Access is through a 6m
wide road through Ring
road 2
ADMIN AREA
Office for manager
Guard and control room
Raw material storage
MACHINE
3 injection moulding machine is added
Another block is added later to accommodate new machine
PACKAGING
Arranging, sealing and finishing
STORAGE
Finished and raw material storage
TRANSPORT
Area is provided for truck and lorries
Raw material Injection moulding Arranging
machine packaging
• Control board
transformer
compressor
• PLUMBING
• THE FACTORY HAS ITS OWN BOREWELL
• PROVISION OF TWO COOLING TOWERS
• THE HEAT AND TEMPERATURE RAISED DUE TO MACHINES, ARE COOLED DOWN USING COOLING TOWER.
• THE SOLID WASTE COLLECTED, IS CRUSHED INTO GRANULES, USING CRUSHING MACHINE AND
USED FOR MAKING QUALITY 3 PRODUCTS.
• FOR SECURITY PURPOSE,
MASK IS PROVIDED AS HARMFUL GASES ARE THERE WHILE WORKING WITH PLASTIC.