100% found this document useful (1 vote)
4K views1 page

Turtle Diagram (Calibration)

The document describes the process for calibrating turtle diagram gage equipment. It lists the key machines, equipment, standards, and tools used in calibration. It also identifies the people and departments involved, including the calibration technician, quality manager, tool crib attendant, quality engineering, and purchasing. The process receives gages and cleans them before verifying and adjusting if needed. Technicians then record the results before releasing the calibrated gages.

Uploaded by

DL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views1 page

Turtle Diagram (Calibration)

The document describes the process for calibrating turtle diagram gage equipment. It lists the key machines, equipment, standards, and tools used in calibration. It also identifies the people and departments involved, including the calibration technician, quality manager, tool crib attendant, quality engineering, and purchasing. The process receives gages and cleans them before verifying and adjusting if needed. Technicians then record the results before releasing the calibrated gages.

Uploaded by

DL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 1

TURTLE DIAGRAM GAGE CALIBRATION

With what? With whom?


Machines/Equipment: Calibration lab equipment People involved with this process:
Standards (trace to NIST) Calibration Technician
Computer, software, printer Quality Manager
Hand tools Tool crib Attendant
Links/interfaces with involved parties:
Materials: Gage
Quality Engineering Purchasing
Cleaning supplies Process Engineering Gage Supplier

Inputs? Customer wants: Process Name Outputs? Customer need is


Gage calibration per fulfilled for:
schedule CCAL-D03 ___________________
Gage Calibration Calibrated and recorded gage
Input requirements. What are the Process Steps/Activities: per schedule CCAL-D03
inputs that determine what the Output requirements. What output
process must produce? _________________________
Receive Gage and Clean
criteria are used to determine that the
_________________________
Verify and Adjust (if required) output meets the input requirements?
Calibration schedule
Record Results
_________________________ Calibration records
Production schedule
Control plans _________________________
Release Gage Inspection and MSA results
Customer requirements Int./Ext. Customer feedback
JAN ROOVERS ASSOCIATES, INC.

Measure? How?
With what key criteria? Measurements/Assessments: Support processes: (Who helps and how?)
Gage performance Product Engineering Process Engineering
Gage availability Production Planning External Laboratory
Training Maintenance
Cost of calibration
Procedures/work instructions/control documents:
Audits
Calibration instructions Records, Database
Measurement System Analysis (MSA) records Manufacturers manuals Control plans

You might also like