Safe Working Culture To Zerorize/minimise: Industrial Accident

This document discusses the importance of workplace safety and minimizing industrial accidents through proper training and compliance with regulations. It provides an example of how non-compliance resulted in a worker's death from falling off a transmission tower while working without proper protective equipment. It also outlines the process for obtaining a work permit, including assembling a team, inspecting the work area for hazards, and having supervisors approve the work. The goal is to ensure all jobs are completed safely through following orderly protocols.

Uploaded by

Isse Essi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views9 pages

Safe Working Culture To Zerorize/minimise: Industrial Accident

This document discusses the importance of workplace safety and minimizing industrial accidents through proper training and compliance with regulations. It provides an example of how non-compliance resulted in a worker's death from falling off a transmission tower while working without proper protective equipment. It also outlines the process for obtaining a work permit, including assembling a team, inspecting the work area for hazards, and having supervisors approve the work. The goal is to ensure all jobs are completed safely through following orderly protocols.

Uploaded by

Isse Essi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 9

SAFE WORKING CULTURE

to zerorize/minimise
INDUSTRIAL ACCIDENT
FKEE COURSE CODE BEE 1611

INDUSTRIAL ACCIDENT
and OSHA
case example
FKEE COURSE CODE BEE 1611

ACCIDENT TRIANLGE

1 DEATH

3 WORKING TIME LOSS

50 WORK REPLACEMENT (HELP START)

80 LOSS OF ASSET

400 NEARING ACCIDENT

Source : Ismail Bahari : Pengurusan Keselamatan dan Kesihatan Pekerjaan {Page 90}
FKEE COURSE CODE BEE 1611
TELCO BUSINESS SCENARIO
ONE SWITCHING CENTRE FAILS for
EXAMPLE
One Hour
due to Lightning Strike and leads to
Major Technical Disaster
WHAT IS THE IMPACT ????

TRUNK LOCAL
TRX SXS SXS

MSC AIRCON UPS GEN SET


FKEE COURSE CODE BEE 1611

EVERYONE IS BUSY IN A COMMOTION


TELCO BUSINESS SCENARIO
KUANTAN SWITCHING CENTRE
IMPACT OF FAILURE

NO of 3 minute calls = 1,000,000


Per Call Charges / 3 minutes = Rm .50
Revenue for 1,000,000 3 minute calls = RM 500,000.

If Kuantan Switching Centre Fails for 1 hr ( 20*3 minutes)

Potential Loss = RM (20 * 0.3) million = RM 10 Million


FKEE COURSE CODE BEE 1611

DOSH SEALED OFF THE


During the major failure commotion
SWITCHING CENTRE FOR
One aerial rigger who was ordered
THOROUGH INVESTIGATION
to check the microwave link on top
For NOT COMPLYING to
of a transmission tower, suddenly fell off
OSHA ACT 514
and died.

To everyone surprise he was not properly


attired while climbing and doing his work on
the tower
FURTHER
LOSS OF
TIME &
REVENUE
SAFE WORKING CULTURE

Objective :
.To zerorize hazard, risk and danger for safety and health at Place of Work

.To practice orderly protocol for the benefit of the organization in complying
with ACT514

One of the ways to :

.Get informed and know about the Job


.What it takes to carry out the Job
.Get properly trained for the Job
.Let other know to while doing the JOB

___ to be alert on Safety and Emergency


WORK PERMIT SAMPLE
COMPANY : ABC SDN BHD WORK PERMIT NO : 12345-2013
Description of JOB
1. To inspect Boiler Leakage
2. To rectify Leakage
3. To Test Rectification Job

LOCATION BOILER A
TIME IN 09:00
TIME OUT 12:00
DATE 20-01-2013
CHECK LIST CHECKED
1.AIR EXTRACTOR ok
2.POWER ISOLATION ok
3.WATER ISOLATION ok
4.LIGHTING ok
5.PERSONAL PROTECTIVE EQP ok
6.EMERGENCY DOOR UNLOCK ok
7.BRIEFING TO TEAM MEMBERS ok
8.BRIEFING TO SECURITY ok

APPROVAL JOB INSPECTOR SECURITY OFFICER

Note : Name : Mr Saiyed Name : Mr Albert


Position : SHO Position : CSO
Time : 12:00 Time : 12:00
Date : 19-01-2013 Date : 19:01-2013

1. SECURITY INFORMED ok
1. TEAM HEAD INFORMED ok
PERMIT TERMINATION
1. JOB DONE No
2. NEW WORK PERMIT Yes
1. TEAM MEMBERS COUNT 5 in 5 out
2. SECURITY PASS COLLECTED 5 out 5 in
TEAM MEMBERS IDENTIFICATION POSITION

1.Mr Abdul ST0001 CHIEF PLUMBER

2.Miss Noni ST0010 Painter

3.Mr Udin ST0020 Cleaner

4.Mr Samuel ST0030 Safety Controller

5.Mr Ah Seng ST0031 Equipment Monitor