0% found this document useful (0 votes)
105 views20 pages

C-RAN Brief Introduction

C-RAN is China Mobile's solution to address increasing data traffic and slow capacity growth challenges. It involves centralized baseband processing in a pooled baseband unit to enable collaborative radio technologies. This approach aims to reduce construction costs and power consumption by over 30% and 70% respectively. China Mobile has conducted several C-RAN field trials and is collaborating internationally on research. It proposes collaboration with Agilent on system measurement, SDR research, and proof-of-concept testing to further C-RAN development.

Uploaded by

Arvind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views20 pages

C-RAN Brief Introduction

C-RAN is China Mobile's solution to address increasing data traffic and slow capacity growth challenges. It involves centralized baseband processing in a pooled baseband unit to enable collaborative radio technologies. This approach aims to reduce construction costs and power consumption by over 30% and 70% respectively. China Mobile has conducted several C-RAN field trials and is collaborating internationally on research. It proposes collaboration with Agilent on system measurement, SDR research, and proof-of-concept testing to further C-RAN development.

Uploaded by

Arvind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 20

C-RAN:

the Next Big Thing after LTE


China Mobile Research Institute
Agenda

Challenges in mobile internet era

China mobiles solution: C-RAN

C-RAN progress

Proposals for collaboration with Agilent

2
Challenges in Mobile Internet Era

Fast increasing data traffic but slow capacity growth

Data Traffic
7 6.3 EB
Exabytes/Month 1 Exabyte = 1018 Byte
6
5
Gap
3.8 EB
4
3
2.2 EB
2 1.2 EB

1 0.24 EB
0.6 EB

0
2010 2011 2012 2013 2014 2015

*Source: Cisco VNI Mobile, 2011


3
Challenges in Mobile Internet Era

2G 3G LTE

Construction Cost !
Inter-cell Interference !
4
Challenges in Mobile Internet Era

BS cell site is the major source of power consumption.

Other Support
Equipment,
3%

Major
Equipment,
51%
Air Conditioners,
46%

*Source: Base on China Mobile survey on commercial networks


5
Agenda

Challenges in mobile internet era

China mobiles solution: C-RAN

C-RAN progress

Proposals for collaboration with Agilent

6
C-RAN: Road towards green radio access network

Virtual BS Pool
Centralized baseband pool
real time Cloud computing

Optical
Network

RRU RRU Collaborative radio


RRU

RRU Clean system target


RRU RRU
RRU

7
C-RANCentralized Baseband Pool

Traditional macro Distributed C-RAN Centralized


base-stations base-stations baseband pool

8
C-RANCollaborative Radio

interference
signal

Separately processing Joint-processing

9
C-RANReal-time Cloud Computing

App Service

TD-LTE
TD-LTE
TD-SCDMA
TD-SCDMA
GSM
GSM

Software Defined Radio


Traditional baseband equipments
based on
Virtualized Cloud Platform

10
C-RANClean System Target

Construction cost per site Power consumption


reduced by 1/3 reduced by at most 71%

50 29%
40
30
20 71%
10
0
Macro BS C-RAN saved
*Source: Base on China Mobile field trial surveys

11
Agenda

Challenges in mobile internet era

China mobiles solution: C-RAN

C-RAN progress

Proposals for collaboration with Agilent

12
C-RAN Roadmap

We are here

Long Term:
Address the real-time C-RAN Research Virtual BTS on real-time Cloud Commercial
cloud challenge
Data traffic analysis product
BBU pool research development

Mid-Term:
Address the SDR and Multi-mode and Collaborative Radio Drive CoMP research
Collaborative Radio
and field trial, pre-
challenge
commercial product

Near Term:
Address the fiber Centralization Deployment Expend C-RAN
resource and
management challenge
to 2G/3G/4G
networks

2010 2011 2012 2013 2014 2015

13
Prototype Development

Multi-standard Large-scale
GPP prototype Baseband pool
14
C-RAN Field Trial

Jilin
GSM

Beijing
G/T/L (on going)

C-RAN Trials Baoding


GSM

in China
Changsha
GSM
Zhaotong
GSM
Guangzhou
G/T/L (on going)
Dongguan
Zhuhai TD-SCDMA
TD-SCDMA

15
International Collaboration

16
Agenda

Challenges in mobile internet era

China mobiles solution: C-RAN

C-RAN progress

Proposals for collaboration with Agilent

17
Collaboration with Agilent

System SDR
Measurement Research

Baseband verification Physical layer acceleration


RF specification testing L2/L3 signal scheduling
Channel simulation Real-time operating system

18
C-RAN PoC Test (with GSM/TD-SCDMA/TD-LTE)

Uplink signal sensitivity


EVM/Freq. offset/ phase
noise of downlink signal
Consistency of multi-port
signals
Beam-forming test
CPRI signal test, e.g. time
synchronization
channel simulation

19
Summary

C-RAN is to address the challenges in


the mobile internet era.

Agilent could play an important role in


C-RAN test.

Collaboration makes win-win!


Thank you!
20

You might also like