Discharge
Discharge
Discharge
Schlumberger Confidential
Presenter
Julian Cudmore
AL monitoring Business Development
Inverurie, Aberdeen
The most effective way to optimize
an artificially lifted well is through systematic
Schlumberger Confidential
and rapid application of
Downhole Monitoring
Well testing
Artificial Lift Modeling - diagnosis.
2 JRC
8/29/2018
Production Gains from Effective Downhole monitoring and
diagnosis
88% gain over 30 wells
8000 9000
8000
7000
Schlumberger Confidential
7000
6000
6000
5000
4000
4000
3000
3000
2000
2000
1000
1000
0 0
well 1 well 2 well 3 well 4 well 5 well 6 well 7 well 8 well 9 well 10 well 11 well 12 well 13
3 JRC
Net gains stb/d
8/29/2018 Net Oil before optimization stb/d
Cummulative Gains stb/d
Pump Intake Pressure only… looks OK..?
Monitoring and Protection
100 3
Pressure
90
Draw down Build Up
2.5
Schlumberger Confidential
80
started at pump 2
70
intake
Pressure
1.5
60
1
50 ESP off
0.5
40
30 0
01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999
14:24 14:38 14:52 15:07 15:21 15:36 15:50 16:04 16:19 16:33 16:48
Time
4 JRC
8/29/2018
The same data with discharge pressure
Wing
Monitoring and Protection
250
Valve 3
opened.
2.5
200
Productio
Schlumberger Confidential
n Choke
Valve n Choke 2
150 Adjustme
closed. Adjustme
nts
Pressure
50
0.5
0 0
01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999 01/12/1999
14:24 14:38 14:52 15:07 15:21 15:36 15:50 16:04 16:19 16:33 16:48
Time
5 JRC
8/29/2018
Schlumberger Confidential
50 90
Discharge
% %
Pressure
Intake
Pressure
- No
change Pwf
6 JRC
8/29/2018
Use modelling to predict well performance.
Provides us a preliminary indication that says:
Measured
Wellhead
Pressure
Schlumberger Confidential
Calculated Pump
Values must Measured
Discharge Operating Point
match
measured Pressure
values
Measured
7 JRC
Intake
8/29/2018
“ Pressure
…we have a problem!”
Motor Temperature
Trend From: 11/2/03 to: 11/3/03
225 5
200 4.5
Motor Temperature 4
Schlumberger Confidential
175
Shut Down Protects the ESP
(120C)
3.5
150
3
IOPoint Value
125
2.5
100
2
75
1.5
50
1
25 0.5
0 0
11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/3/03 11/3/03 11/3/03
8 JRC 13:12
12:00 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 0:00 1:12 2:24
8/29/2018
Pi(bara) Tm(C) WHP(bara)
Amps Ti (C) Vib
Add RT data, Discharge Pressure and
Analysis to prevent lost production
Trend From: 11/2/03 to: 11/3/03
250 5
Data Diagnosis
225 Performed using Problem Remedied 4.5
Schlumberger Confidential
ALXP
200 4
IO Presure Temperature Amps
125 2.5
100 2
75 1.5
50 1
25 0.5
0 0
11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/2/03 11/3/03 11/3/03 11/3/03
12:00 13:12 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 0:00 1:12 2:24
9 JRC
8/29/2018
Pi(bara) Pd(bara) Ti (C)
Tm(C) WHP(bara) Amps
Vib
ALXP Plots
Schlumberger Confidential
10 JRC
8/29/2018
Production Gains from Effective Downhole monitoring and
diagnosis
1600
2600 bopd gained Using LiftPro on 18 wells
Schlumberger Confidential
2500
1400
1000
1500
800
600 1000
400
500
200
0 0
Wafra28
Well 1 Wafra1
Well2 Wafra15
Well 3 Wafra16
Well4Wafra7 Well
Wafra25
5 Wafra17
Well 6 Wafra24
Well 7 Wafra9
Well 8 Wafra26
Well 9 We