RUNNING PREVENTIVE MAINTENANCE
OF HT MOTORS-DRI-SMP-E&I-1-03
SPM OF HT MOTORS-DRI-SMP-E&I-1-04
SAFETY PRECAUTION & OHS RISK-
RPMI
No loose clothing
Do not touch any rotating part of the
equipment.
OHS Risk-Personal Injury
SAFETY PRECAUTION & OHS RISK-
SPMI
Electrical Shock because of static charge.
Personal injury due to mishandling of
parts.
OHS Risk
Ensure Positive isolation by
operations
Take Electrical isolation of motor.
Obtain Safe work permit
Maintenance Procedure-RPMI
Pre-Requisite
work permit
Clean motor body (Don’t overreach for cleaning)
Maintenance Procedure-RPMI
INSPECTION CHECKS
Motor, Power JB, LCS earthing
Abnormal sound
Abnormal Vibration
Maintenance Procedure-RPMI
TEMPERATURE CHECKS
DE/NDE side bearing
Motor Body
Cables
Maintenance Procedure-RPMI
ADDITIONAL CHECKS
Monsoon protection
water flow and leakage of radiator
(Where Applicable)
lube oil flow and leakage (Where Applicable)
Maintenance Procedure-RPMI
JOB CLOSURE
House keeping of Area
Work Permit Closure
Maintenance Procedure-SPMI
Pre-Requisite
work permit
LOTOTO - Lock out-Tag out-Try out
ROTOR StandStill
Clean motor body (Don’t overreach for
cleaning)
Maintenance Procedure-SPMI
INSPECTION CHECKS
Start -> Activate local emergency
Inspect for Crack/Damages
Grease nipples & its cleanliness
Maintenance Procedure-SPMI
INSPECTION CHECKS
Bearing lube oil system-
1) Flow
2) Leakage
3) Cleanliness
Maintenance Procedure-SPMI
INSPECTION CHECKS
Cooling water system-
1) Flow
2) Leakage
3) Cleanliness
Maintenance Procedure-SPMI
INSPECTION CHECKS
Cooling Fan & Fan Cover
Remove Dust, Rust, Oil, Grease
Maintenance Procedure-SPMI
INSPECTION CHECKS
ELECTRICAL
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
CACA
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
TEFC
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
CACW
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
Discharge Rod Rubber Gloves Insulated shoes
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
PSTB Spaced Terminal Box
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
Cable & Motor to be discharged
Check the terminal studs & terminal connectors
(TB & star point )
Terminal bushing/bushing plate for damage due
to cracks, excessive carbonization etc.
Maintenance Procedure-SPMI
INSPECTION CHECKS – Electrical
Signs of moisture
Loose connection
Space heater cable
RTD/BTD cable
Maintenance Procedure-SPMI
INSPECTION CHECKS – Records
Winding resistance
Inductance
Maintenance Procedure-SPMI
ADDITIONAL CHECKS
Monsoon protection
1. Space Heater Terminal Box
2. RTD/BTS Terminal Box
3. Local Control Box
4. Power JB
5. Cable glands having top & side cable
entry.
Maintenance Procedure-SPMI
JOB CLOSURE
House keeping of Area
Work Permit Closure
Return of Isolation Permit
Maintenance Procedure-Panel
Maintenance Procedure-Panel
Maintenance Procedure-Panel
Maintenance Procedure-Panel
Maintenance Procedure-Panel