Alternate Energy Resources For Leh-Ladakh Region
Alternate Energy Resources For Leh-Ladakh Region
Alternate Energy Resources For Leh-Ladakh Region
PREVIEW
DESIRED OUTCOMES
CHALLENGES
LOGISTICS MANAGEMENT.
AUTHORIZATION OF CHS.
Station
Present power load in summer (MW) Present power load in winter (MW)
Partapur
2
2.4
Hunder
0.5
0.6
Khalsar
0.5
0.6
Leh
10
12
Shesharthang
0.4
0.48
Karu
2
2.4
Tangste
1.5
1.8
Darbuke
1.20
1.5
Kiari
1.5
1.8
Nimmu
2
2.4
Nanak Hill
1.5
1.8
Nurla
1
1.2
Khalsti
0.4
0.48
Khumbathang
1.5
1.95
Biamah
0.35
0.375
Hanuthang
0.215
0.23
Achinathang
0.41
0.45
Lamayuru
0.4
0.44
Kargil
1.75
1.85
Budhkharbu
0.48
0.58
Dras
0.5
0.65
Total
30.105
35.985
Ser
No
1.
Nimu-Bazgo
Alchi
45.00
3 x 15.00
2.
Chutak
Kargil
44.00
4 x 11.00
3.
Stakna
Leh
4.00
2 x 2.00
4.
Iqbal
Kargil
3.75
3 x 1.25
5.
Igo-Mercellong
Leh
3.00
2 x 1.50
6.
Sanjak
Kargil
1.26
3 X 0.42
7.
Haftal
Zanskar (Kargil)
1.00
2 x 0.50
8.
Marpachoo
Dras (Kargil)
0.75
3 x 0.25
9.
Hunder
Nobra (Leh)
0.40
2 x 0.20
10.
Bazgo
Leh
0.30
2 x 0.15
11.
Sumoor
Nobra(Leh)
0.10
2 x 0.05
TOTAL
103.56
Name of Project
Capacity (MW)
1.
9.00
2.
9.00
3.
9.00
4.
9.00
5.
9.00
6.
9.00
7.
Pugah Geothermal
5.00
TOTAL
59.00
Name of Work
Cost in
Lakhs
1.
1159.73
2.
1297.78
3.
4.
5.
339.87
6.
151.53
7.
163.25
8.
225.90
9.
126.29
10.
Provn of Ext Elect for 259 Transit Camp and Kargil Battle School at Dras.
11.
1269.86
12.
1181.05
719.14
69.44
Total
88.92
6792.76
BASE
CAMP
BIAMAH/ACHINATHANG/HAN
UTHANG
DAR
S
11 KV
1.25
MW
KARG
DRAS.
IL
R
CHUT
66KV
AK
4X11
MW
WINTER
10-12
MWKUMBATHA
NG
SASOM
A
PANGON
LAMAYA
RU
G
TSO
BUNDKHA
RBU
11 KV
1.5 MW
KHALS
AR
SANJ
AK
KHAL
SE
NIMM
0
SURU.
R
66 KV
3X15M
W
INDUS
.R
CHANG
LA
NANAK
HILL
LUK
WE
TANGS
TE
LEH
KAR
U
KIAR
I
NYOM
A
Item
Summer
Winter
Rs 78
1.
Rs 67
2.
ELECTRICITY/ UNIT
HYDEL POWER
Rs 9.63
3.
CAPITIVE GENERATION/UNIT
Rs 28
to
Rs 30
HYDRO
PRESENT,
FOR
REDUCED.
PLANT &
Name of Work
Cost in
Lakhs
1.
1967.30
2.
3719.81
TOTAL
5687.11
GEOTHERMAL
AVAILABLE
ADVANTAGE.
IN
THE
REGION
TO
THE
MAXIMUM
POSSIBLE
DESIRED OUTCOMES
DESIRED OUTCOMES
SOLAR COOKER.
SOLAR FARMS.
ADVANTAGES
ECO-FRIENDLY.
DESIRED OUTCOMES
JAI HIND