Tot - ST 1
Tot - ST 1
Tot - ST 1
Traverse survey
Triangulation survey
Plane table survey
Which includes:
1. Linear Measurements
2. Angular Measurements
3. Height Measurements
Linear measurements we usually do with:
chain
Tape
Substance bar
EDM (Electronic distance measurement instrument)
GPS (Global Positioning System)
measuring elevation
measuring height difference
measuring height difference with multiple
instrument positions
levelling
slope setting
setting out with horizontal distance
levelling of ceilings
Total station is a combination of :
EDM
Theodolite
Auto Leveler
Microprocessor with specific memory
Battery/spare
which works about 5 working hours
5. Shooting points
a) Identifying the important points to shoot
b) shooting points
c) Shooting additional points
d) Noting the special features
7.Plotting/Map generation.
Computer software packages
The following post processing computer software
packages are in use for various engineering
applications.
1.Arc Pad, arc view, arc info
-conversion from raster to vector form
Have keen observation on the prism boy’s attitude. When high precision is
required, use the prism tripod, to avoid human error.
The position of prism shall always be on hard surface instead of soft soil.
Focusing shall be exactly at the centre of prism, with the help of cross
hairs and prism plate.
While measuring the instrument height and prism height, enough attention
shall be diverted. Also, have keen observation while entering the above
data.
Note the location and coordinates of station point and back sight so that
specified intermediate points can be checked at later date.
Obtain a soft copy of field work raw data from the survey agency so that
the results can be checked at any time.