1.OUTLINE PROCESS CHART.

2.FLOW PROCESS CHART (MAN-TYPE, MATERIAL-


TYPE AND EQUIPMENT-TYPE): THIS IS THE USE OF
SYMBOLS AND DESCRIPTION TO CHART THE SEQUENCE OF WORK.
THE PROCESS, THEN, SHOW WHAT IS HAPPENING AT DIFFERENT
STAGES. THE DISTANCES AND TIME MAY BE GIVEN.
3.
TWO HANDS PROCESS CHARTS.
4.MULTIPLE ACTIVITY CHARTS:
THIS TECHNIQUE IS USED TO SOLVE PROBLEMS WHERE A
NUMBER OF ITEMS ARE DEPENDENT ON EACH OTHER. THE AIM IS TO
REDUCE IDLE TIMES BY USING THE OPTIMUM NUMBER OF EACH
ITEM. IT DEPICTS THE OCCUPIED TIMES-BROKEN DOWN INTO THE
NUMBER OF DIFFERENT ACTIVITIES AND THE IDLE TIMES BOTH FOR
THE ORIGINAL AND PROPOSED METHODS OF DOING THE JOB.
OPERATION PROCESS CHART
THE OPERATION PROCESS CHART SHOWS THE CHRONOLOGICAL
SEQUENCE OF ALL OPERATIONS, INSPECTIONS, TIME ALLOWANCES, AND
MATERIALS USED IN A MANUFACTURING OR BUSINESS PROCESS, FROM
THE ARRIVAL OF RAW MATERIAL TO THE PACKAGING OF THE FINISHED
PRODUCT.
THE CHART DEPICTS THE ENTRANCE OF ALL COMPONENTS AND
SUBASSEMBLIES TO THE MAIN ASSEMBLY.
TWO SYMBOLS ARE USED IN CONSTRUCTING THE OPERATION PROCESS
CHART : AN OPERATION AND AN INSPECTION.
OPERATIONS CHART STEPS
STEP BY STEP PROCEDURES FOR PREPARNG AN OPERATIONS
CHART:
IDENTIFY THE PARTS TO BE MANUFACTURED AND PURCHASED
DETERMINE THE OPERATIONS REQUIRED TO FABRICATE EACH PART AND SEQUENCE
THEM
DETERMINE THE SEQUENCE OR ASSEMBLY FOR BUYOUTS AND FABRICATED PARTS
DRAW THE OPERATIONS CHART AS EXPLAINED
PUT TIME STANDARDS, OPERATION NUMBERS AND DESCRIPTIONS
CALCULATE AND WRITE DOWN THE TOTAL HOURS REQUIRED PER 1,000 UNITS
FLOW PROCESS CHARTS
A FLOW PROCESS CHART IS A CHART OF ALL THE ACTIVITIES INVOLVED IN A
PROCESS.
IT IS SIMILAR TO AN OPERATIONS PROCESS CHART, EXCEPT THAT MORE
DETAIL IS SHOWN BY INCLUDING TRANSPORTATIONS AND DELAYS AS WELL AS
OPERATIONS, INSPECTIONS, AND STORAGES.
NOT USUALLY USED FOR ENTIRE ASSEMBLIES, IT IS USED FOR JUST ONE
COMPONENT (OR OPERATOR)
ADD IN INFORMATION ON:
OPERATION DURATION (TIME TO COMPLETE)
DISTANCE TRAVELED (FOR TRANSPORT OPERATIONS)
GOOD FOR SHOWING SAVINGS OF A NEW METHOD.
PROCESS CHARTS SUMMARIZES THE WHOLE PROCESS
THEY ARE USED TO COMPARE THE EXISTING AND THE PROPOSED
METHODS
PROCESS IS OBSERVED, WHO, WHAT, WHERE, WHEN, AND HOW
QUESTIONS ARE ASKED
EVERY DETAIL IS UNDERSTOOD AND THE CHART OF THE EXISTING
SITUATION IS DRAWN
THREE TYPES

1. MATERIAL TYPE
2.MAN TYPE
3.EQUIPMENT TYPE
LEFT-HAND-RIGHT-HAND CHARTS
USEFUL IN ANALYZING THE WORK PERFORMED BY ONE PERSON AT ONE
SPECIFIC WORKSTATION. AS THE NAME IMPLIES, THE CHART FOLLOWS THE
MOTION OF THE LEFT AND RIGHT HANDS OF ONE OPERATOR .
EACH HAND OF THE WORKER IS TREATED AS AN ACTIVITY.
EACH HANDS ACTIVITIES ARE BROKEN INTO WORK ELEMENTS AND
PLOTTED SIDE BY SIDE ON A TIME SCALE.
SYMBOLS
TWO SYMBOLS ARE USED IN THIS CHART:
TRANSPORTATION (EITHER AN ARROW OR A SMALL CIRCLE)
ACTION (E.G., GRASP, POSITION, USE, RELEASE)
A SKETCH OF THE WORKPLACE IS DRAWN, INDICATING THE CONTENTS
OF THE BINS AND THE LOCATION OF TOOLS AND MATERIALS.
RECORD THE MOTIONS OF ONE HAND AT A TIME
USUALLY NECESSARY TO REDRAW THE CHART
MULTIPLE ACTIVITY CHARTS

ALSO KNOWN AS GANG PROCESS CHARTS


USED WHEN SEVERAL WORKERS OPERATE A SINGLE MACHINE OR
RENDER A SINGLE SERVICE
USED WHEN A SINGLE WORKER IS OPERATING SEVERAL MACHINES
USED TO SHOW THE EXACT RELATIONSHIP BETWEEN IDLE AND
OPERATING TIMES OF BOTH WORKERS AND MACHINES
AN OPERATION PERFORMED BY ONE MEMBER OF THE GROUP MAY
CONTINUE WHILE ANOTHER MEMBER IS PERFORMING MORE THAN ONE
OPERATION.
THE CHART SHOULD COVER THE COMPLETE CYCLE FOR THE LONGEST
PERFORMING MEMBER.