Project Description: Definisi Dan Objective

IQEAP is a tool that allows engineers to simulate production capacity by planning equipment allocation and settings. It integrates PERE (Project Equipment Requirement Estimation Online Form) data and unit movement data between sites to estimate production capacity more accurately. The main functions are: 1. Engineers can define production plans including productivity, unit availability, production amounts, and equipment needs. 2. Users can simulate fleet movement between sites and recalculate expected production totals and potential needs for additional equipment across sites. 3. The simulation data can then update the PERE as needed to reflect capacity changes from moving units between sites.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views3 pages

Project Description: Definisi Dan Objective

IQEAP is a tool that allows engineers to simulate production capacity by planning equipment allocation and settings. It integrates PERE (Project Equipment Requirement Estimation Online Form) data and unit movement data between sites to estimate production capacity more accurately. The main functions are: 1. Engineers can define production plans including productivity, unit availability, production amounts, and equipment needs. 2. Users can simulate fleet movement between sites and recalculate expected production totals and potential needs for additional equipment across sites. 3. The simulation data can then update the PERE as needed to reflect capacity changes from moving units between sites.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 3

Definisi dan Objective: Project Description

IQEAP (Integrated Equipment Allocation &


Planning) merupakan sebuah tools informasi
yang berfungsi untuk melakukan simulasi
PERE ONLINE
produksi (perubahan kapasitas unit) dan setting
performance untuk mencapai kapasitas
maksimum.

Timeframe Project
PLANNING DWH EQUIPMENT
-Plan Equip. unit running -DWH master Equipment
-Plan PA,UA, Prodty, total hari
efektif

-Simulasi Plan Produksi


(movement unit)

Jan-Feb’18 Mar’18 Apr’18 Mei’18 Jun’18 Jul’18


Perencanaan Sistem Desain Implementation System UAT &
Analisa Sistem informasi Trial & Testing Revision

Desain grafis (UI) GO LIVE


Database Application Fase 1
Model Development
Database Design by Visual
Studio
Plan Equipment Requeirement Estimation Online Form
PERE Online digunakan untuk menghitung Jumlah Kebutuhan Alat di Site, sebagai bahan dasar
untuk pengajuan IBS

iQEAP Application is a tool for The main user (engineer), first off The data will shows on the main
helping engineer to save, simulate all would define the plan of
dashboard inside iQEAP
need of equipment (based on production parameter such as,
PERE). Then delivere it to all productivity, UA, PA, and application, responsive change
stakeholder online. Equipment. based on PERE data
Simulation Module for Quick Calculating Production Estimation
Mengintegrasikan data PERE dan data Moving unit seluruh site, sehingga bisa mengestimasi
kapasitas produksi masing-masing site lebih lengkap dengan adanya fleet movement

1. User pick sites for simulation


iQEAP Application allows users to
2. User choose site destination
simulate and recalculate the need
3. User pick total of egi Loader and dumptruck wish to move
of equipment (PERE), based on
4. System will recalculate production total result (decrease and increase
data of unit movement among
between sites)
sites
5. PERE might be updated based on simulation data