Key Presentation On Proposed Scheme For Conversion of Existing Overhead Network To Undergrounding System
Key Presentation On Proposed Scheme For Conversion of Existing Overhead Network To Undergrounding System
December 2017
FEATURES OF THE PROJECT
The main features of the project are hereunder:
Using high Quality Under Ground Power Cable;
Distribution Transformers capacity addition;
Elevated compact Distribution Transformer Structure in
space constraint locations
Provision of Road lighting with existing Luminaires, based
on Lux Level as per IS 1944 (Re-2013)
PROJECT BENEFIT TO BE ACHIEVED
Automatic Fault Location and early restoration;
Hazardous Water Logging Areas Isolated from the risk of Electrocution
ensuring safety requirements.
Reduction of Technical Losses and Improvement of Voltage Regulation
for maintaining quality Power Supply.
With the implementation of this project the Reliability Index will be
improved.
Existing system will be strengthened for handling more power to cater for
the future load growth10%;
Higher Redundancy of the distribution system shall improve the reliability
and availability of power.
Elimination of hooking and theft cases.
The visual pollution will be eliminated and safety of human life as well as
electrical equipment will be insured.
SCHEMATIC DIAGRAM OF THE PROPOSED UG NETWORK
EXISTING OVERHEAD 11kV NETWORK PROPOSED UNDERGROUND 11kV NETWORK
END POLE,
NO INTERCONNECTION RING MAIN UNIT: NORMALLY
CONNECTED TO FEEDER 2,
SUPPLY OF FEEDER 1
AVAILABLE AS NORMALLY
OPEN CONDITION
FEEDER-1 FEEDER-2
FEEDER-1 FEEDER-2
will be reduced to 0%
KEY DIAGRAM OF MAJOR EQUIPMENTS
ELEVATED TRANSFORMER STRUCTURE
COMPACT
SUBSTATION
R.M.U
DISTRIBUTION
TRANSFORMER
HDD: HORIZONTAL
DIRECTIONAL DRILLING
FOR MV CABLE LAYING
TRENCHLESS TECHNOLOGIES