests - 1 1
Total Location Update Success - 1 1
Location Update Success rate % 100.00 100.00
Call setup time 4.95 4.94
SQI MOS 3.74 3.76

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 4 (5)


Observations & Recommendations
DATE TIME EVENT FAILURE TECHNOLOGY AFFECTED CELL CAUSE RECOMMENDATION
Poor Network Poor network quality was due to delayed handover Review handover margin between 2136C
14/02/2017 13:48:18:475 2G 2136C and RV0662C
Quality between 2136C and RV0662C. and RV0662C.

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 5 (5)


Site distribution and Drive ROUTE

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 6 (5)


2G DEDICATED MODE: RX level PLOT
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 7 (5)


2G DEDICATED MODE: RX QUALITY PLOT
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 8 (5)


RX level status
RX LEVEL STATUS POST PRE

Cumulative
Rx Level Range Samples % Contribution Cumulative % % Remarks % Remarks
%

[-70, Max] 593 19.56% 19.56% 21.22%

[-81, -70] 1782 58.79% 78.36% 92.02% GOOD 75.78% 90.60% GOOD

[-85, -81] 414 13.66% 92.02% 90.60%

[-95, -85] 234 7.72% 99.74% 98.63%

7.98% Acceptable 8.68% Acceptable

[-100,-95] 8 0.26% 100.00% 99.28%

[Min, -100] 0 0.00% 100.00% 0.00% BAD 100.00% 0.72% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 9 (5)


RX quality status
RX QUALITY STATUS POST PRE

Rx Quality Cumulative
Samples % Contribution Cumulative % % Remarks % Remarks
Range %

Min,2 2660 88.61% 88.61% 89.54%

2,4 243 8.09% 96.70% 98.53% GOOD 95.66% 97.27% GOOD

4,5 55 1.83% 98.53% 97.27%

5,6 20 0.67% 99.20% 98.63%

1.33% Acceptable 2.49% Acceptable

6,7 20 0.67% 99.87% 99.76%

7,Max 4 0.13% 100.00% 0.13% BAD 100.00% 0.24% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 10 (5)


2G sqi plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 11 (5)


2G sqi STATUS
SQI STATUS POST PRE

Cumulative
SQI Range Samples % Contribution Cumulative % % Remarks % Remarks
%

[30, Max] 685 23.88% 23.88% 22.05%

[20, 30] 1984 69.15% 93.03% 91.59%


99.55% GOOD 99.18% GOOD
[10, 20] 165 5.75% 98.78% 97.43%

[0, 10] 22 0.77% 99.55% 99.18%

[-10, 0] 7 0.24% 99.79% 100.00%


0.45% Acceptable 0.82% Acceptable
[-20, -10] 6 0.21% 100.00% 100.00%

[Min, -20] 0 0.00% 100.00% 0.00% BAD 100.00% 0.00% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 12 (5)


2G sqi mos plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 13 (5)


2G sqi mos status
SQI MOS STATUS POST PRE

Cumulative
SQI MOS Range Samples % Contribution Cumulative % % Remarks % Remarks
%

[3.9 , Max] 943 33.06% 33.06% 29.72%

87.90% Good 89.80% Good

[3.5 ,3.9] 1564 54.84% 87.90% 89.80%

[2 , 3.5] 320 11.22% 99.12% 98.35%

11.68% Acceptable 9.52% Acceptable

[1.5 , 2] 13 0.46% 99.58% 99.32%

[Min , 1.5] 12 0.42% 100% 0.42% Bad 100% 0.68% Bad

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 14 (5)


2G cell id plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 15 (5)


2G EVENT FAILURE plot

NO EVENT FAILURE

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 16 (5)


› KPIs Summary
› Observations & Recommendations
› Site distribution & Drive route

Wcdma › RSCP & Ecno plot


› SQI MOS plot
performance
› PSC plot
› TX Plot
› Event failure plot & analysis
› Performance analysis

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 17 (5)


KPI’s summary
3G DEDICATED MODE KPIs Unit PRE POST
Call Initiation - 64 65
Call Attempts - 64 65
3G Drive Test KPI PRE POST Call Attempt Retry - 1 4
Call Setup - 64 65
100.00 100.00
Call Setup Success Rate (Speech) Call Established - 64 65
4.55 4.54 Blocked Call - 0 0
Call Setup Time MOC (Mean) sec
Dropped Call - 1 0
1.56 0.00
Drop Call Rate (Speech) RRC Connection - 73 69
100.00 100.00 RRC Connection Reject - 0 0
Soft Handover Success Rate (Speech) RRC Connection Abnormal
- 0 0
97.58 98.43 Release
Coverage Distribution (RSCP >-95dbm) Radio Link Addition - 703 647
93.46 94.18 Radio Link Addition Failure - 0 0
Coverage Distribution (EcNo >-14)
Radio Link Removal - 654 590
Radio Link Removal Failure - 0 0
Radio Link Replacement - 97 101
Radio Link Replacement Failure - 0 0
CSSR % 100.00 100.00
DCR % 1.56 0.00
Retainability Rate % 98.44 100.00
SHO % 100.00 100.00
RRC Connection Established % 100.00 100.00
Call Setup Time - 4.55 4.54
SQI (MOS) - 4.01 4.01
MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 18 (5)
Observations & Recommendations
DATE TIME EVENT FAILURE TECHNOLOGY AFFECTED CELL CAUSE RECOMMENDATION

Poor Ec/No was due to missing neighbor definition Add RV0677V to the neighbor list of
14/02/2017 08:33:21:847 Poor Ec/No 3G RV0222U andRV0677V
between RV0222U andRV0677V. RV0222U.

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 19 (5)


Site distribution and Drive ROUTE

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 20 (5)


3G DEDICATED MODE: RSCP PLOT
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 21 (5)


3G DEDICATED MODE: ECNO PLOT
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 22 (5)


Cpich rscp status
CPICH RSCP STATUS POST PRE

CPICH RSCP
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Range

[-75, Max] 1328 43.43% 43.43% 37.75%

[-85, -75] 1219 39.86% 83.29% 98.43% GOOD 75.56% 97.58% GOOD

[-95, -85] 463 15.14% 98.43% 97.58%

[-105, -95] 48 1.57% 100.00% 99.90%

1.57% Acceptable 2.42% Acceptable

[-115,-105] 0 0.00% 100.00% 100.00%

[Min, -115] 0 0.00% 100.00% 0.00% BAD 100.00% 0.00% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 23 (5)


cpich ec/no status
CPICH EcNo STATUS POST PRE

CPICH EcNo
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Range

[-8, Max] 1546 50.56% 50.56% 54.75%

[-10, -8] 784 25.64% 76.19% 94.18% GOOD 79.32% 93.46% GOOD

[-12, -10] 550 17.99% 94.18% 93.46%

[-14, -12] 168 5.49% 99.67% 98.65%

5.82% Acceptable 6.31% Acceptable

[-16,-14] 10 0.33% 100.00% 99.77%

[Min, -16] 0 0.00% 100.00% 0.00% BAD 100.00% 0.23% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 24 (5)


3G sqi plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 25 (5)


3G sqi STATUS
SQI STATUS POST PRE

SQI Range Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks

[30, Max] 2631 91.86% 91.86% 92.24%

[20, 30] 218 7.61% 99.48% 99.37%


99.65% GOOD 99.62% GOOD

[10, 20] 4 0.14% 99.62% 99.55%

[0, 10] 1 0.03% 99.65% 99.62%

[-10, 0] 2 0.07% 99.72% 99.62%


0.35% Acceptable 0.38% Acceptable
[-20, -10] 8 0.28% 100.00% 100.00%

[Min, -20] 0 0.00% 100.00% 0.00% BAD 100.00% 0.00% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 26 (5)


3G sqi mos plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 27 (5)


3G sqi mos status
SQI MOS STATUS POST PRE

SQI MOS Range Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks

[3.9 , Max] 2774 96.99% 96.99% 96.86%

99.16% Good 99.06% Good

[3.5 ,3.9] 62 2.17% 99.16% 99.06%

[2 , 3.5] 7 0.24% 99.41% 99.37%

0.35% Acceptable 0.35% Acceptable

[1.5 , 2] 3 0.10% 99.51% 99.41%

[Min , 1.5] 14 0.49% 100% 0.49% Bad 100% 0.59% Bad

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 28 (5)


3G PSC plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 29 (5)


3G tx plot
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 30 (5)


3G tx power status
TXPOWER STATUS POST PRE

CPICH EcNo
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Range

[Min, -30] 208 6.89% 6.89% 0.96%

[-30, -20] 625 20.69% 27.57% 17.15%


93.02% GOOD 83.91% GOOD

[-20, -10] 1132 37.47% 65.04% 50.02%

[-10, 0] 845 27.97% 93.02% 83.91%

[0, 10] 194 6.42% 99.44% 98.28%

6.98% Acceptable 16.09% Acceptable


[10, 20] 17 0.56% 100.00% 100.00%

[20, Max] 0 0.00% 100.00% 0.00% BAD 100.00% 0.00% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 31 (5)


3G pilot classification-ue-based
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 32 (5)


pilot POLLUTION STATUS
PILOT POLLUTION STATUS POST PRE

Pilot Pollution
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Status

Sole Server -
2737 61.46% 61.46% 61.46%
Strong

65.55% Good 65.55% Good

Sole Server -
182 4.09% 65.55% 65.55%
Marginal

Dominant Server 1527 34.29% 99.84% 34.29% Acceptable 99.84% 34.29% Acceptable

Weak Pilot 7 0.16% 100% 0.16% Bad 100% 0.16% Bad

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 33 (5)


3G EVENT FAILURE plot

NO 3G EVENT FAILURE

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 34 (5)


› KPIs Summary
› Site distribution & Drive route
› Rx level, Rx Quality, RSCP & Ecno plot

irat › SQI, SQI MOS plot


› Cell ID & PSC plot
performance

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 35 (5)


KPI’s summary
Irat DEDICATED MODE
2G 3G
KPIs Unit PRE POST KPIs Unit PRE POST
Call Initiation - 64 64
Call Initiation - 64 64 Call Attempts - 64 64
Call Attempts - 64 64 Call Attempt Retry - 3 2
Call Setup - 64 64
Call Setup Success - 64 64 Call Established - 64 64
Call Setup Success rate % 100.00 100.00 Blocked Call - 0 0
Dropped Call - 1 0
Blocked Calls - 0 0
RRC Connection - 65 51
Blocked Call rate % 0.00 0.00 RRC Connection Reject - 0 0
RRC Connection Abnormal
Dropped Calls - 1 0 - 0 0
Release
Dropped Call rate % 1.56 0.00 Radio Link Addition - 675 526
Radio Link Addition Failure - 0 0
Total Handover Attempts - 0 33 Radio Link Removal - 638 496
Total Handover Success - 0 33 Radio Link Removal Failure - 0 0
Radio Link Replacement - 99 87
Handover Success rate % 0.00 100.00 Radio Link Replacement
- 0 0
Total Location Update Failure
- 1 1
Requests CSSR % 100.00 100.00
Total Location Update DCR % 1.56 0.00
- 1 1
Success Retainability Rate % 98.55 100.00
Location Update Success rate % 100.00 100.00 SHO % 100.00 100.00
RRC Connection Established % 100.00 100.00
Call setup time - 2.97 2.96 Call Setup Time - 2.97 2.96
SQI MOS - 4.01 3.96 SQI (MOS) - 4.01 3.96

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 36 (5)


Site distribution and Drive ROUTE
2G 3G

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 37 (5)


RX Level & rscp plot
2G 3G

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 38 (5)


RX LEVEL & RSCP STATUS
RX LEVEL STATUS POST PRE

Rx Level Range Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks

[-70, Max] 185 27.09% 27.09% #DIV/0!

[-81, -70] 383 56.08% 83.16% 94.00% GOOD #DIV/0! #DIV/0! GOOD

[-85, -81] 74 10.83% 94.00% #DIV/0!

[-95, -85] 40 5.86% 99.85% #DIV/0!


6.00% Acceptable #DIV/0! Acceptable
[-100,-95] 1 0.15% 100.00% #DIV/0!

[Min, -100] 0 0.00% 100.00% 0.00% BAD #DIV/0! #DIV/0! BAD

CPICH RSCP STATUS POST PRE


CPICH RSCP
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Range
[-75, Max] 1025 43.16% 43.16% 41.60%

[-85, -75] 1002 42.19% 85.35% 99.07% GOOD 79.37% 97.68% GOOD

[-85, -85] 326 13.73% 99.07% 97.68%

[-105, -95] 22 0.93% 100.00% 99.97%


0.93% Acceptable 2.32% Acceptable
[-115,-105] 0 0.00% 100.00% 100.00%

[Min, -115] 0 0.00% 100.00% 0.00% BAD 41.60% 97.68% GOOD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 39 (5)


RX QUAL & ECNO PLOT
2G 3G

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 40 (5)


RX QUAL & ECNO STATUS
RX QUALITY STATUS POST PRE

Rx Quality Range Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks

Min,2 642 94.13% 94.13% #DIV/0!

2,4 30 4.40% 98.53% 99.12% GOOD #DIV/0! #DIV/0! GOOD

4,5 4 0.59% 99.12% #DIV/0!

5,6 4 0.59% 99.71% #DIV/0!


0.73% Acceptable #DIV/0! Acceptable
6,7 1 0.15% 99.85% #DIV/0!

7,Max 1 0.15% 100.00% 0.15% BAD #DIV/0! #DIV/0! BAD

CPICH EcNo STATUS POST PRE


CPICH EcNo
Samples % Contribution Cumulative % % Remarks Cumulative % % Remarks
Range

[-8, Max] 1182 49.77% 49.77% 60.94%

[-10, -8] 628 26.44% 76.21% 94.86% GOOD 84.02% 95.52% GOOD

[-12, -10] 443 18.65% 94.86% 95.52%

[-14, -12] 115 4.84% 99.71% 99.23%


5.14% Acceptable 4.45% Acceptable
[-16,-14] 7 0.29% 100.00% 99.97%

[Min, -16] 0 0.00% 100.00% 0.00% BAD 100.00% 0.03% BAD

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 41 (5)


SQI sqi & sqi mos plot SQI MOS

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 42 (5)


PERCENTAGE SERVICE BY TECHNOLOGY (IRAT)
Percentage Service by Technology (IRAT)

GSM WCDMA

22.33%

77.67%

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 43 (5)


› HSDPA PLOT

Data
throughput
test

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 44 (5)


3G hs-dsch throughput total
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 45 (5)


3G hs-dsch throughput STATISTICS
HS-DSCH THROUGHPUT STATUS POST PRE

Throughput Cumulative
Samples % Contribution Cumulative % % Remarks % Remarks
Range %

[Max, 4096] 281 11.21% 11.21% 8.81%

[4096, 2048] 1114 44.44% 55.64% 74.11% Good 69.27% 79.95% Good

[2048 , 1024] 463 18.47% 74.11% 79.95%

[1024 , 512] 175 6.98% 81.09% 83.85%


10.21% Acceptable 5.99% Acceptable
[512 , 256] 81 3.23% 84.32% 85.94%

[256 , 128] 29 1.16% 85.48% 86.72%

[128 , 0] 364 14.52% 100.00% 15.68% Bad 100.00% 14.06% Bad

[0 , Min] 0 0.00% 100% 100%

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 46 (5)


3G hs phy requested throughput
total
PRE POST

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 47 (5)


3G hs phy requested throughput
STATISTIC
HS PHY REQUESTED THROUGHPUT STATUS POST PRE

Throughput Cumulative
Samples % Contribution Cumulative % % Remarks % Remarks
Range %

[Max, 4096] 529 86.58% 86.58% 80.83%

[4096, 2048] 68 11.13% 97.71% 99.67% Good 95.96% 99.48% Good

[2048 , 1024] 12 1.96% 99.67% 99.48%

[1024 , 512] 1 0.16% 99.84% 99.74%


0.33% Acceptable 0.52% Acceptable
[512 , 256] 1 0.16% 100.00% 100.00%

[256 , 128] 0 0.00% 100.00% 100.00%

[128 , 0] 0 0.00% 100.00% 0.00% Bad 100.00% 0.00% Bad

[0 , Min] 0 0.00% 100% 100%

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 48 (5)


EVENT FAILURE ANALYSIS
The analyses are in files embedded below

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 49 (5)


Thank you!!!

MTN - Ericsson MS Performance | © Ericsson NG 2015 | 2015-11-03 | Page 50 (5)

You might also like