Projects' Procurement Process Control: Rejected Rejected Rejected Rejected

The document outlines a procurement process control for projects that includes multiple review steps. Key parts of the process include a procurement list review, potential bidder list revision, bid explanation meetings, project proposals, inspections at various stages, and a final disposition report. The goal is to ensure quality control at each step of procuring items for projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
90 views1 page

Projects' Procurement Process Control: Rejected Rejected Rejected Rejected

The document outlines a procurement process control for projects that includes multiple review steps. Key parts of the process include a procurement list review, potential bidder list revision, bid explanation meetings, project proposals, inspections at various stages, and a final disposition report. The goal is to ensure quality control at each step of procuring items for projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 1

Projects’ Procurement Process Control

•Project Specification
Rejected Rejected Rejected
•SAMSS Rejected

•Form-175
•Drawings
Requisition
Quality Plan Procurement List
Review

•Review Quality Plan Accepted Work Order


•QA/QC Manager Qualification
Accepted Inspection Accepted
PO by
•QA/QC Supervisor Qualification Assignment
Review QMU
•Quality Personnel Including of Package
the Subcontractors
•Review all the Procurement Activities •Project Specification •Complete Copy of Un-Priced
•Review all Work ITPs •SAMSS PO
•Organization Charts Potential Bidder •Form-175 •Vendor Inspection and Test
List Rev. •Drawings Plan (ITP)
•Vender Approval •NMR.
Bid Explanation •Level of Inspection
Meeting •Copy of Waivers ASC AOC/L AOC/T QCU
•CV. Resume of Inspector
•Pass on Any Concern SIS Accepted •Pre-Inspection Meeting Agenda
from PID & OID or
•Present Schedule Q R.V.L

Rejected
•Special Requirements
Project • High Material Cost
Proposal • Complex Equipment
Pre-Inspection
Rejected Accepted • Critical Item involving Safety, Environment,
Survey Meeting
Reliability & Productivity of the Operation
•Review Novated Orders Assessment
•Past Experience with the Equipment/Vendor
•Inspection Level

SAPMT/ Finalize ITP


Contractor Points
(R, W & H)

Disposition Final In Progress Fabrication


PID
Report Inspection Inspection Stage

•Final Disposition Report to •To be Reviewed •Contractor to Issue •Un-announced Quality •Two Weeks Look Ahead
be Submitted to PID by SAIR Final Release Visit Schedule
•Final Inspection on- •Inspection Monitoring •Spot Inspection Visits.
Hold Report
•Inspector Evaluation