Gas & Condensate Production Facility Block Diagram
Gas & Condensate Production Facility Block Diagram
Gas & Condensate Production Facility Block Diagram
Produced BSRU
Water System
Booster
Separation
Wellhead
System
Compressor AGRU
System
Condensate
System
DPCU DHU
INCINERATOR/TOX
TO ATM
FUEL GAS
2
OVERVIEW PRODUKSI & PENYALURAN GAS DARI CPP DONGGI & CPP MATINDOK
PLN
Minahaki Future
CPP
CPP MATINDOK
MATINDOK
PIPA 16” 37 KM
Well
PAU
300 m
Senoro
MATINDOK
ALLOCATION
DONGGI METERING
ALLOCATION
METERING USO SALES DSLNG
METERING
CPP
CPP SENORO
SENORO SENORO
17 KM
ALLOCATION
JOB P-MTS
METERING PIPA 30” 6.8 KM
TIP 1 TIP 2
Cendanapura
3
OVERVIEW PRODUKSI & PENYALURAN KONDENSAT DARI CPP DONGGI & CPP MATINDOK
Condensate Facilities
Condensate From
Matindok
CONDENSATE
SENORO CONDENSATE
TANK
STABILIZATION SENORO
AT MATINDOK CPP
3 x 1956 m3 SYSTEM CONDENSATE
( 3 x 12300 BBLS)
380-TK-1001
A/B/C
PEP CONDENSATE TO
RECEIVING TANK LOADING
AT SENORO TANKER
1 x 682 m3
FI
(1 x 4300 BBLS)
METERING
750-TK-1001
PEP Condensate
Transfer Pump
2 x 8 m3/h
(2 x 1200 BPD)
8”
CPP SENORO
CONDENSATE STORAGE TANK C/D BAJO JETTY
CAP. 2 X 50,000 BBLS CONDENSATE STORAGE TANK E/F
CAP. 2 X 110,000 BBLS
4
OVERVIEW WELL CPP DONGGI
CPP
DONGGI
Cluster-5 (DNG 5)
Cluster-3 (DNG 3)