Conversion Gate01
Conversion Gate01
Conversion Gate01
Early testing
Testing should start as early as possible in the Software Development
Life Cycle
Defect clustering
which states that a small number of modules contain most of the
defects detected.
SEVEN PRINCIPLES OF TESTING
Pesticide paradox -
If the same tests are repeated over and over again , eventually the
same test cases will no longer find new bugs
Finding and fixing defects does not help if the system build is
unusable and does not fulfill the users needs & requirements
Finding and fixing defects does not help if the system build is
unusable and does not fulfill the users needs & requirements
SDLC , STLC & V-MODEL
What are the various components of STLC?
Requirements Document
Preparation of Test Plan
Preparation of Test Cases
Execution of Test Cases
Analysis of Bugs
Reporting of Bugs
Tracking of Bugs till closure
Software Testing - Types of Testing
Microsoft Office
Excel Worksheet
Manual Testing Types -Unit Testing
Unit Test
Perform
Manual Testing Types - Integration Testing
Acceptance Test
Perform
Manual Testing Types -Acceptance Testing
After the bug fixed , testing the application whether the fixed
bug is affecting remaining functionality of the application or not.
Spelling Mistakes
Broken Links
Cloudy Directions
Means that right versions of databases are linked, APIS and middle
layer, to check the
whole configuration is rightly linked with the correct versions
Microsoft Office
Excel 97-2003 Worksheet
Functional Testing Vs Non-Functional Testing
Unit Testing
Smoke testing
Sanity testing
Integration Testing
Interface Testing
System Testing
Regression Testing
UAT
Functional Testing Vs Non-Functional Testing
Key Skills:
Load
Volume
Stress
Scalability
Stress Testing
Apache JMeter
LoadRunner
WebLOAD
Appvance
NeoLoad
LoadUI
WAPT
Loadster
Load Testing