CMD Best Practices - 20161021
CMD Best Practices - 20161021
CMD Best Practices - 20161021
Best Practices
October, 2016
2
Culture Evolution
Perf(x) Culture Evolution @ CMD
FY87 FY95 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
CMD CMD
Start Expans Perf (x) Culture Initiative and Continous Improvment
Up ion
RTY
Manual System - Database - Real Time
Lean
ePerformance & eProductivity
Enterprise
Lean Design Activity : SMED - One Piece Flow - Takt Time - Complexity Reduction - Bar Code
TPM Implementation
ISO9001-2008 Version
ISO9001 Version 1994
Certified on 2010
Certified Since 1995 Surveillances 100% OK
CWQI
POKAYOKE
Mechanical, Electrical, Optical
3
3Q6S a continuous improvement
model to produce business results
4
3Q6S Organization Structure
3Q6S
Enrique Elizondo
Jose Ramirez
IT Programmer
Knowledge Mgmt Business Process 6's + Safety Quality Mgmt Lean Enterprise Employee Involvement
Eric de la Garza Tomas Garcia Blanca Jacobo Jesus Pequeo Juan Pablo Olivares Blanca Jacobo
BB BB GB BB GB GB
Berenice Gaytan Veronica Salazar Jaime Salazar Guadalupe Gzz Luis Guerrero Yadira Gomez
GB GB Supervisor GB GB GB
Roberto Gil David Hernandez Alfredo Sanchez Juan J. Castro Alvaro Gongora Alejandro Pozos
GB GB Suoervisor BB GB GB
Claudio Salguero
GB
5
What Has Done for Us?
Flexibility Focus Customer PPMs
27,500 600 1,800
27,000 1,660
27,000 500 1,600
26,600
1,400
26,500 400
26,150 1,200
26,000 25,720 300 1,000
767 779
25,400 800
25,500 200 586
600 543
25,000 100
400
24,500 0 200
FY'11 FY'12 FY'13 FY'14 FY'15
0
Orders Per Week Motors FY11 FY12 FY13 FY14 FY15
6
CMD Core Software Applications
Application Area Owner Objective Comments
Oracle ERP Production L. Martinez Plant manufacturing operations management Used at NLA, Motores,
Control REY
Integrated Production Production G. Rosales Production operations management Used at CMD only
System
Scrap Management Production G. Rosales Scrap Control management Used at CMD only,
System Motores Finance to see
use at CMD
Shop Floor System Production G. Rosales Shop Floor Scheduling and Production Management Used at CMD only
ePerformance Production G. Rosales Monitoring plant Operations behaviour Used at CMD only
OEE Production C. Gonzalez Manage Overall Equipment Efficiency Used at NLA, CMD
Quality Integrated Quality J. Pequeo Manage and Control Quality processes Used at CMD only
System
Motor Test Board Quality J. Pequeo Control and Measurement of electrical and torque Used at CMD only
Management elements
Gage Track Quality J. Pequeo Gage Control and Management Used at CMD only
Data Collection Defects Quality J. Pequeo Rolled Throughput Yield Used at CMD only
Future SPC Quality J. Pequeo Statistical Process Control Management Used at CMD only
Time and Attendance HR M. Silva Manage and Control time and attendance Used at NLA, Motores
7
CMD Core Software Applications
SisRe Manufacturing M. Gonzalez MRO Purchase and Inventory Management Used at CMD only
Trade Compliance Import-Export J. Barron Manage Pedimento and ICS per Annex 24 Used at NLA,
Vastera Motores, REY
Shop Floor System Scheduling P. Perez Shop Floor Scheduling and Production Management Used at CMD only
8
Best Practices Plant Sequence
On Line
1
2
500 Pcs
PSSP
500 Pcs
PULL CONCEPT
Varnish Kanban Kanban Kanban Kanban
3
500 Pcs 500 Pcs 500 Pcs 500 Pcs 500 Pcs
Production Normal Kanban Normal Kanban Kanban Kanban
4 500 Pcs 500 Pcs 500 Pcs 500 Pcs
500 Pcs Production Production
Kanban Normal Normal Kanban Kanban
5 500 Pcs Production Production 500 Pcs 500 Pcs
Kanban Kanban Kanban
6 500 Pcs 500 Pcs 500 Pcs
Normal Normal Normal Kanban
7 Production Production Production 500 Pcs
Kanban
8 500 Pcs
Kanban
9 500 Pcs
Guidelines
Winding As Pace Maker To All Production Areas
Basic Rule:
All Feeder Departments Must Be At Kb Location When Winding Sequence Is Completed On The Lines.
23 Product Families Throughout The Plant
8 Hac
15 Gpm
100+ Orders Per Day Or 500+ Orders Per Week
Min Order Qty. Of 25 Motors
Max Order Qty. : Open
9
Sequence Completion
Sequence Completion
10/13/16 7:30 Goal = 95%
Total Motores X74, 99%
38,600 100% MISC, 92%
(SICMD) X73, 89%
X78's Disponibles 20,611 80%
X69, 68%
MOTORES CON
SECUENCIAS 11,827 57.4% 60%
COMPLETAS
40%
20%
15%
13%
0%
X27 S25 CMD S25 COMPRADAS
10
Shaft Vision System
VICI Vision Shaft measurement
11
CMD Main Work Centers
4-Nov 11-Nov 18-Nov 25-Nov
Week2 Week3 Week4 Week5
BALROTOR 952 5780 16.47 1524 5780 26.37 797 5780 13.79 1683 5780 29.11
EMULADOR 2094 4865 43.04 3150 4865 64.75 500 4865 10.28 1100 4865 22.61
OVERSPRAY 1234 3400 36.29 1884 3400 55.41 2702 3400 79.47 947 3400 27.85
VERSAPACK 12315 42500 28.98 11104 42500 26.13 15176 42500 35.71 4651 42500 10.94
YASKAWA 1724 4250 40.56 2245 4250 52.82 2108 4250 49.6 816 4250 19.2
When capacity utilization exceeds 100%, the schedule needs to be reviewed and adjusted
12
Noise Tester Machine
More than 1600 Poka Yokes can be used during motor manufacture
.
14
E Learning
15
Automatic Test for Die-Cast Rotors
Detect:
Broken Bars, Blowholes Or Porosity, Wrong Bar Screw Angle,
Aluminum Alloy Quality, Short-circuits Between Laminations And
Bars
16
Detect Low/Loose Wire
17
Gemba Board
18
EKanban
19
EKanban
ACKNOWLEDGE SIGNAL
Supplier reviews the board and
acknowledges demand by
moving the Kanban to Demand
Accepted status and begins
producing parts
SEND SIGNAL
The Kanban is scanned by the SHIPPING
11 5
6 1
material handler as each As the product is shipped, the
container is consumed. This supplier moves cards to
moves the Kanban from On- Shipped status
Hand to Consumed
RECEIVING
As material is received into
Oracle, the system
automatically moves the
corresponding cards from
Shipped to On-Hand
20
Production Ishikawa Capture
21
Production Ishikawa Diagram
22
Lean Enterprise Tool System
Total Productive
Maintenance
23
OEE
24
Information Center for Each Station VSPD
For Variable Speed, there is Touch
Screen on each station
Operation Instruction
Drawings
25
Information Center for Each Station VSPD
Bill Of Material
RTY
26
Electronic Check List (Variable Speed)
-Electronic data file to specify the models of different families
- Reduces the use of paper
27
Serial Number at each Motor
Model tracking method that allows CMD get the motor information
Assembly Line
Operator number
Production date and hour
Consecutive Day of Year
Year
Consecutive Tracking number
Electrical Results from MTB
28
Predictive Maintenance Thermographs
Recommendation Severity
29
LOTO (Lock Out Tag Out)
-Se imparte a todo personal de mtto
mediante el e-learning
-Adaptado a CMD
-Recordatorios Anuales
-Nuevo Ingreso
-Aplica tambin para personal operativo-
Incluye video de como realizarlo
30 30
LOTO (Lock Out Tag Out)
Equipment
Locked
Delimited Area
31
Double Stack into the trailers
2
We use the second floor, 3
add 1 additional skid with minor weight
and use the next fixture to assure the
stability.
1
1- We add one cargo strap, These will
positively lock into the slots for added
security
2- We add one Diamond Corr Void Fill,
this reduce the lateral movement.
32
RTY System
33
RTY System
STATIONS MONITORING
CENTER
(REAL TIME
ANALYSIS)
34
Missing / Wrong Labels on motor
Label Scanning System :
RHEEM , TRANE & LENNOX
1 Scan Motor
Test Board ID Tag
Correct Wrong
Label Scanning all the nameplates ofLabel
Description: the motor.
Benefits: Assure the existence and the correct match between all the
labels. 35
Label Scanning System
2- Scan Motor
Nameplate
Correct Wrong
36
Finger Print Quick Access Data
CMD implemented a Software for quick access on
gage inventory using operator finger print :
Before After
37
Label Scanning Software Customer
Watsco
CMD implemented a Software for Scanning labels on
WATSCO models ; the process is as follows :
1. Scan the approved tag bar code to assure motor part number
2. Scan the nameplate bar code to match NIDEC part number
with customer part number.
3. Scan booklet bar code to assure kit installation.
4. Scan all L20 labels on the box , following the sequence
required by the drawing .
5. Get a data matrix label as evidence
for approved process .
38
Poka Yoke, Connector Lead Assembly
Machine
Connector block
Light system
Is clamped
Will not open if Green, Yellow & Red
It is assy. wrong
Camera
Needs Key
To Open if it
Assembled Wrong
39
Optical First Piece Inspection
40
Maintenance Software
Main Screen that using to open the List of all Maintenance Orders
Maintenance order Assigned, Pending and Finished
41
SPC Final Tester (VSP)
42
e-Performance Tools
e-PERFORMANCE Plant Lay Out Out Put by Deparment or P. Line Out Put per Hour by Deparmet
Efficiency by Depart. or P. Line Failures Top Ten (Pareto) Second Level Pareto
43
e-Performance Tools
Performance by Shift Resume Production Line Status Failures Loading Screen
44
Automatic Illumination System
Hours and
days that
Working the
line