Steel Melting Shop Procedures..: Prepared By: M G Sunil, Sse /TTC
Steel Melting Shop Procedures..: Prepared By: M G Sunil, Sse /TTC
PROCEDURES..
Prepared
by:
M G Sunil,
SSE /TTC
CONTENTS
Preparation of Charge Preparation of New Laddle
Only one person should give the instructions to the crane operator.
Use horn when heavy loads are transferred from one place to other.
As and when the crane is free, unload the scrap from the wagons.
Do not unload slag pot on dirt floor where water has accumulated.
MOULDING RoOM
CRITICAL STATIONS!!
Prepared
by:
M G Sunil,
SSE /TTC
CLOSE DOWN STATION
MAKING MOULD
SET, FOR
POURING , BY
CLOSING DOWN
COPE OVER
DRAG.
INSPECT THE
POURING STATION
CASTING OF WHEELS WITH BOTTOM INGATE
CONTROLLED AIR PRESSURE POURING
TECHNIQUE TRANSFERRED FROM M/S GRIFFIN
USA. BE
SPLITTING THE
WHEELS IN
RIGHT TIME SO
THAT DRIPPING
OF METAL/RISER
SHOULD NOT BE
IN WHEEL.
KEEP WHEEL S
GENTLY ON HW
KILN SLAT.
SPRUE WASH/ SPRUE
GRINDING
THE STUBS OF
FEEDERS FROM
RISER IS
WASHED WITH
THE HELP OF
COPPER
COATED 1INCH
GRAPHITE
ELECTRODE
WITH 1500
HOT STAMPING MACHINE
THE UNIQUE
NUMBER
SYSTEM IS
FOLLOWED
HERE BY
STAMPING THE
HEAT NUMBER
ON BACK HUB
AREA.
HUB CUTTING STATIONS
THE HUB
PORTION WHERE
THE AXLE IS
FITTING IS
ROUGHLY GAS
CUTTING DONE
AT THESE
STATION. TWO
CONVENTIONAL
& 2 CNC
NORMALISING
THE WHEELS
ARE BEING
NORMALISED IN
A ROTARY
HEARTH
FURNACE OF
FUEL HSD
WITH A ROTARY
HEARTH OF
CAPACITY 45*
RIM QUENCHING
TO INDUCE
HARDNESS AT
THE RIM
PORTION TO
WITH STAND THE
BRAKING
EFFECT &
DIFFERENT
TYPES OF
DYNAMIC LOADS
ANNEALING & HUB
QUENCHING
AFTER RIM
QUENCHING,
ANNEALING IS
DONE IN DRAW
FURNACE WITH
A CYCLE TIME
150 MIN.
LINEAR
FURNACE WITH
A VERTICAL
DRAG LINE
DRAG CLEANER :-
AFTER
SPLITTING
STATION DRAG
ARE CLEANED
BY SAND
BLASTING IN
DRAG CLEANER
WITH 105 AFS
SILICA SAND.
DRAG SPRAY STATION 1 & 2
DRAG ARE
SPRAYED WITH
FUSED SILICA
POWDER
SOLUTION WITH
TWO SPRAYING
GUN OF
QUANTITY 125-
175 ML FOR
DIFFERENT
COPE LINE
CTA 1 STATION :-
AFTER
SPLITTING THE
COPE CAN BE
INSPECTED IN
COPE TILTING
STATION (CTA1)
AND AFTER
CLEANING OLD
FUSED SAND IN
COPE SPRAY STATION 1 & 2
THE COPES ARE SPRAYED
FUSED SILICA SOLUTION WITH
DIFFERENT AREA LIKE HUB,
PLATE AND RIM WITH 03 GUNS
WITH QUANTITY OF 120 ML TO
200 ML WITH PROPER
OVERLAPING PATERN AND
PROPER ATOMISING
PRESSURE AND TRIGGER
PRESSURE AND TANK
PRESSURE AND GUN HEIGHT.