ALTERNATE ENERGY RESOURCES

FOR LEH LADAKH REGION

PREVIEW

CHALLENGES IN LEH LADAKH REGION

RENEWABLE ENERGY RESOURCES

DESIRED OUTCOMES

CHALLENGES IN LEH LADAKH REGION

CHALLENGES

REMOTE & HARSH CLIMATE.

MAX REQMT OF HEATING LOAD.

MANNING & MAINTENANCE OF INSTALLATIONS.

LOGISTICS MANAGEMENT.

PRESERVATION OF BIO DIVERSITY.

DIFFICULTIES WITH HYDEL POWER.

CONSTRAINTS IN POWER GENERATION & TRANSMISSION.

FROZEN GROUND CONDITIONS.

AUTHORIZATION OF CHS.

LIVING IN TEMP SHELTERS/TENTS.

NARROW BASE OF BUILDING CONTRACTORS.

STATION WISE POWER REQUREMENT


Ser No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Station
Present power load in summer (MW) Present power load in winter (MW)
Partapur
2
2.4
Hunder
0.5
0.6
Khalsar
0.5
0.6
Leh
10
12
Shesharthang
0.4
0.48
Karu
2
2.4
Tangste
1.5
1.8
Darbuke
1.20
1.5
Kiari
1.5
1.8
Nimmu
2
2.4
Nanak Hill
1.5
1.8
Nurla
1
1.2
Khalsti
0.4
0.48
Khumbathang
1.5
1.95
Biamah
0.35
0.375
Hanuthang
0.215
0.23
Achinathang
0.41
0.45
Lamayuru
0.4
0.44
Kargil
1.75
1.85
Budhkharbu
0.48
0.58
Dras
0.5
0.65
Total

30.105

35.985

Ser
No

HYDEL PROJECTS IN OPERATION IN


LADAKH
Name of Project
Location
Capacity
Configuration
(MW)

1.

Nimu-Bazgo

Alchi

45.00

3 x 15.00

2.

Chutak

Kargil

44.00

4 x 11.00

3.

Stakna

Leh

4.00

2 x 2.00

4.

Iqbal

Kargil

3.75

3 x 1.25

5.

Igo-Mercellong

Leh

3.00

2 x 1.50

6.

Sanjak

Kargil

1.26

3 X 0.42

7.

Haftal

Zanskar (Kargil)

1.00

2 x 0.50

8.

Marpachoo

Dras (Kargil)

0.75

3 x 0.25

9.

Hunder

Nobra (Leh)

0.40

2 x 0.20

10.

Bazgo

Leh

0.30

2 x 0.15

11.

Sumoor

Nobra(Leh)

0.10

2 x 0.05

TOTAL

103.56

PROJECTS UNDER EXECUTION/PLANNED


FOR EXECUTION
Ser No

Name of Project

Capacity (MW)

1.

Dah SHP (Batallick)

9.00

2.

Hanu SHP (Batallick)

9.00

3.

Dumkhar SHP (Leh)

9.00

4.

Rangdo SHP (Nubra)

9.00

5.

Tamasha Nallah SHP (Zanaskar)

9.00

6.

Bairaas SHP (Dras)

9.00

7.

Pugah Geothermal

5.00
TOTAL

59.00

CHUTAK HYDEL POWER PROJECT

NIMU-BAZGO HYDEL POWER PROJECT

NIMU-BAZGO HYDEL POWER PROJECT

WORKS SANCTIONED SINCE 2012 FOR


UTILIZATION OF HYDEL POWER
Ser
No

Name of Work

Cost in
Lakhs

1.

Ext Elect Network at Khumbathang.

1159.73

2.

Augmentation of Power Supply at Leh Grn (Ph-I).

1297.78

3.

External Elect Supply for Nimu Stn.

4.

Provn of Electricity Supply from SEB to Karu (Shesharthang) Grn.

5.

Provn of Ext Electricity for 192 Mtn Bde Tps at Achinathang.

339.87

6.

Provn of Ext Electricity for 192 Mtn Bde Tps at Biamah.

151.53

7.

Provn of Ext Electricity for 192 Mtn Bde Tps at Hanuthang.

163.25

8.

Provn of Ext Electricity for Lamayuru.

225.90

9.

Provn of Ext Elect for 37 (I) R & O Flight at Khaltse.

126.29

10.

Provn of Ext Elect for 259 Transit Camp and Kargil Battle School at Dras.

11.

Augmentation of Power Supply at Leh Grn (Ph-II).

1269.86

12.

Provn of Ext Elect Supply to Nanak Hill Mil Stn.

1181.05

719.14
69.44

Total

88.92

6792.76

HYDEL POWER TO DEFENCE


ESTABLISTMENTS
MARPOCH
OO
11 KV
0.75
MW

BASE
CAMP

BIAMAH/ACHINATHANG/HAN
UTHANG

DAR
S
11 KV
1.25
MW
KARG
DRAS.
IL
R

CHUT
66KV
AK
4X11
MW
WINTER
10-12
MWKUMBATHA
NG

SASOM
A
PANGON

LAMAYA
RU

G
TSO

BUNDKHA
RBU
11 KV
1.5 MW

KHALS
AR

SANJ
AK
KHAL
SE
NIMM
0

SURU.
R

66 KV
3X15M
W

INDUS
.R

CHANG
LA
NANAK
HILL

LUK
WE

TANGS
TE
LEH

KAR
U

KIAR
I
NYOM
A

ENERGY COST IN LEH LADAKH REGION


Ser No

Item

Summer

Winter
Rs 78

1.

DIESEL PER LITRE

Rs 67

2.

ELECTRICITY/ UNIT
HYDEL POWER

Rs 9.63

3.

CAPITIVE GENERATION/UNIT

Rs 28
to
Rs 30

HYDRO

JAMMU & KASHMIR STATE HOLDS A POTENTIAL OF UP TO 20,000 MW,

WITH THE LADAKH REGION HAVING AN IDENTIFIED POTENTIAL TO GENERATE


1000 MW.

DIFFICULTIES WITH HYDEL POWER

LADAKH IS NOT CONNECTED TO THE NORTHERN GRID AT


ONLY AN INTERNAL 66 KV LINE EXISTS IN THE REGION.

PRESENT,

CONSTRUCTION OF 220 KV GRID LINE INTO LADAKH IS YET TO BE


STARTED.

ONLY 11 HYDEL POWER PROJECTS ARE OPERATIONAL IN LEH /


LADAKH
REGION OF VARYING CAPACITIES
VARYING FROM
0.1 MW TO 45 MW.

SMALLER CAPACITY HYDEL POWER PROJECTS MAINLY CATERS


LOCAL POPULATION.

SUPPLY TO DEFENCE ESTABLISHMENTS IN WINTER GETS

DEMAND IN DEFENCE ESTABLISHMENTS IN WINTER IS MORE.

FOR

REDUCED.

CERTAIN AUGMENTATION THROUGH CAPTIVE GENERATION MAY BE


REQD IN WINTER.

CONSTRAINTS IN POWER GENERATION &


TRANSMISSION

SNAPPING OF OH LINES DUE TO WIND & SNOW LOAD.

CRACKING OF UNDERGROUND CABLES IN LOCATIONS WHERE EXTREME


COLD IS EXPERIENCED.

REQUIREMENT OF PRE & POST MAINTENANCE OF OH LINES,


EQUIPMENT BEFORE & AFTER SERVICE IN WINTER SEASON.

ELECTRIC BREAKDOWN DUE TO SHORT CIRCUITING.

PLANT &

FREEZING OF WATER AT SURFACE REDUCES POWER GENERATION IN


HYDEL PLANTS.

CRACKING OF RUBBER PARTS & CABLES.

RENEWABLE ENERGY RESOURCES


IN LADAKH

RENEWABLE ENERGY RESOURCES IN


LADAKH
SOLAR

DIRECT NORMAL IRRADIANCE (DNI) : LEH DIST 5.36 kWh/sqm/day.

AMONG THE AREAS WITH HIGHEST INSOLATION LEVELS IN THE


WORLD, i.e. 1200 W/sqm AT SOME AREAS.

HIGHEST CLARITY INDEX IN INDIA.

AVERAGE OF 300 + DAYS OF SUNSHINE IN A YEAR; LADAKH IS IN


THE RAIN-SHADOW REGION OF THE HIMALAYAS.

THE LOW TEMPERATURES ALLOW FOR BETTER EFFICIENCY OF


SOLAR PHOTO-VOLTAIC TECHNOLOGY.

SOLAR PROJECTS SANCTIONED


Ser
No

Name of Work

Cost in
Lakhs

1.

Provn of 0.8 MW Solar Photo Voltaic (SPV) at Karu


(Shesharthang) and Partapur.

1967.30

2.

Provn of 3 MW Solar Energy Project in Leh Region


(Tangtse and Durbuk).

3719.81

TOTAL

5687.11

SPV 0.4 MW AT SHESHARTHANG

SPV 0.4 MW AT SHESHARTHANG

SPV 0.4 MW AT SHESHARTHANG

SPV 0.4 MW AT SHESHARTHANG

SPV 0.4 MW AT SHESHARTHANG

SPV 50 KVA AT SIACHEN BASE CAMP

SPV 50 KVA AT SIACHEN BASE CAMP

SPV 50 KVA AT SIACHEN BASE CAMP

RENEWABLE ENERGY RESOURCES


IN LADAKH
WIND

ANNUAL AVERAGE WIND-SPEED IN THE VARIOUS POCKETS OF THE


REGION IS 6.3 m/s.

GEOTHERMAL

LARGEST GEOTHERMAL RESERVOIRS IN THE COUNTRY AT PUGA VALLEY


& CHUMATHANG, WITH A POTENTIAL FOR GENERATION UP TO 150 MW.

LADAKH VISION STATEMENT 2025


TO TRANSFORM LADAKH FROM AN ENERGY DEFICIENT TO ENERGY
SURPLUS REGION & SUPPLY THE LOCAL POPULATION WITH RELIABLE,
AFFORDABLE & QUALITY POWER BY TRAPPING THE RENEWABLE ENERGY
SOURCES

AVAILABLE

ADVANTAGE.

IN

THE

REGION

TO

THE

MAXIMUM

POSSIBLE

DESIRED OUTCOMES

DESIRED OUTCOMES

WHILE LADAKH LACKS NATURAL RESOURCES, IT HAS THE BEST


REGIONS FOR DEVELOPMENT OF SOLAR PROJECTS.
IN ORDER TO CONSERVE USE OF ELECTRICITY, DIESEL, KEROSENE,
BIOMASS, SOME SOLAR THERMAL SYSTEMS AS VIABLE OPTIONS ARE :-

SOLAR WATER HEATING.

SOLAR COOKER.

SOLAR PASSIVE HOUSES.

SOLAR GREEN HOUSES.

SOLAR FARMS.

ADVANTAGES

ANNUAL SAVING OF SEVERAL KILO LITERS OF DIESEL & KEROSENE.

ECO-FRIENDLY.

WOULD REDUCE DEFORESTATION, DESERTIFICATION PROCESS.

IMPROVE LIVING CONDITION OF PEOPLE IN WINTER CONDITIONS.

LESS TIME CONSUMING & AFFORDABLE LUXURY FOR COMMON MAN.

DESIRED OUTCOMES

ADHERE TO LADAKH VISION STATEMENT 2025.

ECO FRIENDLY PROJECTS.

NEW DESIGN IDEAS.

INFUSION OF LATEST TECHNOLOGY.

INFUSION OF MODERN MATERIALS.

INDUCTION OF MODERN CONSTRUCTION AGENCIES.

SAVINGS ON MANPOWER, MATERIAL & TIME.