Quality Assurance: Early Work Items

This document provides an overview of quality assurance concepts and best practices for early work items in the development cycle. It discusses establishing QA requirements, reviewing design work, and developing a testing strategy. Specifically, it recommends publishing QA requirements, evaluating designs for testability, completeness, and consistency, and planning test specifications, harnesses, schedules, and evaluating challenges. The goal is to incorporate QA practices from the start to reduce defects and ensure customer needs are met.

Uploaded by

triptii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views30 pages

Quality Assurance: Early Work Items

This document provides an overview of quality assurance concepts and best practices for early work items in the development cycle. It discusses establishing QA requirements, reviewing design work, and developing a testing strategy. Specifically, it recommends publishing QA requirements, evaluating designs for testability, completeness, and consistency, and planning test specifications, harnesses, schedules, and evaluating challenges. The goal is to incorporate QA practices from the start to reduce defects and ensure customer needs are met.

Uploaded by

triptii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 30

Quality Assurance:

Early Work Items


Introduction: Ian King
 Software Test Lead, Microsoft Corporation
 Manager of Test Development for Windows
CE Base OS (kernel, drivers, file systems)
 Previous projects at Microsoft:
 MSN 1.x online service, Site Server 3.0,
TransPoint online service, Speech API 5.0
 Previously: business analyst, Pacific Telecom
Introduction to QA concepts
 QA, QC and testing
 Quality Assurance: making it right the first time
 Quality Control: making it right every time (i.e. in
production)
 QA and QC both include testing as an activity
What is the ‘value add’ of QA?
 Classic research: fixing a defect is cheaper
the earlier you catch it
 $: found in spec process
 $$: found during implementation
 $$$: found during post-implementation testing
 $$$$: found in the field
 QFE, service packs, product recalls, lawsuits
 Customer confidence
‘Make It Didn’t Happen’
 The best bug is the one that was never born!
 QA is about process
 Design review
 Implementation review
 Structured testing and evaluation
 Instrumentation/testability
 Best practices
 QA does not mean bodies: Pacific Telecom
 Lesson of History: good process leads to fewer
defects
The deliverable of QA
 QA delivers information
 What is known about the quality of the code?
 What are the risks of known defects?
 What is not known, i.e. untested?
 What risks may arise from unknown defects?
 E.g. “We didn’t test for malicious use”
 “Bearer of bad news”
 “Validation of the vision”
Scaling to the project
 Large project
 Individual design/programming and QA teams
 Another team to coordinate and administer
 Medium-sized project
 QA often assumes coordination role
 Small/solo project
 Develop ‘functional schizophrenia’
 Write it down
QA is everyone’s job!
…testing is only one part.
What does QA do early in the
development cycle?
 Publish (and promote) QA requirements
 Review design work
 Develop testing strategy
Establish QA Requirements
 Statement of requirements
 Feature specifications
 Implementation specifications
 Design change process
 Development schedule
 Build process
 Developer practice
 Defect process
 Release criteria
Statement of Requirements:
Why are we here?
 Who is the customer?
 What problem are we solving for the
customer?
 Should NOT include:
 Feature details
 Implementation details
Feature Specifications
 What will we make to solve the customer’s
problem?
 Does not prescribe implementation
 Descriptive:
 Workflow
 Actor
 Interface
Implementation specifications
 Typically for large projects, but always
beneficial
 How is a feature implemented?
 Details of resource usage, exception handling,
use of published standards, etc.
 Dependency on other feature implementation
 Dependency on external factors
 Development environment (SDKs)
 Other products’ modules (e.g. MSXML)
Design Change Process
 How are design changes documented?
 DCR vs. “bug”
 How are change decisions made?
 When has “the ship sailed”? Design Freeze
Development Schedule
 When will specs be complete?
 When will code be available?
 When will features be complete?
 When will code be stable?
 Beta releases?
 Leave enough time for the endgame:
 Complete test pass on Release Candidate
 Test of final installation media (may include digital
signing, release notes)
To beta, or not to beta
 Quality bar for beta release: features mostly
work if you use them right
 Pro:
 Get early customer feedback on design
 Real-world workflows find many important bugs
 Con:
 Do you have time to incorporate beta feedback?
 A beta release takes time and resources
Build Process
 Source control
 Undo the ‘oops
 Centralized build
 Be sure everyone is testing the same bits
 Avoid platform dependencies (msvcrtd)
 How often are new builds generated?
 Periodic
 Event-Driven
 Configuration management
Developer Practice
 Private builds
 Buddy builds
 Code review
 Code analysis tools
 Unit testing
Defect Process
 Why are defects tracked?
 How are defects tracked?
 What is the lifecycle of a bug?
 How are defects prioritized?
 Controlled check-ins/triage process
 Defect analysis:
 Defect source analysis
 Root cause analysis
Release Criteria
 When are we done?
 Indicators of completeness:
 Quantity of defects being found
 Severity of defects being found
 Completeness of testing
Review Design Work
 Are these documents sufficient to scope the
project?
 Are they logically consistent?
 Is the project testable?
 Test hooks, registry entries, compiler directives
 Instrumentation
 Does the project address the stated
requirements?
Review Design Work (con’t.)
 Evaluate use scenarios
 Sensible control flows?
 Features appropriate to use? (E.g. quiesce
server)
 Evaluate failure scenarios
 Meaningful error feedback
 Single points of failure
 Cascading failures
 Understand dependencies
Developing Test
Strategy
Elements of Test Strategy
 Test specification
 Test plan
 Test harness/architecture
 Test case generation
 Test schedule
Test Specifications
 What questions do I want to answer about this
code? Think of this as experiment design
 In what dimensions will I ask these questions?
 Functionality
 Security
 Reliability
 Performance
 Scalability
 Manageability
Test Plans
 How will I ask my questions? Think of this as the
“Methods” section
 Understand domain and range
 Establish equivalence classes
 Address domain classes
 Valid cases
 Invalid cases
 Boundary conditions
 Error conditions
 Fault tolerance/stress/performance
Test Harness/Architecture
 Test automation is nearly always worth the
time and expense
 How to automate?
 Commercial harnesses
 Roll-your-own (TUX)
 Record/replay tools
 Scripted harness
 Logging/Evaluation
Test Cases
 Actual “how to” for individual tests
 Expected results
 One level deeper than the Test Plan
 Automated or manual?
 Environmental/platform variables
Test Schedule
 Phases of testing
 Unit testing (may be done by developers)
 Component testing
 Integration testing
 System testing
 Dependencies – when are features ready?
 Use of stubs and harnesses
 When are tests ready?
 Automation requires lead time
 The long pole – how long does a test pass take?
Where The Wild Things Are:
Challenges and Pitfalls
 “Everyone knows” – hallway design
 “We won’t know until we get there”
 “I don’t have time to write docs”
 Feature creep/design “bugs”
 Dependency on external groups