0% found this document useful (0 votes)
80 views21 pages

Beam On Elastic Foundation

The document presents calculations to analyze the loads and bending moments on a beam on an elastic foundation. It provides parameters of the beam, foundation spring constants, and divides the beam into sections to calculate the load Q and bending moment M at different points. The given values are then used to calculate Q and M at each section. Q and M are expressed as functions of the displacement variables y1 through y5. Numerical values for y are then substituted to calculate the final load and bending moment values at each point.

Uploaded by

Nur Priyanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views21 pages

Beam On Elastic Foundation

The document presents calculations to analyze the loads and bending moments on a beam on an elastic foundation. It provides parameters of the beam, foundation spring constants, and divides the beam into sections to calculate the load Q and bending moment M at different points. The given values are then used to calculate Q and M at each section. Q and M are expressed as functions of the displacement variables y1 through y5. Numerical values for y are then substituted to calculate the final load and bending moment values at each point.

Uploaded by

Nur Priyanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 21

Beam on Elastic

Foundation
Hendriawan Kurniadi
(0906630292)
P = 10 MN
ksi1 = 30 MN/m3
ksi2 = 40 MN/m3
ksi3 = 50 MN/m3
ksi4 = 60 MN/m3
ktiang-i = 300 MN/m3

B = 0,5 m
D = 0,5 m
Ebeton = 20000 MN/m2
I = (1/12) × B × D3
= (1/12) × 0,5 × 0,53
= 0,0052083 m4

EI = 20000 × 0,0052083
= 104,17 MNm2
ks1 = (ksi1/B) × 0,305
= (30/0,5) × 0,305
= 18,3 MN/ m3

ks2 = (ksi2/B) × 0,305


= (40/0,5) × 0,305
= 24,4 MN/m3

ks3 = (ksi3/B) × 0,305


= (50/0,5) × 0,305
= 30,5 MN/m3

ks4 = (ksi4/B) × 0,305


= (60/0,5) × 0,305
= 36,6 MN/m3

ktiang = (ktiang-i/B) × 0,305


= (300/0,5) × 0,305
= 183 MN/m3
Q1 = (q1 × areaq1)
= (ks1 × y1 × (1/2) × 0,5)
= (18,3 × y1 × 0,5 × 0,5)
= 4,575y1 MN
Q2 = (q1 × areaq1) + (qtiang × areatiang) + (q2 ×
areaq2)
= (ks1× y2 × 0,4 × 0,5) + (ktiang × y2 × 0,2 ×
0,5) + (ks2 × y2 × 0,4 × 0,5)
= (18,3 × y2 × 0,4 × 0,5) + (183 × y2 × 0,2 ×
0,5) + (24,4 × y2 × 0,4 × 0,5)
= 3,66y2 + 18,3y2 + 4,88y2
= 26,84y2 MN
Q3 = (q2 × areaq2) + (q3 × areaq3)
= (ks2 × y3 × 0,5 × 0,5) + (ks3 × y3 × 0,5 × 0,5)
= (24,4 × y3 × 0,5 × 0,5) + (30,5 × y3 × 0,5 ×
0,5)
= 6,1y3 + 7,625y3
= 13,725y3 MN
Q4 = (q3 × areaq3) + (qtiang × areatiang) + (q4 ×
areaq4)
= (ks3 × y4 × 0,4 × 0,5) + (ktiang × y4 × 0,2 ×
0,5) + (ks4 × y4 × 0,4 × 0,5)
= (30,5 × y4 × 0,4 × 0,5) + (183 × y4 × 0,2 ×
0,5) + (36,6 × y4 × 0,4 × 0,5)
= 6,1y4 + 18,4y4 + 7,32y4
= 31,82y4 MN
Q5 = (q4 × areaq4)
= (ks4 × y5 × (1/2) × 0,5)
= (36,6 × y5 × 0,5 × 0,5)
= 9,15y5 MN
Asumsi nodal 1 dan 5 sendi, M1 = M5 = 0

M2 = (Q1 × 1)
= 4,575y1 MNm

M3 = (Q1 × 2) + (Q2 × 1) – (P × 1)
= (4,575y1 × 2) + (26,84y2 × 1) – (10 × 1)
= 9,15y1 + 26,84y2 – 10 (MNm)

M4 = (Q1 × 3) + (Q2 × 2) – (P × 2) + (Q3 × 1)


= (4,575y1 × 3) + (26,84y2 × 2) – (10 × 2) +
(13,725y3 × 1)
= 13,725y1 + 53,68y2 – 20 + 13,725y3 (MNm)
Q1 = 4,575y1
= 4,575 × (-22,36)
= -102,29 MN

Q2 = 26,84y2
= 26,84 × (-9,75)
= -261,69 MN

Q3 = 13,725y3
= 13,725 × 1,88
= 25,80 MN

Q4 = 31,82y4
= 31,82 × 8,94
= 284,47 MN

Q5 = 9,15y5
= 9,15 × 8,08
= 73,93 MN
M2 = 4,575y1
= 4,575 × (-22,36)
= -102,30 MNm

M3 = 9,15y1 + 26,84y2 – 10
= (9,15 × -22,36 ) + (26,84 × -9,75 ) – 10
= -456,28 MNm

M4 = 13,725y1 + 53,68y2 – 20 + 13,725y3


= (13,725 × -22,36 ) + (53,68 × -9,75 ) – 20 +
(13,725 × 1,88)
= -824,47 MNm