Furnace chamber for controlled
combustion of coal
Cyclone reinjection of
incombustible
in to the furnace
Nozzle - Fluidising air is introduced at the base of the bed through a nozzle
distributor and used as both fluidisation and combustion air
Refractory - material is one that retains its strength at high temperatures
Burner - burner is a heating device which burns fuel oil
Loop seal - The cyclone separator diverts heavier combustion particulate
matter back to the CFB, through a loop seal assembly
Inside view enclosed water walls housing super heater
coils & screen tubes
Inside view enclosed water walls housing super heater
coils & screen tubes
Nozzle separation of heavy solids falling from the riser
Springs - support a load and allow movement
Guide - allow vertical expansion and restrict movement side wise
Buck stay - tube walls of the steam generator are supported by
buck stays having retainers that slide longitudinally
Drag chain carry coal in to the furnace
Guide - allow vertical expansion and restrict movement side wise
Buck stay - tube walls of the steam generator are supported by
buck stays having retainers that slide longitudinally
Economiser - heat exchange devices that heat fluids, usually water
Steam drum is a reservoir of water/steam at the top end of
the water tubes
Support hold a load at fixed position
Cooler - cooling of ash exiting from circulating fluidized bed
Conveying transporting cooled ash from bed ash cooler to silo
HGG combustion of liquid / gaseous fuel with air both for
fluidization and combustion
Blower - the solids recycle rate to the furnace is adjusted by changing
air flow rate from this blower
FD Fan - Draft is obtained by forcing air into the furnace by means of a
Fan both for combustion and fluidisation
Conveying transporting cooled ash from bed ash cooler to silo
1. Boiler erection is good
2. Boiler refractory is intact
3. Boiler light up practice is good
4. No wet/dry boiler preservation is being followed
5. Boiler lay out is good
NOTE
NOTE
01. Balancing required
02. Steam leakages and Oil leakages can be corrected
03. RLA study of Steam Turbo Generator
Conveyor carrying of crushed coal of required size in to the bunker
Tunnel Conveyor - bulk material handling from hopper to
crusher and screening
Crusher house plat form for installing crusher and screens in sequence
Crusher used to crush raw coal to required size
Shed storage of bulk coal in excess to meet the short fall during emergencies
Magnetic separator used to pick foreign material from bulk coal
to avoid damage to equipment
1.Except final conveyors, remaining conveyors and
associated structures got damaged
2.Crushing and screening equipment are subjected to heavy explosion