NTPC Anta Combined Cycle
NTPC Anta Combined Cycle
NTPC Anta Combined Cycle
NTPC ANTA
A COMBINED CYCLE POWER PLANT
RAJENDRA JAT
DEPUTY MANAGER
(EMD)
6 June 2018 1
NTPC ANTA
6 June 2018 4
NTPC ANTA- Brief
Introduction
• INSTALLED IN 1989 (NTPC’S FIRST GAS BASED
POWER PLANT)
• COMBINED CYCLE POWER PLANT
• DUAL FUEL- NATURAL GAS & NAPTHA
• TOTAL INSTALLED CAPACITY- 419 MW
• NTPC’S ONLY POWER PLANT IN RAJASTHAN
• FUEL SUPPLY – GAIL (HVJ Pipe Line)
• WATER- CHAMBAL (Right Main Canal)
6 June 2018 5
Gas Turbine Generators (GT’s)
6 June 2018 7
GENERATION COST FOR NTPC ANTA
GENERATION COST VARIES WITH TYPE OF FUEL
•NAPTHA – 9 TO 10 RS/UNIT
6 June 2018 8
Combined Cycle Power Plant
6 June 2018 9
Unit Auxiliary
Transformer
6 June 2018 10
WEST HEAT RECOVERY BOILER (WHRB)
VERTICAL NON FIRED BOILER
6 June 2018 14
6 June 2018 PMI Revision 00 15
GENERATOR ROTOR
6 June 2018 16
Factors Affecting Output of Gas Power
Plants
EXHAUST
FUEL GAS
(100 %) TURBINE HEAT
(67 %)
MISC.
(3.5 %)
6 June 2018
C:\UMESH\DEPT\GTDRG01.PPT....005 19
TOTAL POWER 45% (GT=29.5 % +ST=15.5 %)
EXHAUST
FUEL GAS
(100 %) TURBINE HEAT
(67 %)
MISC.
(3.5 %)
6 June 2018 21
SWITCHYARD @ NTPC ANTA
1. BHILWARA 1
2. BHILWARA 2
3. KOTA
4. RAPP
5. DAUSA
6. LALSOT
6 June 2018 23
VOLTAGE LEVELS AT NTPC ANTA
220kV- (GRID VOLTAGE)
10.5kV – GAS TURBINE GENERATOR OUTPUT
15.5kV – STG OUTPUT VOLTAGE
6.6kV – BUS FOR HT DRIVES & FOR UAT’S
1.37kV – STARTING POWER
415V – LT DRIVES
DC VOLTAGE LEVELS
220V DC
48V DC
6 June 2018 25
THANK YOU