100% found this document useful (2 votes)
1K views8 pages

Work Breakdown Structure Case Study

1. The document presents a case study to develop a production line to produce 160 products per day. 2. It defines the work breakdown structure (WBS) which divides the work into 3 stations over 180 seconds each. 3. The productivity of the line is calculated to be 92% to complete all activities within the WBS duration.

Uploaded by

Nashwa Saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views8 pages

Work Breakdown Structure Case Study

1. The document presents a case study to develop a production line to produce 160 products per day. 2. It defines the work breakdown structure (WBS) which divides the work into 3 stations over 180 seconds each. 3. The productivity of the line is calculated to be 92% to complete all activities within the WBS duration.

Uploaded by

Nashwa Saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 8

Case Study

Develop Production Line


Activity Duration Relation
A 60
B 80 A
C 30 A
D 40 C
E 40 B,D
F 50 A
G 100 F
H 70 D,G
I 30 E,H

1. We need to product 160 p/d


2. Create WBS
3. Define the productivity for the line
WBS duration
Station duration = 1 day / productivity
=(1 day *8 hours* 60 minute * 60 second) /160
180 second /p
WBS count
Total activates duration/wbs duration
500/180
2.78
3
Productivity
Total activates duration / (wbs duration * wbs
count)
500/(180*3)
92%
B E
80 40
Activity Duration Relation A
C D I
60
A 60 30 40 30
Start
B 80 A END
F
G H
C 30 A 50
100 70
D 40 C

E 40 B,D 1. A60+B80+E40+I30=210
F 50 A 2. A60+C30+D40+E40+I30=200
G 100 F
3. A60+C30+D40+H70+I30=230
4. A60+F50+G100+H70+I30=310
H 70 D,G

I 30 E,H
Station Activit Origin Remai Relatio Remar
y al ning n k
Durati Durati
on on
Wbs1 A 60 120 B,C,F 170
B 80 40 C,F 10
C 30 10 F,D
Wbs2 F 50 130 D,G 150
G 100 30 D 30
wbs3 D 40 140 E,H 180
H 70 70 E 0
E 40 30 I
B 80 E 40
I 30 0
A
Start D
60 I 30 END
C 30 40

F 50 G H
100 70
Station Activit Origin Remai Relatio Remar
y al ning n k
Durati Durati
on on
Wbs1 A 60 120 B,C,F 170
B 80 40 C,F 10
C 30 10 F,D
Wbs2 F 50 130 D,G 150
G 100 30 D 30
wbs3 D 40 140 E,H 180
Wbs1 H 70 70 E 0
170
E 40 30 I
10 B 80 E 40
I 30 0
A
Start D
60 I 30 END
C 30 40

Wbs2 Wbs3
150 180
F 50 G H
30 100 70 0