0% found this document useful (0 votes)
71 views2 pages

Routing Migration in S/4 Hana From Ecc: List of Routing List of Routing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views2 pages

Routing Migration in S/4 Hana From Ecc: List of Routing List of Routing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ROUTING MIGRATION IN S/4 HANA FROM ECC

KEY POINTS : (For Extraction)


- Routing with change number (With Date / Without Date :
Effectivity)
- Will consider all the assignment and text related to routing. KEY POINTS :
- Will consider the routing with future valid date also This is planned to run only selected
List of List of input
ROUTING ROUTING

IDOC Generated KEY POINTS : (For Load)


- Will accomodate the information in IDOC.
(Include Long text , PRT Assginement, ....)
List of Routing
DATABASE DATABASE Created

EXTRACTED DATA TRANSFORMED DATA

KEY POINTS : (For Transformation)


- Will maintain an ZTable for mapping in the target system, So user can directly maintain the
value for mapping
- To Identify whether its a valid record, Will put it place many rule for easy validation
- For history we will transform and fetch the data.
BUSINESS PARTNER MIGRATION IN S/4 HANA 1610

Generic SAP Data services framework re-engineered with RDM solution to


migrate the Business Partner in single step

 Eye opening solution for any S4 HANA project to directly


start migrating the BP’s with limited fine tuning as per any
client business/industry needs

 Handy test cases, working authorization lists and SAP notes


to make the solution Robust to handle any delta/change
loads or issues such as mass updates.

 Reduction in migration time by over 65% from 3 days to


less than 1 day
 60% reduction in overall migration effort, client savings
per year USD 3240 $
NOTE: Savings calculated on hourly basis with 20$ per hour
 98% Accuracy achieved in Business Partner ETL

100% Reusable Working Solution for Business


partner migration till 1610 HANA Version

You might also like